Prepare a bill of material for (a) a pair of eyeglasses and its case or (b) a fast-food sandwich (visit a local sandwich shop like Subway, McDonald’s, Blimpie, Quizno’s: perhaps a clerk or the manager will provide you with details on the quantity or weight of various ingredients—otherwise, estimate the quantities).
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
What information is contained in a bill of material?
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 1 clamp and 2 housings. Each clamp has 1 handle and 1 casting. Each housing has 2 bearings and 1 shaft. There is no inventory on hand.
A. Design a product structure noting the quantities for each item and show the low-level coding.
B. Determine the gross quantities needed of each item if you are to assemble 50 brackets.
C. Compute the net quantities if there are 25 of the base and 100 of the clamp in stock.
As the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, two springs, and four clamps. The base isassembled from one clamp and two housings. Each clamp has one handle and one casting. Each housing has two bearings and one shaft. There is no inventory on hand.a) Design a product structure noting the quantities for each item and show the low-level coding.b) Determine the gross quantities needed of each item if you are to assemble 50 brackets.c) Compute the net quantities needed if there are 25 of the base and 100 of the clamp in stock.
Chapter 5 Solutions
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Ch. 5.S - Prob. 1DQCh. 5.S - Prob. 2DQCh. 5.S - Prob. 3DQCh. 5.S - Discuss the 3 Rs.Ch. 5.S - Prob. 5DQCh. 5.S - Prob. 6DQCh. 5.S - Prob. 7DQCh. 5.S - Prob. 1PCh. 5.S - Prob. 2PCh. 5.S - Prob. 3P
Ch. 5.S - Prob. 4PCh. 5.S - Prob. 5PCh. 5.S - Prob. 6PCh. 5.S - Prob. 7PCh. 5.S - Prob. 8PCh. 5.S - Prob. 9PCh. 5.S - Prob. 10PCh. 5.S - A Southern Georgia school district is considering...Ch. 5.S - Prob. 12PCh. 5.S - Prob. 13PCh. 5.S - Prob. 14PCh. 5.S - Prob. 15PCh. 5.S - Prob. 16PCh. 5.S - Prob. 17PCh. 5.S - Prob. 18PCh. 5.S - Prob. 19PCh. 5.S - Prob. 1.1VCCh. 5.S - Prob. 1.2VCCh. 5.S - Prob. 1.3VCCh. 5.S - Prob. 2.1VCCh. 5.S - Prob. 2.2VCCh. 5.S - Prob. 2.3VCCh. 5 - Prob. 1EDCh. 5 - Prob. 1DQCh. 5 - What techniques do we use to define a product? ...Ch. 5 - Prob. 3DQCh. 5 - Prob. 4DQCh. 5 - Prob. 5DQCh. 5 - Prob. 6DQCh. 5 - Describe four organizational approaches to product...Ch. 5 - Explain what is meant by robust design.Ch. 5 - Prob. 9DQCh. 5 - What information is contained in a bill of...Ch. 5 - What information is contained in an engineering...Ch. 5 - What information is contained in an assembly...Ch. 5 - Prob. 13DQCh. 5 - Explain how the house of quality translates...Ch. 5 - Prob. 15DQCh. 5 - Prob. 16DQCh. 5 - Why are the direct interaction and surrogate...Ch. 5 - Prob. 18DQCh. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Construct a house of quality matrix for a...Ch. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prepare a bill of material for (a) a pair of...Ch. 5 - Prob. 10PCh. 5 - Prepare a script for telephone callers at the...Ch. 5 - Prob. 12PCh. 5 - Prob. 18PCh. 5 - Review strategic process positioning options for...Ch. 5 - Select a service business that involves...Ch. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Residents of Mill River have fond memories of ice...Ch. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 26PCh. 5 - Prob. 27PCh. 5 - Prob. 1CSCh. 5 - Prob. 2CSCh. 5 - Prob. 3CSCh. 5 - Prob. 1VCCh. 5 - Prob. 2VCCh. 5 - Prob. 3VCCh. 5 - Prob. 4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- As the production planner for Xiangling HuProducts, Inc., you have been given a bill of material fora bracket that is made up of a base, two springs, and fourclamps. The base is assembled from one clamp and twohousings. Each clamp has one handle and one casting. Eachhousing has two bearings and one shaft. There is no inventoryon hand. a) Design a product structure noting the quantities for eachitem and show the low-level coding.b) Determine the gross quantities needed of each item if youare to assemble 50 brackets.c) Compute the net quantities needed if there are 25 of thebase and 100 of the clamp in stock.arrow_forwardThe hierarchy of components, their description, and the quantity of each needed to make one unit of a product are documented in: Select one: a. an engineering drawing. b. a list of