Chapter 6, Problem 4P

Judy’s Cake Shop makes fresh cakes to customer orders. After receiving the order by Judy’s assistant, which takes 2 minutes, Judy then takes 8 minutes to mix the ingredients for the cake and loads a cake pan for baking. Then the cake is put into the oven for 30 minutes. The oven can hold three cakes at one time. When the cake is taken out of the oven, it is cooled for 1 hour. The assistant then takes 2 minutes to pack the cake for pickup and bills the customer, which takes 3 minutes.

  1. a. What is the capacity of the process, and what is the bottleneck?
  2. b. What is the throughput time for a typical cake?
  3. c. If on average five orders are taken per hour, how many cakes are there in the process (on average)?
Blurred answer
Students have asked these similar questions
Tailwind, Inc., produces high-quality but expensive training shoes for runners. The Tailwindshoe, which sells for $210, contains both gas- and liquid-filled compartments to provide morestability and better protection against knee, foot, and back injuries. Manufacturing the shoesrequires 10 separate tasks. There are 400 minutes available for manufacturing the shoes inthe plant each day. Daily demand is 60. The information for the tasks is as follows: Task Performance Time        (In minutes) Task Must Follow         This task A 1 ___   B 3 A C 2 B D 4 B E 1 C.D F 3 A G 2 F H 5 G I 1 E,H J 3/25 I 1. What is the theoretical minimum number of work stations required to satisfy this output rate? 2. Allocate the tasks to work stations taking into consideration the precedence requirements and usingthe LOT rule to break ties between feasible tasks.
SpikLock makes several lines of metal items. The most recent order has been for 1200 door lock units for an apartment complex developer. The sales and production departments must work together to determine delivery schedules. Each lock unit consists of three components: the knob and faceplate, the actual lock itself, and a set of two keys. Although the processes used in the manufacture of the three components vary, there are three areas where the production manager is concerned about the availability of resources. These three areas, their usage by the three components, and their availability are detailed in the table. Resource Knob and Plate Lock Key (each) Available Brass Alloy 12   5   1 15000 units Machining 18 20 10 36000 minutes Finishing 15   5   1 12000 minutes A quick look at the amounts available confirms that SpikLock does not have the resources to fill this contract. A subcontractor, who can make an unlimited number of each…
Formtech Inc. produces transformers. Each order is custom designed and manufactured for the customer. Each order goes through 3 phases: Transformer Design, which takes 4 weeks. Procurement, which has a lead time of 8 weeks. Assembly and Testing, which takes 4 weeks The design group can handle only 4 projects at any given time. The other groups are not capacity constrained. How much total work-in-process (number of projects started but not yet completed) does the company typically have? (Hint: Little's Law)
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY