Principles Of Operations Management
11th Edition
ISBN: 9780135173930
Author: RENDER, Barry, HEIZER, Jay, Munson, Chuck
Publisher: Pearson,
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 6.S, Problem 48P
Summary Introduction
To determine: The machine that has a higher capability index.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The Elon Company manufactures parts for an aircraft company using three computerized numerical controlled (CNC) turning centers. The company wants to decide which machines are capable of producing a specific part with design specifications of 0.0960 inches ±0.018 inches. The machines have the following process parameters:
Machine 1: X= 0.1095, σ = 0.0004
Machine 2: X = 0.0912, σ = 0.006
Machine 3: X = 0.0992, σ = 0.003
Determine which machines (if any) are capable of producing the products within the design specifications.
I'm unable to draw a line above the X, show computations.
1. The trading partners (such as suppliers, distributors and logistics service providers) are not part of the value stream of an organization.
True
False
2. A Total Quality Management (TQM) system systematically, sustainably and deliberately exposes hidden problems in an organization.
True
False
3. From a perspective of Statistical Process Control (SPC), a six-sigma process will have which of the following attributes?
a) The USL and LSL will be separated by a distance of six sigma
b) The process center will be aligned with the LSL
c) The number of defects produced by the process will be 0.0018 parts per million
d) All of the above
Two processes are used to produce forgings used in an aircraft wing assembly. Of 200 forgings selected from process 1.12 do not conform to the strength specifications. Where as of 300 forgings selected from process. 2.6 are nonconforming. Test the hypothesis that the two processes have identical fractions nonconforming.Use a=0.05, and explain the result
Chapter 6 Solutions
Principles Of Operations Management
Ch. 6.S - Prob. 1DQCh. 6.S - Define in statistical control.Ch. 6.S - Prob. 3DQCh. 6.S - Prob. 4DQCh. 6.S - Prob. 5DQCh. 6.S - Prob. 6DQCh. 6.S - Prob. 7DQCh. 6.S - Prob. 8DQCh. 6.S - Prob. 9DQCh. 6.S - Prob. 10DQ
Ch. 6.S - Prob. 11DQCh. 6.S - Prob. 12DQCh. 6.S - Prob. 13DQCh. 6.S - Prob. 14DQCh. 6.S - Prob. 15DQCh. 6.S - Prob. 16DQCh. 6.S - Prob. 17DQCh. 6.S - Prob. 18DQCh. 6.S - Prob. 19DQCh. 6.S - Prob. 1PCh. 6.S - Prob. 2PCh. 6.S - Prob. 3PCh. 6.S - Prob. 4PCh. 6.S - Prob. 5PCh. 6.S - Prob. 6PCh. 6.S - Prob. 7PCh. 6.S - Prob. 8PCh. 6.S - Prob. 9PCh. 6.S - Prob. 10PCh. 6.S - Prob. 11PCh. 6.S - Prob. 12PCh. 6.S - Prob. 13PCh. 6.S - Prob. 14PCh. 6.S - Prob. 15PCh. 6.S - Prob. 16PCh. 6.S - Prob. 17PCh. 6.S - Prob. 18PCh. 6.S - Prob. 19PCh. 6.S - Prob. 20PCh. 6.S - Prob. 21PCh. 6.S - Prob. 22PCh. 6.S - Prob. 23PCh. 6.S - Prob. 24PCh. 6.S - Prob. 25PCh. 6.S - Prob. 28PCh. 6.S - Prob. 29PCh. 6.S - Prob. 30PCh. 6.S - Prob. 32PCh. 6.S - Prob. 33PCh. 6.S - Prob. 34PCh. 6.S - Prob. 35PCh. 6.S - Prob. 36PCh. 6.S - Prob. 37PCh. 6.S - Prob. 39PCh. 6.S - Prob. 40PCh. 6.S - Prob. 41PCh. 6.S - Prob. 42PCh. 6.S - Prob. 43PCh. 6.S - Prob. 44PCh. 6.S - Prob. 45PCh. 6.S - Prob. 46PCh. 6.S - Prob. 48PCh. 6.S - Prob. 49PCh. 6.S - Prob. 50PCh. 6.S - Prob. 51PCh. 6.S - Prob. 52PCh. 6.S - Prob. 53PCh. 6.S - Prob. 54PCh. 6.S - Prob. 55PCh. 6.S - Prob. 1CSCh. 6.S - Prob. 2CSCh. 6.S - Prob. 1.1VCCh. 6.S - Prob. 1.2VCCh. 6.S - Prob. 1.3VCCh. 6.S - Prob. 2.1VCCh. 6.S - Prob. 2.2VCCh. 6.S - Prob. 2.3VCCh. 6.S - Prob. 2.4VCCh. 6 - Prob. 1EDCh. 6 - Prob. 1DQCh. 6 - Prob. 2DQCh. 6 - Prob. 3DQCh. 6 - Prob. 4DQCh. 6 - Prob. 5DQCh. 6 - Prob. 6DQCh. 6 - Prob. 7DQCh. 6 - Prob. 8DQCh. 6 - Prob. 9DQCh. 6 - Prob. 10DQCh. 6 - Prob. 11DQCh. 6 - Prob. 12DQCh. 6 - Prob. 13DQCh. 6 - Prob. 14DQCh. 6 - Prob. 15DQCh. 6 - Prob. 16DQCh. 6 - Prob. 17DQCh. 6 - Prob. 18DQCh. 6 - An avant-garde clothing manufacturer runs a series...Ch. