Engineering Economy (17th Edition)
17th Edition
ISBN: 9780134870069
Author: William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 6, Problem 24P
To determine
Calculate the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
8.24 The Ecology Group wishes to purchase a piece of equipment for various metals recycling. Machine 1 costs $123,000, has a life of 10 years, an AOC of $5000, and requires one operator at a cost of $24 per hour to process 10 tons per hour. Machine 2 costs $70,000, has a life of 6 years, an AOC of $2500, and requires two operators at a cost of $24 per hour for each operator to process 6 tons per hour.
a. Determine the breakeven tonnage of scrap metal at i = 7% per year and select the better machine for a processing level of 1000 tons per year.
A company planning to manufacture Webcams has to decide on the location of the production facility. Three location are being considered A, B and C. the fixed costs at the three locations are estimated to be $40000, $65000, and $32000 per year respectively. The variable costs are $4, $2.5 and $4.5 per unit, selling price in three location is $110, $180 and $90 respectively. Maximum capacity is 12000 unit/year in A, 19500 unit/year in B and 9600 unit/year in C. Find the following below:
1- Break- Even quantity in three location2- Profit or loss in location A when quantity is 400 and 300 3- Profit or loss in location B when quantity is 350 and 450 4- Profit or loss in location C when quantity is 425 and 325 5- Maximum revenues in A, B and C6- Range of profit at Demand in A, B and C
Sketch the Break – Even chart each three location
Qwicks Solutions is a consulting firm that offers engineering services at the price of $1,000 per hour.
The cost of the management personnel, workspace, and equipment needed to provide such services
totals $1,000,000 per year. The engineers performing the services are paid $475 per hour. What is the
breakeven number of service hours for this company?
Chapter 6 Solutions
Engineering Economy (17th Edition)
Ch. 6 - An oil refinery finds that it is necessary to...Ch. 6 - The Consolidated Oil Company must install...Ch. 6 - One of the mutually exclusive alternatives below...Ch. 6 - Three mutually exclusive design alternatives are...Ch. 6 - Prob. 5PCh. 6 - Prob. 6PCh. 6 - Fiesta Foundry is considering a new furnace that...Ch. 6 - Prob. 8PCh. 6 - DuPont claims that its synthetic composites will...Ch. 6 - Prob. 10P
Ch. 6 - Which alternative in the table below should be...Ch. 6 - Prob. 12PCh. 6 - The alternatives for an engineering project to...Ch. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Refer to the situation in Problem 6-16. Most...Ch. 6 - An old, heavily used warehouse currently has an...Ch. 6 - Prob. 19PCh. 6 - Two electric motors (A and B) are being considered...Ch. 6 - Two mutually exclusive design alternatives are...Ch. 6 - Pamela recently moved to Celebration, Florida, an...Ch. 6 - Environmentally conscious companies are looking...Ch. 6 - Prob. 24PCh. 6 - Two 100 horsepower motors are being considered for...Ch. 6 - In the Rawhide Company (a leather products...Ch. 6 - Refer to Problem 6-2. Solve this problem using the...Ch. 6 - Prob. 28PCh. 6 - Prob. 29PCh. 6 - Two electric motors are being considered to drive...Ch. 6 - Prob. 31PCh. 6 - Prob. 32PCh. 6 - Prob. 33PCh. 6 - Potable water is in short supply in many...Ch. 6 - Three mutually exclusive investment alternatives...Ch. 6 - Prob. 36PCh. 6 - A companys MARR is 10% per year. Two mutually...Ch. 6 - Prob. 38PCh. 6 - a. Compare the probable part cost from Machine A...Ch. 6 - A one-mile section of a roadway in Florida has...Ch. 6 - Two mutually exclusive alternatives are being...Ch. 6 - Prob. 42PCh. 6 - IBM is considering an environmentally conscious...Ch. 6 - Three mutually exclusive earth-moving pieces of...Ch. 6 - A piece of production equipment is to be replaced...Ch. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Use the imputed market value technique to...Ch. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Three models of baseball bats will be manufactured...Ch. 6 - Refer to Example 6-3. Re-evaluate the recommended...Ch. 6 - Prob. 69SECh. 6 - Prob. 70SECh. 6 - Prob. 71SECh. 6 - Prob. 72CSCh. 6 - Prob. 73CSCh. 6 - Prob. 74CSCh. 6 - Prob. 75FECh. 6 - Prob. 76FECh. 6 - Prob. 77FECh. 6 - Complete the following analysis of cost...Ch. 6 - Prob. 79FECh. 6 - For the following table, assume a MARR of 10% per...Ch. 6 - Prob. 81FECh. 6 - Problems 6-82 through 6-85. (6.4) Table P6-82 Data...Ch. 6 - Prob. 83FECh. 6 - Problems 6-82 through 6-85. (6.4) Table P6-82 Data...Ch. 6 - Problems 6-82 through 6-85. (6.4) Table P6-82 Data...Ch. 6 - Consider the mutually exclusive alternatives given...Ch. 6 - Prob. 87FE
Knowledge Booster
Similar questions
- Break-Even Point Hilton Enterprises selis a product for $119 per unit. The variable cost is $68 per unit, while faed costs are $436,968. Determine (a) the break-even point in sales units and (b) the break-even point if the selling price were increased to $124 per unit a. Break-even point in sales units units b. Break-even point if the selling price were increased to 124 per unit units 00arrow_forwardENGINEERING ECONOMY RATE WILL BE GIVEN. WRITE THE COMPLETE SOLUTIONS/EXPLANATION LEGIBLY OR TYPEWRITTEN. GIVE STRAIGHT TO THE POINT EXPLANATION. Two alternative designs are under consideration for a tapered fastening pin. The fastening pins are sold for $0.70 each. Either design will serve equally well and will involve the same material and manufacturing cost except for the lathe and drill operations. Design A will require 12 hours of lathe time and 5 hours of drill time per 1,000 units. Design B will require 7 hours of lathe time and 8 hours of drill time per 1,000 units. The variable operating cost of the lathe, including labor, is $18.60 per hour. The variable operating cost of the drill, including labor, is $16.90 per hour. Finally, there is a sunk cost of $5,000 for Design A and $9,000 for Design B due to obsolete tooling. a. Which design should be adopted if 125,000 units are sold each year?b. What is the annual saving over the other design?arrow_forward0:28:44 The costs and revenue projections for a new product are estimated. What is the estimated profit at a production rate of 20% above breakeven? Fixed cost = $398,000 per year Production cost per unit = $161 Revenue per unit = $284 The estimated profit is determined to be $ per year.arrow_forward
