Judy’s Cake Shop makes fresh cakes to customer orders. After receiving the order by Judy’s assistant, which takes 2 minutes, Judy then takes 8 minutes to mix the ingredients for the cake and loads a cake pan for baking. Then the cake is put into the oven for 30 minutes. The oven can hold three cakes at one time. When the cake is taken out of the oven, it is cooled for 1 hour. The assistant then takes 2 minutes to pack the cake for pickup and bills the customer, which takes 3 minutes.
- a. What is the capacity of the process, and what is the bottleneck?
- b. What is the throughput time for a typical cake?
- c. If on average five orders are taken per hour, how many cakes are there in the process (on average)?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwindshoe, which sells for $210, contains both gas- and liquid-filled compartments to provide morestability and better protection against knee, foot, and back injuries. Manufacturing the shoesrequires 10 separate tasks. There are 400 minutes available for manufacturing the shoes inthe plant each day. Daily demand is 60. The information for the tasks is as follows:
Task
Performance Time
(In minutes)
Task Must Follow
This task
A
1
___
B
3
A
C
2
B
D
4
B
E
1
C.D
F
3
A
G
2
F
H
5
G
I
1
E,H
J
3/25
I
1. What is the theoretical minimum number of work stations required to satisfy this output rate?
2. Allocate the tasks to work stations taking into consideration the precedence requirements and usingthe LOT rule to break ties between feasible tasks.
SpikLock makes several lines of metal items. The most recent order has been for 1200 door lock units for an apartment complex developer. The sales and production departments must work together to determine delivery schedules. Each lock unit consists of three components: the knob and faceplate, the actual lock itself, and a set of two keys.
Although the processes used in the manufacture of the three components vary, there are three areas where the production manager is concerned about the availability of resources. These three areas, their usage by the three components, and their availability are detailed in the table.
Resource
Knob and Plate
Lock
Key (each)
Available
Brass Alloy
12
5
1
15000 units
Machining
18
20
10
36000 minutes
Finishing
15
5
1
12000 minutes
A quick look at the amounts available confirms that SpikLock does not have the resources to fill this contract. A subcontractor, who can make an unlimited number of each…
Formtech Inc. produces transformers. Each order is custom designed and manufactured for the customer. Each order goes through 3 phases:
Transformer Design, which takes 4 weeks.
Procurement, which has a lead time of 8 weeks.
Assembly and Testing, which takes 4 weeks
The design group can handle only 4 projects at any given time. The other groups are not capacity constrained.
How much total work-in-process (number of projects started but not yet completed) does the company typically have? (Hint: Little's Law)
Chapter 6 Solutions
OPER MGMT IN SUPPLY CHAIN ACCESS CARD
Ch. 6 - In the following operations, isolate a system for...Ch. 6 - Explain how the process view of an organization is...Ch. 6 - Explain Littles Law in your own words. How can it...Ch. 6 - Provide a definition of a bottleneck. Why is it...Ch. 6 - Explain the differences between capacity, flow...Ch. 6 - What kinds of problems are presented by the...Ch. 6 - Why is it important to define the system of...Ch. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - In a company that processes insurance claims, the...
Ch. 6 - Suppose a bank clears checks drawn on customers...Ch. 6 - The Stylish Hair Salon has three stylists who...Ch. 6 - Judys Cake Shop makes fresh cakes to customer...Ch. 6 - The Swanky Hotel provides room service for its...Ch. 6 - A furniture factory makes two types of wooden...Ch. 6 - Draw a flowchart of the following processes: a....Ch. 6 - Draw a flowchart of the following processes: a....Ch. 6 - Use the key questions of what, who, where, when,...Ch. 6 - Prob. 10PCh. 6 - Use the what, who, where, when, and how questions...Ch. 6 - Draw a service blueprint for the following: a....Ch. 6 - Draw a service blueprint for the following: a....
