Chapter 6.4, Problem 19P
Summary Introduction
To determine: The way to use IF function in the Company D’s production without binary variables.
Introduction: The variation between the present value of the
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
Please do not give solution in image format thanku
In a linear programming problem, the binding constraints for the optimal solution are 5X + 3Y ≤ 30 2X + 5Y ≤ 20 a. Fill in the blanks in the following sentence: As long as the slope of the objective function stays between _______ and _______, the current optimal solution point will remain optimal. b. Which of these objective functions will lead to the same optimal solution? 1) 2X + 1Y 2) 7X + 8Y 3) 80X + 60Y 4) 25X + 35Y
John Hoke owns Hoke's Spokes, a bicycle shop. Most of John's bicycle sales are customer orders; however, he also stocks bicycles for walk-incustomers. He stocks three types of bicyclesroad-racing, cross-country, and mountain. A road-racing bike costs $1,200, a cross-country bike costs$1,700, and a mountain bike costs $900. He sells road-racing bikes for $1,800, cross-country bikes for $2,100, and mountain bikes for $1,200. Hehas $12,000 available this month to purchase bikes. Each bike must be assembled; a road-racing bike requires 8 hours to assemble, a crosscountrybike requires 12 hours, and a mountain bike requires 16 hours. He estimates that he and his employees have 120 hours available toassemble bikes. He has enough space in his store to order 20 bikes this month. Based on past sales, John wants to stock at least twice as manymountain bikes as the other two combined because mountain bikes sell better If John were to hire an additional worker for 30 hours at $10 per hour, how much…
WHAT IS THE NEW TOTAL VALUE?
A garden store prepares various grades of pine bark for mulch: nuggets (x1), mini-nuggets (x2), and chips (x3). The process requires pine bark, machine time, labor time, and storage space. The following model has been developed.
Maximize
9x1 + 9x2+ 6x3 (profit)
Subject to
Bark
5x1
+
6x2
+
3x3
≤
600
pounds
Machine
2x1
+
4x2
+
5x3
≤
600
minutes
Labor
2x1
+
4x2
+
3x3
≤
480
hours
Storage
1x1
+
1x2
+
1x3
≤
150
bags
x1, x2, x3
≥
0
What is the new value of the objective function, if the profit on chips increases from $6 per bag to $7 per bag?
The New Value Is=
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- To graduate from Basketweavers University with a majorin operations research, a student must complete at least twomath courses, at least two OR courses, and at least twocomputer courses. Some courses can be used to fulfill morethan one requirement: Calculus can fulfill the mathrequirement; operations research, math and OR requirements;data structures, computer and math requirements; businessstatistics, math and OR requirements; computer simulation,OR and computer requirements; introduction to computerprogramming, computer requirement; and forecasting, ORand math requirements.Some courses are prerequisites for others: Calculus is aprerequisite for business statistics; introduction to computerprogramming is a prerequisite for computer simulation andfor data structures; and business statistics is a prerequisitefor forecasting. Formulate an IP that minimizes the numberof courses needed to satisfy the major requirements.arrow_forwardPLEASE SHOW IN EXCEL Kelson Sporting Equipment, Inc., makes two different types of baseball gloves: a regular model and a catcher’s model. The firm has 900 hours of production time available in its cutting and sewing department, 300 hours available in its finishing department, and 100 hours available in its packaging and shipping department. The production time requirements and the profit contribution per glove are given in the following table: Production Time (hours) Model Cuttuing and Sewing Finishing and Shipping Profit/Glove Regular model 1 1/2 1/8 $5 Catcher's model 3/2 1/3 1/4 $8 Assume that the company is interested in maximizing the total profit contribution. Let R = number of units of regular model.C = number of units of catcher’s model. Max 5 R + 8 C s.t. 1 R + C ≤ 900 Cutting and sewing R + C ≤ 300 Finishing R + C ≤ 100…arrow_forwardBarrows Textile Mills produces two types of cotton cloth—denim and corduroy. Corduroy is a heavier grade of cottoncloth and, as such, requires 7.5 pounds of raw cotton peryard, whereas denim requires 5 pounds of raw cotton peryard. A yard of corduroy requires 3.2 hours of processingtime; a yard of denim requires 3.0 hours. Although the demand for denim is practically unlimited, the maximumdemand for corduroy is 510 yards per month. The manufacturer has 6500 pounds of cotton and 3000 hours of processing time available each month. The manufacturermakes a profit of $2.25 per yard of denim and $3.10 peryard of corduroy. The manufacturer wants to know howmany yards of each type of cloth to produce to maximizeprofit.PROBLEMS • GO Tutoriala. Formulate and solve a linear programming model forthis problem.b. Solve this model using the graphical method.arrow_forward
