Chapter 6.4, Problem 22P
Summary Introduction
To modify: The model and find the optimal solution using solver.
Introduction: The variation between the present value of the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In a production process model such as Repco’s, certain inputs make no sense in the usage table (the range B7:D9 of the model). For example, suppose that, in addition to current usages, each unit of drug A -requires one unit of drug C. Why does this result in a nonsensical problem? What happens if you run Solver on it anyway? What happens if you run Solver on it after adding a constraint that the sum of the units produced (over all three drugs) must be at least 1?
Answer the following true or false.a. The lead time is always less than the cycle time.b. The optimal lot size for a Type 1 service objective of X percent is always less than the optimal lot size for a Type 2 service objective of X percent for the same item.c. The newsvendor model does not include a fixed order cost.d. ABC analysis ranks items according to the annual value of their demand.e. For a finite production rate model, the optimal lot size to produce each cycle is equal to the maximum inventory each cycle.
A company produces three types of items. A singlemachine is used to produce the three items on a cyclicalbasis. The company has the policy that every item isproduced once during each cycle, and it wants to determinethe number of production cycles per year that will minimizethe sum of holding and setup costs (no shortages areallowed). The following data are given:Pi number of units of product i that could be producedper year if the machine were entirely devoted toproducing product iDi annual demand for product iKi cost of setting up production for product ihi cost of holding one unit of product i in inventoryfor one yeara Suppose there are N cycles per year. Assuming thatduring each cycle, a fraction N1of all demand for eachproduct is met, determine the annual holding cost andthe annual setup cost.b Let qi* be the number of units of product i producedduring each cycle. Determine the optimal value of N(call it N*) and qi*.
c Let EROQi be the optimal production run size forproduct i if…
Chapter 6 Solutions
Practical Management Science
Ch. 6.3 - Prob. 1PCh. 6.3 - Prob. 2PCh. 6.3 - Solve Problem 1 with the extra assumption that the...Ch. 6.3 - Prob. 4PCh. 6.3 - Prob. 5PCh. 6.3 - Prob. 6PCh. 6.3 - Prob. 7PCh. 6.3 - Prob. 8PCh. 6.3 - Prob. 9PCh. 6.3 - Prob. 10P
Ch. 6.4 - Prob. 11PCh. 6.4 - Prob. 12PCh. 6.4 - Prob. 13PCh. 6.4 - Prob. 14PCh. 6.4 - Prob. 15PCh. 6.4 - Prob. 16PCh. 6.4 - Prob. 17PCh. 6.4 - Prob. 18PCh. 6.4 - Prob. 19PCh. 6.4 - Prob. 20PCh. 6.4 - Prob. 21PCh. 6.4 - Prob. 22PCh. 6.4 - Prob. 23PCh. 6.5 - Prob. 24PCh. 6.5 - Prob. 25PCh. 6.5 - Prob. 26PCh. 6.5 - Prob. 28PCh. 6.5 - Prob. 29PCh. 6.5 - Prob. 30PCh. 6.5 - In the optimal solution to the Green Grass...Ch. 6.5 - Prob. 32PCh. 6.5 - Prob. 33PCh. 6.5 - Prob. 34PCh. 6.5 - Prob. 35PCh. 6.6 - Prob. 36PCh. 6.6 - Prob. 37PCh. 6.6 - Prob. 38PCh. 6 - Prob. 39PCh. 6 - Prob. 40PCh. 6 - Prob. 41PCh. 6 - Prob. 42PCh. 6 - Prob. 43PCh. 6 - Prob. 44PCh. 6 - Prob. 45PCh. 6 - Prob. 46PCh. 6 - Prob. 47PCh. 6 - Prob. 48PCh. 6 - Prob. 49PCh. 6 - Prob. 50PCh. 6 - Prob. 51PCh. 6 - Prob. 52PCh. 6 - Prob. 53PCh. 6 - Prob. 54PCh. 6 - Prob. 55PCh. 6 - Prob. 56PCh. 6 - Prob. 57PCh. 6 - Prob. 58PCh. 6 - Prob. 59PCh. 6 - Prob. 60PCh. 6 - Prob. 61PCh. 6 - Prob. 62PCh. 6 - Prob. 63PCh. 6 - Prob. 64PCh. 6 - Prob. 65PCh. 6 - Prob. 66PCh. 6 - Prob. 67PCh. 6 - Prob. 68PCh. 6 - Prob. 69PCh. 6 - Prob. 70PCh. 6 - Prob. 71PCh. 6 - Prob. 72PCh. 6 - Prob. 73PCh. 6 - Prob. 74PCh. 6 - Prob. 75PCh. 6 - Prob. 76PCh. 6 - Prob. 77PCh. 6 - Prob. 78PCh. 6 - Prob. 79PCh. 6 - Prob. 80PCh. 6 - Prob. 81PCh. 6 - Prob. 82PCh. 6 - Prob. 83PCh. 6 - Prob. 84PCh. 6 - Prob. 85PCh. 6 - Prob. 86PCh. 6 - Prob. 87PCh. 6 - Prob. 88PCh. 6 - Prob. 89PCh. 6 - Prob. 90PCh. 6 - Prob. 91PCh. 6 - Prob. 92PCh. 6 - This problem is based on Motorolas online method...Ch. 6 - Prob. 94PCh. 6 - Prob. 95PCh. 6 - Prob. 96PCh. 6 - Prob. 97PCh. 6 - Prob. 98PCh. 6 - Prob. 99PCh. 6 - Prob. 100PCh. 6 - Prob. 1CCh. 6 - Prob. 2CCh. 6 - Prob. 3.1CCh. 6 - Prob. 3.2CCh. 6 - Prob. 3.3CCh. 6 - Prob. 3.4CCh. 6 - Prob. 3.5CCh. 6 - Prob. 3.6C