- Evaluate a combined cycle power plant on the basis of the PW method when the MARR is 18% per year. Pertinent cost data are as follows: Investment cost Useful life Market value (EOY 15) Annual operating expenses Annual expenses Overhaul cost-end of 5th year Overhaul cost-end of 10th year Power Plant (thousands of Php) Php 1,100,000 15 years Php 500,000 Php 50,000 Php 290,000 Php 12,500 Php 25,000arrow_forwardConsider the following assumptions, field size 640 acres, non-cropped area 5 acres, 2600' total length center pivot cost of 30,000 with a life expectancy of 15 years, corn selling price of $3.75 per bushel, expected grain yield of 160 bushels per acre. If SDI irrigation costs $675 per acre installed with a life expectancy of 25 years, expected yield of 160 bushels per acre, you would be money ahead to install SDI. True Falsearrow_forwardRequired information A process for producing the mosquito repellant Deet has an initial investment of $240,000 with annual costs of $60,000. Income is expected to be $90,000 per year. What is the annual breakeven production quantity for both payback periods if net profit, that is, income minus cost, is $10 per gallon? When i = 0%, the annual breakeven production quantity is determined to be[ When i=12%, the annual breakeven production quantity is determined to be gallons per year. gallons per year.arrow_forward
- A firm is considering whether to purchase or lease land-moving equipment. The data associated with the purchase are as follows Initial cost = $150,000 Residual value = $12,000 Maintenance cost = $1,800/per year Operator cost per day = $300/day If the equipment is rented, the operator cost is incurred, at the rate of $300 per day and $100 for the daily rental of the equipment. Determine the minimum number of days per year the equipment must be used to justify the purchase. Use an interest rate of 7%. Life = 10 yearsarrow_forwardThe costs and revenue projections for a new product are estimated. What is the estimated profit at a production rate of 20% above breakeven? Fixed cost = $500,000 per year Production cost per unit = $200 Revenue per unit = $250arrow_forwardHeinrich is a manufacturing engineer with the Miller Company. He has determined the costs of producing a new product to be as follows: Equipment cost: $288,000/year Equipment salvage value at EOY5 = $41,000 Variable cost per unit of production: $14.55 Overhead cost per year: $48,300 If the Miller Company uses a 5-year planning horizon and the product can be sold for a unit price of $39.75, how many units must be produced and sold each year to break even?arrow_forward
- A manufacturing company needs to know whether to produce components for a Bird Feeder in-house or buy the components from a fabricator. To make the components in-house, the company needs to buy an injection molding machine, which costs $9,000. The company expects to produce 10,000 units per year. The following estimates have been made: Fixed cost per year Variable cost per part Make $9,000 $6.45 Buy. $0 $7.20 a. What is the break-even point? b. If the number of units produced is 10,000, which option is cheaper: Make or Buy? Explain why. b. If the number of units produced is increased to 12,500, which option is cheaper: Make or Buy? Explain why.arrow_forwardAn Engineering consultant firm measures its output in a standard hour unit, which is a function of the personnel grade levels in the professional stuff. The variable cost is $62 per standard service hour. The charge-out rate (i.e., selling price) is $85.56 per hour. The maximum output of the firm is 160,000 hours per year, and its fixed cost is $2,024,000 per year. For this firm: (a) What is the breakeven point in standard service hours and in percentage of total capacity? (b) What is the percentage reduction in breakeven (sensitivity) if fixed costs are reduced 10%; if variable cost per hour is reduced 10%; and if the selling price per unit is increased by 10%. Note:- Do not provide handwritten solution. Maintain accuracy and quality in your answer. Take care of plagiarism. Answer completely. You will get up vote for sure.arrow_forwardExtended Learning Exercise A company is producing a high-volume item that sells for $0.75 per unit. The variable production cost is $0.30 per unit. The company is able to produce and sell 10,000,000 items per year when operating at full capacity. The critical attribute for this product is weight. The target value for weight is 1,000 grams, and the specification limits are set at ±50 grams. The filling machine used to dispense the product is capable of weights following a normal distribution with an average (µ) of 1,000 grams and a standard deviation (σ) of 40 grams. Because of the large standard deviation (with respect to the specification limits), 21.12% of all units produced are not within the specification limits. (They either weigh less than 950 grams or more than 1,050 grams.) This means that 2,112,000 out of 10,000,000 units produced are nonconforming and cannot be sold without being reworked. Assume that nonconforming units can be reworked to specification at an…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education