ENGR.ECONOMIC ANALYSIS
ENGR.ECONOMIC ANALYSIS
14th Edition
ISBN: 9780190931919
Author: NEWNAN
Publisher: Oxford University Press
Question
Book Icon
Chapter 7, Problem 1P

(a)

To determine

To find the interest rate earned on investment.

(b)

To determine

To list down the adverse effects of mining on environment.

Blurred answer
Students have asked these similar questions
Nestle Ltd. It produces its premium plant food in 50 Kg bags. Demand is 100,000 Kgs. per week and the plant operates 52 weeks each year. Nestle can produce 250,000 Kgs. per week. The setup cost is OMR 200 and the annual holding cost rate is OMR 0.30 per bag. What will the optimal duration of the downtime in years? a. 0.065. None is correct ac 0.069 d. 0.088 e. 0.721 f. 0.076
1. You are valuing a 10-acre vacant lot with a septic system and a well on site. The size adjustment factor for 10 acres is 2.23.   You have found two recent sales to use as comparables.   -Sale 1 is 3.5 acres in size and has a septic system and a well on site. It sold for $200,000. The corresponding size adjustment factor for 3.5 acres is 1.57.   -Sale 2 is 7 acres in size and sold for $225,000. However, it does not have a septic system or a well, which will cost $50,000 total to install. The corresponding size adjustment factor for 7 acres is 1.93.   CALCULATE THE RANGE OF THE VALUE OF THE 10-ACRE VACANT LOT ADJUSTED FOR SIZE, ROUNDED TO THE NEAREST $1,000. SHOW YOUR WORK
build a modelAn industrial park is being planned for a tract of land near a river. To prevent flood damage to the industrial buildings that will be built on this low-lying land, an earthen embankment can be constructed.        The height of the embankment will be determined by an economic analysis of the costs and benefits.The following data have been gathered (Tables 1 and 2).    The embankment is expected to last 40 years and will require no maintenance.Whenever the flood water flows over the embarkment, a $310,000 in annual damages occur.        The corporation uses an interest rate of 15%         a) if they build the embarkment, what height should it have?   Table 1     Table 2     Embankment Height Above Roadway (m) Initial Cost ($)   Embankment Height Above Roadway (m) Avg Frequency That Flood Level  Will Exceed heigh of embarkment   2.0  $ 100,000.00   2.0  Once in 3 years    2.5  $ 165,000.00   2.5  Once in 8 years    3.0  $ 300,000.00   3.0  Once in 25 years    3.5…

Chapter 7 Solutions

ENGR.ECONOMIC ANALYSIS

Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
ENGR.ECONOMIC ANALYSIS
Economics
ISBN:9780190931919
Author:NEWNAN
Publisher:Oxford University Press
Text book image
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Text book image
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Text book image
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Text book image
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Text book image
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education