- A company produces two products: A and B. Product A sells for $11 per unit and product B sells for $23 per unit. Producing a unit of product A requires two hours on assembly line 1 and one unit of raw material. Producing a unit of product B requires two units of raw material, one unit of A, and two hours on assembly line 2. On line 1, 1300 hours of time are available, and 500 hours are available on line 2. A unit of raw material can be bought (for $5 a unit) or produced (at no cost) by using two hours of time on line 1. a. Determine how to maximize profit. b. The company will stop buying raw material when the price of raw material exceeds what value? (Use SolverTable.)arrow_forwardSolve this problem in three ways; 1. Graphical 2. Excel solver 3. Sensitivity analysis/ report. a) What will happen to the optimal solution if the unit profit on x increase by 300? b) what will happen happen to the optimal solution if the unit profit on y decreases by 230? c) What will happen to the optimal solution if the unit profit on both x and y change to 700? d) Complete the sensitivity report with upper and lower limit. 1. The JAV Company manufactures two types of lamps; Special lamp and regular lamp. Each special lamp requires 4 pounds of brass and each regular lamp requires 8 pounds of brass. During each production period, the company's brass supply limited to 640 pounds. Each special lamp requires 6 hours of milling time in the machines and each regular lamp requires 2 hours of milling time in the machine, The company's machine are available only for 360 hours in each production period. Each special lamp requires 5 light bulbs that must be imported from…arrow_forwardRMC,inc., is a small firm that produces a variety of chemical products. In a particular production process, three raw materials are blended (mixed together) to produce two products; a fuel additive and a solvent base. Each kilo of fuel additive is a mixture of 0.4 kilos of material 1 and 0.6kilos of material 3. A kilo of solvent base is a mixture of 0.5kilos of materials 1, 0.2 kilos of materials 2 and 0.3kilos of material 3. After deducting relevant costs, the profit contribution is £40 for every kilo of fuel additive produced and £30 for every kilo of solvent base produced. RMC`s production is constrained by a limited availability of the three raw materials. For the current production period, RMC has available the following quantities of each raw material:Raw Material Amount Available for productionMaterial 1 20 kilosMaterial 2 5 KilosMaterial 3 21 Kilos Assuming that RMC is interested in maximising the total profit contribution, 1. answer the following:(a) What is…arrow_forward
- Mrs. Reyes needs a diet that will supply her with at least 1,200 calories and at least 700 units of Vitamin C per day. Two types of food meet this requirement. Each unit of Food 1 contains 20 calories and 10 units of Vitamin C and costs P9.00; each unit of Food 2 contains 15 calories and 10 units of Vitamin C, and costs P7.00. By the simplex method, determine the best possible combinations of the two types of food that will minimize cost while meeting the dietary requirements.arrow_forwardWhat are some common properties of LP models? What is the three-step process for solving LP models? How are constraints modeled graphically? What is the corner point property? How is it useful in solving LP models?arrow_forwardJohn Hoke owns Hoke's Spokes, a bicycle shop. Most of John's bicycle sales are customer orders; however, he also stocks bicycles for walk-in customers. He stocks three types of bicyclesroad-racing, cross-country, and mountain. A road-racing bike costs $1,200, a cross-country bike costs $1,700, and a mountain bike costs $900. He sells road-racing bikes for $1,800, cross-country bikes for $2,100, and mountain bikes for $1,200. He has $12,000 available this month to purchase bikes. Each bike must be assembled; a road-racing bike requires 8 hours to assemble, a crosscountry bike requires 12 hours, and a mountain bike requires 16 hours. He estimates that he and his employees have 120 hours available to assemble bikes. He has enough space in his store to order 20 bikes this month. Based on past sales, John wants to stock at least twice as many mountain bikes as the other two combined because mountain bikes sell better. Formulate a linear programming model for this problem.arrow_forward
- In the Great Threads model, we didn’t constrain the production quantities in row 16 to be integers, arguing that any fractional values could be safely rounded to integers. See whether this is true. Constrain these quantities to be integers and then run Solver. Are the optimal integer values the same as the rounded fractional values in Figure 6.12?arrow_forwardGiven this linear programming model, solve the model and then answer the questions that follow.Maximize Z = 12x1 + 18x2 + 15x3 where x1 = the quantity of product 1 to make, etc.Subject toMachine 5x1 + 4x2 + 3x3 ≤ 160 minutes Labor 4x1 + 10x2 + 4x3 ≤ 288 hoursMaterials 2x1 + 2x2 + 4x3 ≤ 200 poundsProduct 2 x2 ≤ 16 units x1, x2, x3 ≥ 0 a. Are any constraints binding? If so, which one(s)?arrow_forwardBangs Leisure Chairs produces three types of hand- crafted outdoor chairs that are popular for beach pool, and patios: sling chairs, Adirondack chairs, and hammocks. The unit profit for these products is $40, $100, and $90, respectively. Each type of chair requires cutting, assembling, and finishing. The owner is retired and is willing to work six hours/ day for five days/week, so has 120 hours available each month. He does not want to spend more than 50 hours each month on any one activity (that is, cutting, assembling, and finishing). The retailer he works with is certain that all products he makes can easily be sold. Sling chairs are made up of ten wood pieces for the frame and one piece of cloth. The actual cutting of the wood takes 30 minutes. Assembling includes sewing of the fabric and the attachment of rivets, screws, fabric, and dowel rods, and takes 45 minutes. The finishing stage involves sanding, staining, and varnishing of the various parts and takes one hour. Adirondack…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,