Concept explainers
The second paragraph of this chapter argues that a retail building that is damaged during an earthquake and must be demolished may not constitute a failure. Do you agree with this assessment? Defend your position.
Whether the given assessment is agreeable that a retail building that was damaged during an earthquake and must be demolished may not constitute a failure.
Explanation of Solution
An argument which is as follows:
A retail building and a hospital, both of which are constructed in a seismically active area and are designed considering the maximum likely earthquake for the area. Several years after the structures are built, the design earthquake occurs.The building did not collapse during the earthquake and no lives were lost. However, both buildings suffer some significant structural damage and must be demolished. Did both buildings fail during the earthquake?
The argumentthat the hospital building failed and the retail store didn’t is credible. The claim is valid as the design objectives built into the international building codes and modern building codes, that categorize structures based on their risk to human life and put these two structures in different categories with different performance requirements. The retail structure comes in the category II structure with substantial hazard to human life in the event of failure.
The design requirements for the retail structure are not to collapse during the design earthquake and allow occupants to safely exit the building, but it is not expected to survive the design earthquake.
Therefore, the retail structure is not a failure and is built according to the specifications.
Want to see more full solutions like this?
Chapter 5 Solutions
Foundation Design: Principles and Practices (3rd Edition)
Additional Engineering Textbook Solutions
Elementary Surveying: An Introduction To Geomatics (15th Edition)
Elementary Surveying (14th Edition)
Structural Analysis (10th Edition)
Materials for Civil and Construction Engineers (4th Edition)
Problem Solving with C++ (10th Edition)
Starting Out with C++: Early Objects
- Describe in language appropriate to a client for a multistory office building what the structural system is expected to accommodate during a seismic event based on the codes and the understanding of the forces in an earthquake.arrow_forwardGive one (1) earthquake that happened in the past (local/global), describe the seismic hazard that occurred during the said seismic activity, and recommend your mitigation/solution to minimize its intensity if it ever happens again.arrow_forwardWhat degree are the operations at a Juneau Alsaka Sawmill Site susceptible to seismic events? What actions could be incorporated to reduce any risks that are identify.arrow_forward
- What are the factors to consider to minimize the damage done by earthquakes and what should we consider(as a Civil Engineer) for earthquakes.arrow_forwardExplain the below graph do we have any unsafe situation in this gapharrow_forward.What inspired the Architect and the Structural Engineer to conceive and design such kind of a structure and what were the challenges he encountered during the : "Shanghai Super Tower" a. Design stage b. Construction stagearrow_forward
- Using Internet resources, watch a few video clips on the Minnesota I35 bridgecollapse on August 1, 2007, read material online about the collapse, and tryto understand the reasons behind the failure of the bridge. Investigate if thefailure was brittle or ductile overall.arrow_forwardWas the cause of the delay beyond the contractor’s control? Did the contractor fail to take normal precautions?arrow_forwardExplain your understanding of the following general construction matters:2.1 What does ‘time-barred’ mean? In your explanation you should provide a general introduction, followed by atleast three (3) examples of the most important periods in construction work where time-barring would occur (12)arrow_forward
- Seismic Principle Candidate Questions. 10. Loading to be included in the seismic analysis 11. How is Seismic design category (SC) is related to maximum height of structure? 12. How do you construct Design Response Spectrum?arrow_forwardHow is ground acceleration related to the seismic design of the building?arrow_forwardDescribe the basis of management-by-exception in construction and create a possible scenario or example of a possible occurrence.arrow_forward