Summary Introduction
Interpretation: A service component or a process of manufacturing that is identifiable needs to be determined and the current state value stream map portraying the information and material flows of the subject picked needs to be sketched.
Concept Introduction: Value stream mapping is one of the lean techniques related to manufacturing processes. Under this technique, we conduct analysis, make the design and manage the information and materials flow that are required for the making of a product, as required by our customer.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
What does an inverted triangle represent in a value stream map?
Use of value stream mapping requires construction of a current state drawing, a future state drawing, and an implementation plan.
In value stream mapping, what does an arrow in the shape of a lightning bolt mean?
Chapter 6 Solutions
OPERATIONS MANAGEMENT LL PACKAGE
Knowledge Booster
Similar questions
- Value Stream Mapping could show an example of this, first explaining the situation. and then show the map itself (the diagram). This in order to understandarrow_forwardWhat does stream value mapping need to be improved?arrow_forwardWhat does the process of Value Stream Mapping (VSM) serve? How is it to be done?arrow_forward
- VSM, Value Stream Mapping what is value stream mapping?and show an example of a situation (applied example) - show in pictures Note:Please do not take from the internetarrow_forwardIn each of the following, name the term defined or answer the question. Answers are listed at the bottom. This means producing only what is needed when needed and no more. A period of time during which the production schedule cannot be changed. Producing a mix of products that matches demand as closely as possible. A production control system that uses a signaling device to regulate the flow of material. If the lead time for an item is exactly five days, the demand is a constant four units per day, and the shipment container contains two units, how many kanban card sets would be needed? (Assume 0 percent safety stock.) A firm wants to justify smaller lot sizes economically. Management knows that it cannot change the cost to carry one unit in inventory because this is largely based on the value of the item. To justify asmaller lot size, what must it do?arrow_forwardDETERMINING THE NUMBER OF KANBAN CONTAINERS Hobbs Bakery produces short runs of cakes that are shipped to grocery stores. The owner, Ken Hobbs,wants to try to reduce inventory by changing to a kanban system. He has developed the following dataand asked you to finish the project.Production lead time = Wait time + Material handling time + Processing time = 2 daysDaily demand = 500 cakesSafety stock = 12 dayContainer size (determined on a production order size EOQ basis) = 250 cakesarrow_forward
- Background: The Toyota Production System (TPS) was developed by the Toyota Motor Corporation in the 1950s as a way to improve productivity and efficiency in their manufacturing processes. The system is based on two main principles: Just-in-Time (JIT) production and Jidoka. JIT production involves producing only what is needed, when it is needed, and in the amount needed. Jidoka is a system of detecting and correcting problems in the manufacturing process as they occur. In the 1970s, Toyota's TPS began to attract attention from other companies who were interested in improving their own manufacturing processes. One of the first companies to adopt the TPS was Vicunha, a Brazilian textile manufacturer. Initiatives and Process Improvement Methods: Vicunha had been struggling with high inventory levels, long lead times, and poor quality. The company's management decided to adopt the TPS and worked closely with Toyota to implement the system. The implementation involved the following…arrow_forwardWhat term refers to the optimization of value-adding activities and elimination of nonvalue-adding activities that are part of a value stream?arrow_forwardNeed to know how many components need to be ordered to have enough to produce a sufficient number of circuit board products to meet the customer order.arrow_forward
- The following information describes a manufacturing system: Daily demand is 1,025 units. Replenishment lead time is 1.5 days. A 2.5 day safety stock is desired. Products are stored in containers that hold 940 units. How many kanban containers are needed for this system?arrow_forwardDiscuss how the transition from a traditional operational environment to a lean system will be accomplished for the following purposes: A company that provides services?arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.