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Kathleen McFaddens restaurant in Boston has...Ch. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10PCh. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 1CSCh. 6 - Prob. 2CSCh. 6 - Prob. 3CSCh. 6 - Prob. 1.1VCCh. 6 - Prob. 1.2VCCh. 6 - Prob. 1.3VCCh. 6 - Prob. 1.4VCCh. 6 - Prob. 2.1VCCh. 6 - Prob. 2.2VCCh. 6 - Prob. 2.3VCCh. 6 - Prob. 2.4VCCh. 6 - Prob. 3.1VCCh. 6 - Prob. 3.2VCCh. 6 - Prob. 3.3VCCh. 6 - Prob. 3.4VCCh. 6 - Prob. 3.5VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Using traditional methods, it takes 101 hours to receive a basic driving license. A new license training method using Computer Aided Instruction (CAI) has been proposed. A researcher used the technique with 100 students and observed that they had a mean of 102 hours. Assume the variance is known to be 16. A level of significance of 0.05 will be used to determine if the technique performs differently than the traditional method. Find the value of the test statistic. Round your answer to 2 decimal places. Enter the value of the test statistic.arrow_forwardTwo machines are currently in use in a process atthe Dennis Kira Mfg. Co. The standards for this process areLSL = .40011 and USL = .40311• Machine One is currently producingwith mean = .401 II and standard deviation .000411• Machine ..)Two is currently producing with mean .401511 and standard deviation.000511• Which machine has the higher capability index?arrow_forwardA manager has the option of using any one of three machines for a job. The processes andtheir standard deviations are listed as follows. Determine which machines are capable if thespecifications are 10.00 mm and 10.80 mm.Process Standard Deviation (mm)A .13B .08C .16arrow_forward
- You are a food specialist in a company that specializes inrefrigerated delicacies, and one of your brands requires beingmaintained at a temperature of 5°C. You determine averagewater activity (aw) at this temperature to be 0.2. One day, you are informed that the cooling systems onone of the delivery trucks carrying your company’s productsmalfunctioned while en route to its destination and it would notbe fixed until the next delivery. The driver has informed you thatthe temperature in the delivery bay of the truck is averaging55°C. You estimate a heat of sorption (Q) of 19 kJ/mol. Calculate the water activity of the brand at this elevatedtemperature and comment on it’s integrity. Should the deliverystill push through? Or should the products be recalled anddisposedarrow_forwardThe relationship between study hours and exam score was estimated as below in a linear format. Exam score = 6.24 * Study hours + 54.72 (The p-value for the coefficient of Study hours is 0.04.) How can the relationship between exam score and study hours be interpreted? As a person studies 1 more hour, his or her exam score is expected to decrease by 6.24 points. As a person studies 1 more hour, his or her exam score is expected to increase by 6.24 points. There is no meaningful relationship between exam score and study hours from a statistical point of view.arrow_forwardSam’s Long Life 60-watt light bulbs are designed to have a life of 1,350 hours with tolerance of ± 340 hours. A recent representative sample from the process that makes these light bulbs revealed a mean of 1,290 hours, with a standard deviation of 94 hours. Compute a. Compute the process capability ratio and the process capability index, and comment on the overall capability of the process b. Explain to what extent the process for producing Sam’s Long Life 60-watt light bulbs would have to be improved to achieve 4-sigma quality. c. show detail workarrow_forward