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- In Solver’s sensitivity report for the product mix model, the allowable decrease for available assembling hours is 2375. This means that something happens when assembling hours fall to 20,000 - 2375 = 17,625. See what this means by first running Solver with 17,626 available hours and then again with 17,624 available hours. Explain how the two solutions compare to the original solution and to each other.arrow_forwardIn the Great Threads model, we found an upper bound on production of any clothing type by calculating the amount that could be produced if all of the resources were devoted to this clothing type. a. What if you instead use a very large value such as 1,000,000 for this upper bound? Try it and see whether you get the same optimal solution. b. Explain why any such upper bound is required. Exactly what role does it play in the model?arrow_forwardA company produces two types of tables a and be if it takes 2jours of cutting and 4hours of assembling to produce table a .it takes 10 hours of cutting and 4hours of assembling to produce table b. The company has at most 112 hours of cutting and 54 hours of assembly.the company profit is birr 60 for each table a and 170 for each table b .how many of each type of table should produces inorder to maximize profitarrow_forward
- Answer the following true or false e. For a finite production rate model, the optimal lot size to produce each cycle is equalto the maximum inventory each cyclearrow_forwardLet Yi=1 if Xi positive; 0 otherwise, i=1-6.Which of the following statement regarding the production setup constraint is not true? Group of answer choices A. As long as M2 is larger than 400, it is large enough for the production setup constraint X2-M2Y2<=0 B. We use Xi-MiYi<=0 where Mi is large enough number to ensure when Xi is positive, Yi is 1. C. We can not use Xi-XiYi as the production setup constraint because it is nonlinear. D. The decision variable Yi represents whether or not to use machine i.arrow_forwardDuring the next four months, a customer requires,respectively, 500, 650, 1000, and 700 units of acommodity, and no backlogging is allowed (that is,the customer’s requirements must be met on time).Production costs are $50, $80, $40, and $70 per unitduring these months. The storage cost from one monthto the next is $20 per unit (assessed on ending inventory). It is estimated that each unit on hand at the endof month 4 can be sold for $60. Assume there is nobeginning inventory.a. Determine how to minimize the net cost incurred inmeeting the demands for the next four months.b. Use SolverTable to see what happens to the decisionvariables and the total cost when the initial inventoryvaries from 0 to 1000 in 100-unit increments. Howmuch lower would the total cost be if the companystarted with 100 units in inventory, rather than none?Would this same cost decrease occur for every100-unit increase in initial inventory?arrow_forward
- GM manufactures bikini swimming suits. Their business is highly seasonal, with expected demands being 2800, 500, 100, and 850 dozen suits over the four quarters of next year. The company can produce 1200 dozen suits per quarter, but inventories must be built up to meet larger demands at a cost of $15 per dozen per quarter. GM wants to meet demand while minimizing this inventory cost. Formulate a time-phased LP with infinite time horizon. Findthe optimum solution using any solverarrow_forwardDuring the next four months, a customer requires, respectively, 600, 800, 1,200, and 900 units of a commodity, and no backlogging is allowed (that is, the customer's requirements must be met on time). Production costs are $80, $100, $105, and $90 per unit during these months. The storage cost from one month to the next is $20 per unit (assessed on ending inventory). It is estimated that each unit on hand at the end of month 4 can be sold for $60. Assume there is no beginning inventory. Determine how to minimize the net cost incurred in meeting the demands for the next four months. a. What is the optimized net cost?