Four standard mortar cubes were made using nonpotable water available at the job site, and four others were made using potable water. The cubes were tested for compressive strength after 7 days of curing and produced the failure loads in kilograms shown in Table P6.24. Also, the Vicat test was conducted on the cement paste made with the questionable water and showed that the set time is 1_2 hour less than the set time of paste made with potable water. Based on these results, would you accept that water for mixing concrete according to ASTM standards? Explain why.

TABLE P6.24

Nonpotable Water Potable Water
6909 7773
6591 7400
6302 7599
7227 7364
Blurred answer
Students have asked these similar questions
Three standard mortar cubes were made using nonpotable water available at the job site, and three others were made using potable water. The cubes were tested for compressive strength after 7 days of curing and produced the failure loads in kN shown in Table P6.22. The Vicat test was conducted on the cement paste made with the questionable water and showed that the set time was 45 minutes more than the set time of paste made with potable water. Based on these results, would you accept that water for mixing concrete according to ASTM standards? Explain why.
Three standard mortar cubes were made using nonpotable water available atthe job site, and three others were made using potable water. The cubes weretested for compressive strength after 7 days of curing and produced the failureloads in kips shown in Table P6.23.The Vicat test was conducted on the cement paste made with the questionablewater and showed that the set time was 45 minutes more than the set time ofpaste made with potable water. Based on these results, would you accept thatwater for mixing concrete according to ASTM standards? Explain why.
Four standard mortar cubes were made using nonpotable water available atthe job site, and four others were made using potable water. The cubes weretested for compressive strength after 7 days of curing and produced the failureloads in kilograms shown in Table P6.24.Also, the Vicat test was conducted on the cement paste made with the ques-tionable water and showed that the set time is 0.5hour less than the set timeof paste made with potable water. Based on these results, would you acceptthat water for mixing concrete according to ASTM standards? Explain why.

Chapter 6 Solutions

Materials For Civil And Construction Engineers In Si Units

Ch. 6 - What is a false set of portland cement? State one...Ch. 6 - The watercement ratio is important because it...Ch. 6 - Discuss the effect of watercement ratio on the...Ch. 6 - Draw a graph to show the general relationship...Ch. 6 - Students in the materials class prepared three...Ch. 6 - Students in the materials class prepared three...Ch. 6 - Two batches of cement mortar with properties as...Ch. 6 - What are the five primary types and functions of...Ch. 6 - Why isnt pozzolan used with Type III cement?Ch. 6 - What type of cement would you use in each of the...Ch. 6 - In order to evaluate the suitability of nonpotable...Ch. 6 - Three standard mortar cubes were made using...Ch. 6 - Four standard mortar cubes were made using...Ch. 6 - Discuss the problem of disposal of waste water...Ch. 6 - State five types of admixtures and discuss their...Ch. 6 - Prob. 6.27QPCh. 6 - Under what condition is an air-entraining agent...Ch. 6 - If a water reducer is added to the concrete mix...Ch. 6 - Prob. 6.30QPCh. 6 - A concrete mix includes the following ingredients...Ch. 6 - The results of an experiment to evaluate the...Ch. 6 - The results of a laboratory experiment to evaluate...Ch. 6 - Referring to Table P6.34, Mix No. 1 was designed...Ch. 6 - Two batches of concrete cylinders were made with...Ch. 6 - Two batches of concrete cylinders were made with...Ch. 6 - What is the source of fly ash? Why is fly ash...Ch. 6 - A materials engineer is working in a research...Ch. 6 - A materials engineer is working in a research...
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Structural Analysis
Civil Engineering
ISBN:9781337630931
Author:KASSIMALI, Aslam.
Publisher:Cengage,
Text book image
Structural Analysis (10th Edition)
Civil Engineering
ISBN:9780134610672
Author:Russell C. Hibbeler
Publisher:PEARSON
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Text book image
Fundamentals of Structural Analysis
Civil Engineering
ISBN:9780073398006
Author:Kenneth M. Leet Emeritus, Chia-Ming Uang, Joel Lanning
Publisher:McGraw-Hill Education
Text book image
Sustainable Energy
Civil Engineering
ISBN:9781337551663
Author:DUNLAP, Richard A.
Publisher:Cengage,
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning
Concrete Slab Calculations 006; Author: Jerry Howard;https://www.youtube.com/watch?v=R19jILyBxio;License: Standard Youtube License