OPERTATIONS MGMT:SUSTAINABILITY
2nd Edition
ISBN: 9781323751718
Author: HEIZER
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6.S, Problem 17P
Summary Introduction
To determine: The upper and lower control chart limits.
Introduction: Control charts used to determine whether the process is under control or not. Attributes and variables are the factors under the control charts.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In the past, the defective rate for your product hasbeen 1.5%. What are the upper and lower control chart limits ifyou wish to use a sample size of 500 and z = 3 ?
In the past, the defective rate for your product hasbeen 1.5%. What arc the upper and lower control chart limits ifyou wish to use a sample size of 500 and = = 3?
The results of inspection of DNA samples taken over the past 10 days are given below. Sample size is
100.
Day
1
2
3
4
5
6
7
8
9
10
Defectives
7
9
9
11
7
8
0
11
13
2
a) The upper and lower
3-sigma
control chart limits are:
Part 2
UCLp
=
enter your response here
(enter your response as a number between 0 and 1, rounded to three decimal places).
LCLx
(enter your response as a number 4 decimal places)
Chapter 6 Solutions
OPERTATIONS MGMT:SUSTAINABILITY
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - Prob. 18DQCh. 6.S - Prob. 19DQCh. 6.S - Prob. 1PCh. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Prob. 6PCh. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 26PCh. 6.S - Prob. 27PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Select two potential problems-one in the Darden...Ch. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1EDCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 1CSCh. 6 - Prob. 2CSCh. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 3.1VCCh. 6 - Prob. 3.2VCCh. 6 - Prob. 3.3VCCh. 6 - Prob. 3.4VCCh. 6 - Prob. 3.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The results of an inspection of DNA samples takenover the past 10 days are given below. Sample size is 100. a) Construct a 3-sigma p -chart using this information. b) Using the control chart in part (a), and finding that the num-ber of defectives on the next three days are 12, 5, and 13, is the process in control?arrow_forwardThe results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100. Day 1 2 3 4 5 6 7 8 9 10 Defectives 7 9 9 11 7 8 0 11 13 2 The upper and lower 3-sigma control chart limits are: UCLp = (enter your response as a number between 0 and 1, rounded to three decimal places). LCLp = (enter your response as a number between 0 and 1, rounded to three decimal places).arrow_forwardFor 50 consecutive days, a process engineer has measured the weight of acomponent after it has been coated with a special paint. Each day, she takes a sampleof 10 components. The average across all 500 components (50 days, 10 componentsper day) is 45.343018 grams. The standard deviation across all parts is 0.0076382 gram.When constructing an X-bar chart, what would be the center line and what would be thelines for the upper and lower control limits?arrow_forward
- 2. The defect rate for a product has historically been about 1.6%. What are the upper and lower control chart limits for a p-chart, if you wish to use a sample size of 100 and 3-sigma limits? (please keep 4 decimal places and select the best answers) Select one: a. [-0.0215, 0.0535] b. [0, 0.0535] c. [0, 0.064] d. [0, 0.0375] e. none is correctarrow_forwardUsing samples of 197 credit card statements, an auditor found the following: Sample 1 3 errors Sample 2 3 errors Sample 3 5 errors Sample 4 9 errors 1. what alpha risk would control limits of .0470 and .0038 provide? 2. Using control limits of .0470 and .0038, is the process in control? 3. Construct a control chart for the process, assuming a fraction defective of 2 percent, using two-sigma control limits. Is the process in control?arrow_forward. You are working in a small, student-run company that sends out merchandise withuniversity branding to alumni around the world. Every day, you take a sample of 50shipments that are ready to be shipped to the alumni and inspect them for correctness.Across all days, the average percentage of incorrect shipments is 5 percent. What wouldbe the upper control limit for a p-chart?a. 0b. 0.05c. 0.03082207d. 0.142466arrow_forward
- Five data entry operators work at the data process-ing department of the Birmingham Bank. Each day for 30 days, the number of defective records in a sample of 250 records typedby these operators has been noted, as follows: a) Establish 3s upper and lower control limits.b) Why can the lower control limit not be a negative number? c) The industry standards for the upper and lower control lim-its are 0.10 and 0.01, respectively. What does this imply about Birmingham Bank’s own standards?arrow_forwardWe have taken 12 samples of 400 book pages found the following proportions of defective pages: .01, .02, .02, .00, .01, .03, .02, .01, .00, .04, .03, and .02. A page is considered defective when one or more errors are detected.a. Calculate the control limits for a p control chart.b. A new sample of 400 pages is taken, and 6 pages are defective.Is the process still in control?arrow_forwardThe results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100. Day 1 2 3 4 5 6 7 8 9 10 Defectives 3 5 5 6 3 3 0 4 6 2 a) The upper and lower 3-sigma control chart limits are: Part 2 UCLp = enter your response here (enter your response as a number between 0 and 1, rounded to three decimal places).arrow_forward
- We have taken 12 samples of 400 book pages found the following proportions of defective pages: .01, .02, .02, .00, .01, .03, .02, .01, .00, .04, .03, and .02. A page is considered defective when one or more errors are detected. Calculate the control limits for a p control chart. A new sample of 400 pages is taken, and 6 pages are defective. Is the process still in control?arrow_forward5. The results of inspection of DNA samples taken over the past 10 days are given below. Sample size is 100. Day 1 2 3 4 5 6 7 8 9 10 Defectives 7 9 9 11 7 8 0 11 13 2 a) The upper and lower 3-sigma control chart limits are: Part 2 UCLp = ________ (enter your response as a number between 0 and 1, rounded to three decimal places). LCLp = ________ (enter your response as a number between 0 and 1, rounded to three decimal places).arrow_forward6. The defect rate for your product has historically been about 4.50%. For a sample size of 500, the upper and lower 3-sigma control chart limits are: Part 2 UCLp = _______ (enter your response as a number between 0 and 1, rounded to four decimal places). The Standard deviation of defect rate of product is given __________. The Upper and Lower 3-sigma control charts limits are: UCLp ________ LCLp ________arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.