group technology. c. a roadmap. d. a list of materials. and. a work order.arrow_forwardCalifornia Gardens, Inc., prewashes, shreds, and distributes a variety of salad mixes in 2-pound bags. Doug Voss, Operations VP, is considering a new Hi-Speed shredder to replacethe old machine, referred to in the shop as "Clunker." Hi-Speed will have a fixed cost of $85,000 per month and a variable cost of $1.25 per bag. Clunker has a fixed cost of only $44,000 per month, but a variable cost of$ 1.75. Selling price is $2.50 per bag.a) What is the crossover point in units (point of indifference) for the processes?b) What is the monthly profit or loss if the company changes to the Hi-Speed shredder and sells 60,000 bags per month? c) What is the monthly profit or loss if the company stays with Clunker and sells 60,000 bags per month?arrow_forward
- What is meant by break even analysis in operations ?arrow_forwardTwo different manufacturing processes are being considered formaking a new product. The first process is less capital-intensive,with fixed costs of only $46,400 per year and variable costs of$720 per unit. The second process has fixed costs of $400,100but has variable costs of only $210 per unit.a. What is the break-even quantity, beyond which the sec-ond process becomes more attractive than the first?b. If the expected annual sale for the product is 840 units,which process would you choose?arrow_forwardMarkland Manufacturing intends to increase capac-ity by overcoming a bottleneck operation by adding new equip-ment. Two vendors have presented proposals. The fixed costs for proposal A are $50,000, and for proposal B, $70,000. The variablecost for A is $12.00, and for B, $10.00. The revenue generated byeach unit is $20.00.a) What is the break-even point in units for proposal A?b) What is the break-even point in units for proposal B?arrow_forward
- The Total Manufacturing costs incurred for the month was $620,525. Beginning work inprocess was $152,000. There were $260,000 of partially finished goods remaining inwork in process inventory at the end of the month. What was the cost of goodsmanufactured during the month?arrow_forwardTwo different manufacturing processes are being considered for maing a new product. The fir proceess is less capital-intensive, with fixed costs of only $50,000 per year and variable costs of $700 per unit. The scond proess has fixed costs of $400,000 but has variable costs of only $200 per unit. If the expected annual sales for theproduct is 800 units, which process would you choose?arrow_forwardAs the production planner for Xiangling Hu Products, Inc., you have been given a bill of material for a bracket that is made up of a base, 2 springs, and 4 clamps. The base is assembled from 2 clamps and 1 housing. Each clamp has 1handle and 1 casting. Each housing has 2 bearings and 2 shafts. There is no inventory on hand. Part 3 b) Determine the gross quantities needed of each item if you are to assemble 150 brackets. Base: enter your response here units (enter your response as a whole number). Spring: enter your response here units (enter your response as a whole number). Clamp: enter your response here units (enter your response as a whole number). Housing: enter your response here units (enter your response as a whole number). Handle: enter your response here units (enter your response as a whole number). Casting: enter your response here units (enter your response as a whole number). Bearing: enter…arrow_forward
- Why is it important to match process capabilities with product requirements?arrow_forwardUsing the data in "Sroufe Manufacturing intends to increase capacityby overcoming a bottleneck operation by adding new equipment.Two vendors have presented proposals. The fixed costs for proposalA are $50,000, and for proposal B, $70,000. The va riablecost for A is $12.00, and fo r B, $10.00. The revenue generated byeach unit is $20.00.a) What is the break-even point in units for proposal A?b) What is the break-even point in units for proposal B?a) What is the brea k-even point in dollars for proposal A if youadd $10,000 installation to the fixed cost?b) What is the break-even point in dollars for proposal B if youadd S l 0,000 installation to the fixed cost?arrow_forwardWhy is it so crucial to match process strengths to product requirements?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY