Chapter 6.S, Problem 35P
Summary Introduction
To determine: The upper and lower control limits of the various values taken of the fraction defective(p) in the given sample.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
In each of the following, name the term defined or answer the question. Answers are listed at the bottom.1. A Six Sigma process that is running at the center of its control limits would expect this defect rate.2. The variation that can be clearly identified and possibly managed.3. Variation is inherent in the process itself.4. If a process has a capability index of 1 and is running normally (centered on the mean), what percentage of the units would one expect to be defective?5. An alternative to viewing an item as simply good or bad due to it falling in or out of the tolerance range.6. Quality characteristics are classified as either conforming or not conforming to specification.
Why are adherents of quality management and continuous improvement opposed to the traditional perspective of quality control expressed in the use of acceptance sampling ?
Suppose that a quality characteristic is normally distributed with specifications at 100 ± 20. The process standard deviation is 6.(a) Suppose that the process mean is 100. What are the natural tolerance limits? Calculate Cp and Cpk and interpret these ratios. What fraction of parts do you expect to be defective?(b) Suppose that the process mean is 106. What are the natural tolerance limits? What is thefraction defective? Calculate Cp and Cpk and interpret these ratios.
Chapter 6 Solutions
Principles Of Operations Management
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - Prob. 18DQCh. 6.S - Prob. 19DQCh. 6.S - Prob. 1PCh. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Prob. 6PCh. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 28PCh. 6.S - Prob. 29PCh. 6.S - Prob. 30PCh. 6.S - Prob. 32PCh. 6.S - Prob. 33PCh. 6.S - Prob. 34PCh. 6.S - Prob. 35PCh. 6.S - Prob. 36PCh. 6.S - Prob. 37PCh. 6.S - Prob. 39PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 46PCh. 6.S - Prob. 48PCh. 6.S - Prob. 49PCh. 6.S - Prob. 50PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Prob. 2.2VCCh. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1EDCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 1CSCh. 6 - Prob. 2CSCh. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 3.1VCCh. 6 - Prob. 3.2VCCh. 6 - Prob. 3.3VCCh. 6 - Prob. 3.4VCCh. 6 - Prob. 3.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Walton Company has measured its quality costs for the past two years. After the company gathers its quality cost data, it summarizes those costs using the four categories shown below: Last Year This Year Prevention costs $ 349,900 $ 617,500 Appraisal costs $ 449,500 $ 523,200 Internal failure costs $ 805,800 $ 520,000 External failure costs $ 1,111,000 $ 673,200 1. Calculate the change in total cost of quality over the two-year period. 2. Is performance trending in a favorable or unfavorable direction?arrow_forwardExplain Which type of quality control would be most suitable for the manufacturing of canned beverages? Process control or acceptance sampling?arrow_forwardThe quality assurance manager is assessing the capability of a process that puts pressurized grease in an aerosol can. The design specifications call for an average of 60 pounds per square inch (psi) of pressure in each can with an upper specification limit of 65 psi and a lower specification limit of 55 psi. A sample is taken from production and it is found that the cans average 61 psi with a standard deviation of 2 psi. What is the capability of the process? What is the probability of producing a defect?arrow_forward
- Describe a situation where a control chart is the right tool for quality conformance. If you were a Quality Manager, would you be an advocate for the use of control charts? Why or why not?arrow_forwardWalton Company has measured its quality costs for the past two years. After the company gathers its quality cost data, it summarizes those costs using the four categories shown below: Last Year This Year Prevention costs $ 349,900 $ 617,500 Appraisal costs $ 449,500 $ 523,200 Internal failure costs $ 805,800 $ 520,000 External failure costs $ 1,111,000 $ 673,200 1. Calculate the total cost of quality last year and this year. 2. For last year, calculate the cost in each of the four categories as a percent of the total cost of quality. 3. For this year, calculate the cost in each of the four categories as a percent of the total cost of quality.arrow_forwardWrite, in your own words, what is the objective of the Statement of Quality Control Standard number 8 (SQCS No. 8)arrow_forward
- In the past, Alpha Corporation has not performed incoming quality control inspections but has taken the word of its vendors. However, Alpha has been having some unsatisfactory experience recently with the quality of purchased items and wants to set up sampling plans for the receiving department to use. For a particular component, X, Alpha has a lot of tolerance percentage defective of 10 percent. Zenon Corporation, from which Alpha purchases this component, has an acceptable quality level in its production facility of 3 percent for component X. Alpha hasa consumer’s risk of 10 percent and Zenon has a producer’s risk of 5 percent.a. When a shipment of product X is received from Zenon Corporation, what sample size should the receiving department test?b. What is the allowable number of defects in order to accept the shipment?arrow_forwardIn the past, Alpha Corporation has not performed incoming quality control inspections but has taken the word of its vendors. However, Alpha has been having some unsatisfactory experience recently with the quality of purchased items and wants to set up sampling plans for the receiving department to use. For a particular component, X, Alpha has a lot tolerance percentage defective of 10 percent. Zenon Corporation, from which Alpha purchases this component, has an acceptable quality level in its production facility of 3 percent for component X. Alpha has a consumer's risk of 10 percent and Zenon has a producer's risk of 5 percent. When a shipment of Product X is received from Zenon Corporation, what sample size should the receiving department test? Use Exhibit 10.16. Note: if the exact value of the computed LTPD ÷ AOQ ratio does not appear in Exhibit 10.16, use the next higher ratio. Note: Round up your answer to the next whole number. What is the allowable number of defects in…arrow_forwardQuality control in a factory pulls 40 parts with paint, packaging, or electronic defects from anassembly line. Of these, 28 had a paint defect, 17 had a packaging defect, 13 had an electronicdefect, 6 had both paint and packaging defects, 7 had both packaging and electronics defects, and 10had both paint and electronic defects. Did any part have all three types of defect? If so, how many?arrow_forward
- Why are prevention and appraisal costs considered costs of controlling quality, whereas internal and external failure costs are costs of failing to control quality?arrow_forwardNanosElectron, Inc. manufactures 75,000 circuit boards per month. A random sample of 800 boards is inspected every week for three characteristics. During a recent week, four defects were found for one characteristic, two defects were found for another characteristic, and one defect was found for the third characteristic. If these inspections produced defect counts that were representative of the population, what is the overall sigma level for this process? What is the sigma level for the characteristic that showed four defects?arrow_forwardDescribe the seven tools of quality control. Are some moreimportant than others? Would you use these tools separately ortogether? Give some examples of tools that could be used togetherarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.