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- . Aquatica makes underwater camera housings for divers. The process begins with a solid rectangular block of aluminum that is used to make a single housing. A computer numerically controlled (CNC) machine drills into the block to make the metal “frame” of the housing. Each block requires 15 minutes of drilling. The frame is then chemically treated in a series of baths. There is ample capacity in the treating stage. Finally, a worker must manually attach the various buttons and components to the metal housing. This assembly takes 120 minutes per housing per worker and Aquatica has 6 workers trained to do this task. The CNC machine requires a 30-minute setup time before the production of a batch can begin. a. If the CNC machine produces 14 housings between setups, what would be its capacity (in housings per hour)? b. Assuming the process is supply-constrained, what is the utilization (as a number between 0 and 1) of the CNC machine if it operates in batches of 14 housings? c. Assuming…arrow_forwardJudy’s Cake Shop makes fresh cakes to customer orders. After receiving the order by Judy’s assistant, which takes 2 minutes, Judy then takes 8 minutes tomix the ingredients for the cake and loads a cake pan for baking. Then the cake is put into the oven for 30 minutes. The oven can hold three cakes at one time. When the cake is taken out of the oven, it is cooled for 1 hour. The assistant then takes 2 minutes to pack the cake for pickup and bills the customer, which takes 3 minutes.a. What is the capacity of the process, and what is the bottleneck?b. What is the throughput time for a typical cake?c. If on average five orders are taken per hour, how many cakes are there in the process (on average)?arrow_forwardA furniture factory makes two types of wooden tables,large and small. See the flowchart below.SetupTime,MinutesRun Timeper Piece,MinutesCapacity,Piecesper HourWood cutting 30 5 15Make four legs 60 10 10Make tops 60 12 8Finish the wood 20 8 12Assemble and ship 20 17 14 Small tables are made in batches of 100, and large tables are made in batches of 50. A batch includes a fixed setup time for the entire batch at each process step and a run time for each piece in the batch. Both large and small tables have the same processing times. The capacities of each process step are given, and apply to production of either type of table, as shown in the flowchart.a. What is the capacity of the system, and what is the bottleneck?b. What are the throughput times for batches of large and small tables?c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?arrow_forward
- Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400minutes available for manufacturing the shoes in the plant each day. Daily demand is 62.The information for the tasks is as follows: Task Performance Time (mins) Predecessors A 1 − B 3 A C 1 B D 4 B E 1 C, D F 3 A G 2 F H 5 G I 3 E, H J 2 I a-b) The correct precedence relationship with one of the possible assignments of tasks using the "ranked positionedweight" to workstations is shown in Fig 1, 2 or 3 c) The efficiency of the assembly line with 5 workstations shown in the figure…arrow_forwardTailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwind shoe, which sells for $210, contains both gas- and liquid-filled compartments to provide more stability and better protection against knee, foot, and back injuries. Manufacturing the shoes requires 10 separate tasks. There are 400 minutes available for manufacturing the shoes in the plant each day. Daily demand is 64. The information for the tasks is as follows: Task Performance Time (mins) Predecessors A 1 − B 3 A C 1 B D 4 B E 1 C, D F 3 A G 2 F H 5 G I 1 E, H J 3 I a) The efficiency of the assembly line with 5 workstations shown in the figure chosen above=(enter your response as a percentage rounded to one decimal place). b) The idle time for the assembly line per cycle =minute(s) (enter your…arrow_forwardThe Assembly Department started the month with 37,000 units in its beginning work in process inventory. An additional units 482,000 were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 34,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing department during the month? A. none of the options B. 485,000 C. 473,000 D. 479,000arrow_forward
- A manufacturer's average WIP inventory for Part #762 is 882 parts. The workstation produces parts at the rate of 275 parts per day. Use the Excel template Little's Law to find the average time a part spends in this workstation. - Slugger, Inc. assembles Baseball Bats with aluminum handles in an assembly line using four workstations. Management wants an output rate of 550 bats per day using a 11.5-hour workday. What is the cycle time?arrow_forwardJason Carter works for a producer of soaps that come inpackages of 6 each. His job is to fi ll the packages with soap, andhe is expected to process 30 packages an hour. Th e facility whereJason works uses a kanban production system in which eachcontainer holds 5 packages of soap. It takes 20 minutes to receivethe packages he needs from the previous workstation. How manykanbans are needed for the fi lling process?arrow_forwardA lathe is used to process an automobile part. The processing time per part is 4 minutes. After producing 140 units of the part, the lathe requires a 46 minute maintenance process. Demand for the part is 11 units per hour. What is the maximum inventory of a part (in units)?arrow_forward
- 3. At Golf Co. product is automated to load golf balls into packaging. On an average day, the equipmentcan load 25 cases per hour, where each case contains 20 boxes and each box contains 12 balls.After maintenance, the machine is loading a little faster so that it takes 0.2 seconds less time to load onegolf ball into a box compared with the normal speed.How many cases per hour can the machine load at this new rate?arrow_forwardXYZ company provides labor and space for the manufacturing and assembly operations and stocking various inventory items for production such as wire, cables, some electronic components, etc. XYZ company orders a variety of components and raw materials by contract. The company recently hired 100 part-time employees working four to six-hour shifts. Skilled employees must do several raw material conversions for packaging—there are currently three (3) such employees. The plant layout is a typical process layout - machines of similar types are located together. Each machine and employee must be scheduled over the day and the standard time period for planning is one (1) hour. Material handling is mainly done manually, although the company would like to consider conveyors or other automation to aid in automating their processes. XYZ company forecasts planned production for two (2) years on a rolling quarterly basis. Often, the customer changes the forecast, and these changes can occur as…arrow_forwardIn the first week in the game, you received the order from stallion apparel at the beginning of the game for 800 socks and you cut 800 flow units of cotton in 1280 minutes. During the time of 1280 minutes, your work-in-process inventory within the cutting resources was 400.50. What is the flow time?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY