Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
12th Edition
ISBN: 9780134741062
Author: Lee J. Krajewski, Manoj K. Malhotra, Larry P. Ritzman
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 6, Problem 6P
a.
Summary Introduction
Interpretation:The number of containers required for holding gadjits needs to be determined.
Concept Introduction:Just in time is an inventory management system used to maintain the inventory levels by reducing the holding cost or any other costs associated with it.
b.
Summary Introduction
Interpretation: The number of containers required for holding widjits needs to be determined.
Concept Introduction: Just in time is an inventory management system used to maintain the inventory levels through reducing the holding cost or any other costs associated with it.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
An assembly line requires two components: gadjits and wi-djits. Gadjits are produced by center 1 and widjits by center 2.Each unit of the end item, called a jit-together, requires three gadjits and two widjits, as shown in Figure 6.13. The dailyproduction quota on the assembly line is 800 jit-togethers. The container for gadjits holds 80 units. The policy variablefor center 1 is set at 0.09. The average waiting time for a con-tainer of gadjits is 0.09 day, and 0.06 day is needed to producea container. The container for widjits holds 50 units, and thepolicy variable for center 2 is 0.08. The average waiting timeper container of widjits is 0.14 day, and the time required toprocess a container is 0.20 day.a. How many containers are needed for gadjits?b. How many containers are needed for widjits?
If mixed model scheduling is used, how many of each model will be produced before the cycle is repeated, if the master production schedule calls for 55 units of product A, 40 units of product B, and 20 units of product C per seven-hour shift?
Group of answer choices
5 of A, 5 of B, 5 of C
11 of A, 8 of B, 4 of C
22 of A, 16 of B, 8 of C
55 of A, 50 of B, 20 of C
Please do fast ASAP
In a sandwich production factory, making each ham and cheese sandwich consists of a number of activities which totally take 7 minutes. The production line for ham and cheese sandwich has five workers who work 12 hours a day. What is the maximum number of ham and cheese sandwiches they canmake in this production line?a) 465 b) 425c) 612 d) 514e) 102
Chapter 6 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Knowledge Booster
Similar questions
- The Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 185 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are, in total, six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 80 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 205 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if the need arises, it can add a second shift of eight hours for the assembly lines. The cost of assembly labor is 30 cents per part for…arrow_forwardFlores Manufacturing, Inc., is moving to kanbans tosupport its electronic-boa rd assembly lines. Detennine the size of thekanban for subassemblies and the number of kanbans needed. F)cSetup cost = $25Annual holding cost = $200 per subassemblyDaily production = 400 subassembliesAnnual usage = 50,000 (=50 weeks X 5 days eachX daily usage of200 subassemblies)Lead time = 6 daysSafety stock = I day's production of subassembliesarrow_forwardJason Carter works for a producer of soaps that come inpackages of 6 each. His job is to fi ll the packages with soap, andhe is expected to process 30 packages an hour. Th e facility whereJason works uses a kanban production system in which eachcontainer holds 5 packages of soap. It takes 20 minutes to receivethe packages he needs from the previous workstation. How manykanbans are needed for the fi lling process?arrow_forward
- The Harvey Motorcycle Company produces three models:the Tiger, a sure-footed dirt bike; the LX2000, a nimble caféracer; and the Golden, a large interstate tourer. This month’smaster production schedule calls for the production of 54Goldens, 42 LX2000s, and 30 Tigers per 7-hour shift.a. What average cycle time is required for the assembly lineto achieve the production quota in 7 hours?b. If mixed-model scheduling is used, how many of eachmodel will be produced before the production cycle isrepeated?c. Determine a satisfactory production sequence for the ulti-mate in small-lot production: one unit.arrow_forwardThe Harvey Motorcycle Company produces three models:the Tiger, a sure-footed dirt bike; the LX2000, a nimble café racer; and the Golden, a large interstate tourer. This month’s master production schedule calls for the production of 54 Goldens, 42 LX2000s, and 30 Tigers per 7-hour shift.a. What average cycle time is required for the assembly line to achieve the production quota in 7 hours?b. If mixed-model scheduling is used, how many of each model will be produced before the production cycle is repeated?c. Determine a satisfactory production sequence for the ultimate in small-lot production: one unit.d. The design of a new model, the Cheetah, includes features from the Tiger, LX2000, and Golden models. The resulting blended design has an indecisive character and is expected to attract some sales from the other models. Determine a mixed-model schedule resulting in 52 Goldens,39 LX2000s, 26 Tigers, and 13 Cheetahs per 7-hour shift. Although the total number of motorcycles produced per…arrow_forwardA company produces two products: A and B. Prod-uct A sells for $11 per unit and product B sells for $23 per unit. Producing a unit of product A requires two hours on assembly line 1 and one unit of raw ma-terial. Producing a unit of product B requires two units of raw material, one unit of A, and two hours on as-sembly line 2. On line 1, 1300 hours of time are avail-able, and 500 hours are available on line 2. A unit of raw material can be bought (for $5 a unit) or produced(at no cost) by using two hours of time on line 1.a. Determine how to maximize profit.b. The company will stop buying raw material whenthe price of raw material exceeds what value? (UseSolverTable.)arrow_forward
- Tuff-Rider, Inc., manufactures touring bikes and mountainbikes in a variety of frame sizes, colors, and component com-binations. Identical bicycles are produced in lots of 100. Theprojected demand, lot size, and time standards are shown inthe following table: The shop currently works 8 hours a day, 5 days a week,50 weeks a year. It operates five workstations, each producingone bicycle in the time shown in the table. The shop main-tains a 15 percent capacity cushion. How many workstationswill be required next year to meet expected demand withoutusing overtime and without decreasing the firm’s currentcapacity cushion?arrow_forwarda chain saw requires 4 hours of assembly and wood chipper 3 hours.A maximum of 36 hours of assembly time is available.The profit is $150 on a chain saw and 220 on a chipper.How many of each should be assembled for maximum profit?arrow_forwardMontegut Manufacturing produces a product for which the annual demand is 10,000 units. Production averages 100 units per day, while demand is 40 units per day. Holding costs are $2.00 per unit per year, and setup cost is $200.00. (a) If the firm wishes to produce this product in economic batches, what size batch should be used?arrow_forward
- A firm wants to justify smaller lot sizes economically.Management knows that it cannot change the cost tocarry one unit in inventory since this is largely basedon the value of the item. To justify a smaller lot size,what must it do?arrow_forwardWhat term refers to a schedule that pulls material into i nal assembly at a constant rate?arrow_forwardThe Cashew Connection produces bags of cashews. Fixed cost is $22,110. Each bag sells for $10.39 with a variable (unit) cost of $2.35. How many bags of cashews must be sold to break even?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.