$ b. Use SolverTable to see what happens to the decision variables and the total cost when the initial inventory varies from 0 to 1,000 in 100-unit increments. How much lower would the total cost be if the company started with 100 units in inventory, rather than none?$arrow_forward(Need both parts a and b) During the next four months, a customer requires, respectively, 500, 650, 1000, and 700 units of a commodity, and no backlogging is allowed (that is, the customer’s requirements must be met on time). Production costs are $50, $80, $40, and $70 per unit during these months. The storage cost from one month to the next is $20 per unit (assessed on ending inventory). It is estimated that each unit on hand at the end of month 4 can be sold for $60. Assume there is no beginning inventory. A. What is the objective function in this problem? B. What are the constraints in this problem? Write algebraic expressions for eacharrow_forward
- Based on Zangwill (1992). Murray Manufacturing runs a day shift and a night shift. Regardless of the number of units produced, the only production cost during a shift is a setup cost. It costs $8000 to run theday shift and $6000 to run the night shift. Demand for the next two days is as follows: day 1, 4000; night 1, 3000; day 2, 2000; night 2, 5000. It costs $1 per unit to hold a unit in inventory for a shift.a. Determine a production schedule that minimizes the sum of setup and inventory costs. All demand must be met on time. (Note: Not all shifts have to be run.)b. After listening to a seminar on the virtues of the Japanese theory of production, Murray has cut the setup cost of its day shift to $1000 per shift and the setup cost of its night shift to $3500 per shift. Nowdetermine a production schedule that minimizes the sum of setup and inventory costs. All demand must be met on time. Show that the decrease in setup costs has actually raised the average inventorylevel. Is this…arrow_forwardA company produces A, B, and C and can sell theseproducts in unlimited quantities at the following unit prices:A, $10; B, $56; C, $100. Producing a unit of A requires 1hour of labor; a unit of B, 2 hours of labor plus 2 units ofA; and a unit of C, 3 hours of labor plus 1 unit of B. AnyA that is used to produce B cannot be sold. Similarly, anyB that is used to produce C cannot be sold. A total of 40hours of labor are available. Formulate an LP to maximizethe company’s revenues.arrow_forwardA large sporting goods store is placing an order for bicycles with its supplier. Four types of models can be ordered: the adult Open Trail, the adult Cityscape, the girl's Sea Sprite, and the boy's Trail Blazer. It is assumed that every bike ordered will be sold, and their profits, respectively, are 30, 25, 22, and 20. The LP model should maximize profit. There are several conditions that the store needs to worry about: The first constraint is about space to hold the inventory. An adult's bike needs two feet, but a child's bike needs only one foot. The store has 500 feet of space. The second constraint is about availability of assembly time. There are 1200 hours of assembly time available. The child's bike need 4 hours of assembly time; the Open Trail needs 5 hours and the Cityscape needs 6 hours. As the third constraint, the store would like to place an order for at least 275 bikes. a. Formulate an LP model for this problem. (by ignoring the integer requirements for decision…arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,