- A process is in statistical control with = 202,5 y s = 2,0. Specifications are atLSL = 196 and USL = 206.a) Estimate the process capability with an appropriate process capability ratio.b) What is the potential capability of this process?c) Items that are produced below the lower specification limit must bescrapped, while items that are above the upper specification limit can bereworked. What proportion of the process output is scrap and whatproportion is rework?d) Because scrap is more expensive than rework, the process has been centered closer to the upper specification limit. If scrap is twice as expensive as rework, is the process mean at the best possible location? What value of the process target would you recommend?arrow_forwardA process screens a certain type of potash granule, resulting in a mean diameter of 0.067 cm and a standard deviation of 0.004 cm. The allowable variation in granule diameter is from 0.048cm to 0.087cm. Is the process capable? a. Cannnot be determined because sample size is not available b. Cannot be determined because USL and LSL information is not available c. Process is NOT capable d. Process is capablearrow_forwardJanice Sanders, CEO of Pine Crest Medical Clinic, is concerned over the number of times patients must wait more than 30 minutes beyond their scheduled appointments. She asked her assistant to take random samples of 55 patients to see how many in each sample had to wait more than 30 minutes. Each instance is considered a defect in the clinic process. The table below contains the data for 15 samples. Sample Number of Defects Sample Number of Defects Sample Number of Defects 1 3 6 4 11 1 2 6 7 7 12 3 3 4 8 1 13 7 4 3 9 5 14 7 5 6 10 2 15 3 a. Assuming Janice Sanders is willing to use three-sigma control limits, construct the upper and lower control limits. The UCLp equals to what and the LCLp equals to what (Enter your responses rounded to four decimal places.…arrow_forward
- "The table below is data on telephone usage time by operators to serve customer requests that will be used to explain the use of Xbar and R-chart". Question: a. Create UCL and LCL with Limit Control Factor A2b. Create UCL and LCL with Limit Control Factor D3 and D4arrow_forwardNeed help calculating the margin of error for the question below. I show n=100, sigma = 1, and 95% prob equls a z score of 1.96 for z_alpha/2. Just having issues calcuating the Margin of Error value. The manager of a grocery store has taken a random sample of 100 customers. The average length of time it took these 100 customers to check out was 3 minutes. It is known that the standard deviation of the population of checkout times is 1 minute. With a 0.95 probability, the sample mean will provide a margin of error of 0.196. If we wanted to cut this margin of error in half, how many customers would we need to include in our sample?arrow_forwardAbernathy, Inc., produces two different generators and is concerned about their quality. The company has identified the following quality activities and costs associated with the two products: Generator A Generator B Units produced 170,000 340,000 Warranty work (units) 1,700 850 Scrapped units (number) 3,400 850 Inspection (hours) 3,400 1,700 Quality training (hours) 85 85 Activities: Performing warranty work $816,000 Scrapping units 612,000 Inspecting 306,000 Quality training 85,000 Required: 1. Calculate the quality cost per unit for each product, and break this unit cost into quality cost categories. If required, round your answers to the nearest cent. Generator A Generator B Unit cost $fill in the blank 1 $fill in the blank 2arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Introduction to Forecasting; Author: Ekeeda;https://www.youtube.com/watch?v=5eIbVXrJL7k;License: Standard YouTube License, CC-BY