a)
To determine: The average cycle time for each operation.
Introduction: The amount of the dependency on human effort by an organization in terms of achieving its goals is given by the work design. It is directly linked to the productivity of an organization where good work design helps in achieving high productivity.
a)
Explanation of Solution
Given information:
Observation (minutes per cycle) | |||||||
Element | Performance rating | 1 | 2 | 3 | 4 | 5 | 6 |
1 | 90 | 0.44 | 0.5 | 0.43 | 0.45 | 0.48 | 0.46 |
2 | 85 | 1.5 | 1.54 | 1.47 | 1.51 | 1.49 | 1.52 |
3 | 110 | 0.84 | 0.89 | 0.77 | 0.83 | 0.85 | 0.8 |
4 | 100 | 1.1 | 1.14 | 1.08 | 1.2 | 1.16 | 1.26 |
Calculation of average time per cycle:
Observation (minutes per cycle) | |||||||
Performance rating | 1 | 2 | 3 | 4 | 5 | 6 | Average time per cycle |
90 | 0.44 | 0.5 | 0.43 | 0.45 | 0.48 | 0.46 | 0.46 |
85 | 1.5 | 1.54 | 1.47 | 1.51 | 1.49 | 1.52 | 1.505 |
110 | 0.84 | 0.89 | 0.77 | 0.83 | 0.85 | 0.8 | 0.83 |
100 | 1.1 | 1.14 | 1.08 | 1.2 | 1.16 | 1.26 | 1.156667 |
Excel worksheet:
Average time per cycle is calculated by taking average of all cycle in each element which is average of 0.44, 0.5, 0.43, 0.45, 0.48 and 0.46 which gives 0.46 as average time per cycle for element 1 and similar method follows for element 2, 3 and 4.
b)
To determine: The normal time for the operation.
b)
Explanation of Solution
Given information:
Observation (minutes per cycle) | |||||||
Element | Performance rating | 1 | 2 | 3 | 4 | 5 | 6 |
1 | 90 | 0.44 | 0.5 | 0.43 | 0.45 | 0.48 | 0.46 |
2 | 85 | 1.5 | 1.54 | 1.47 | 1.51 | 1.49 | 1.52 |
3 | 110 | 0.84 | 0.89 | 0.77 | 0.83 | 0.85 | 0.8 |
4 | 100 | 1.1 | 1.14 | 1.08 | 1.2 | 1.16 | 1.26 |
Formula:
Calculation of normal time:
Observation (minutes per cycle) | |||||||||
Element | Performance rating | 1 | 2 | 3 | 4 | 5 | 6 | Average time per cycle | NT |
1 | 0.9 | 0.44 | 0.5 | 0.43 | 0.45 | 0.48 | 0.46 | 0.46 | 0.414 |
2 | 0.85 | 1.5 | 1.54 | 1.47 | 1.51 | 1.49 | 1.52 | 1.505 | 1.27925 |
3 | 1.1 | 0.84 | 0.89 | 0.77 | 0.83 | 0.85 | 0.8 | 0.83 | 0.913 |
4 | 1 | 1.1 | 1.14 | 1.08 | 1.2 | 1.16 | 1.26 | 1.156666667 | 1.156667 |
Excel worksheet:
Normal time is calculated by multiplying observed timing, 0.46 and performance rating, 0.9 which yields 0.414 minutes for element 1, 2, 3 and 4.
c)
To determine: The standard time for the operation.
c)
Explanation of Solution
Given information:
Observation (minutes per cycle) | |||||||
Element | Performance rating | 1 | 2 | 3 | 4 | 5 | 6 |
1 | 90 | 0.44 | 0.5 | 0.43 | 0.45 | 0.48 | 0.46 |
2 | 85 | 1.5 | 1.54 | 1.47 | 1.51 | 1.49 | 1.52 |
3 | 110 | 0.84 | 0.89 | 0.77 | 0.83 | 0.85 | 0.8 |
4 | 100 | 1.1 | 1.14 | 1.08 | 1.2 | 1.16 | 1.26 |
Formula:
Calculation of standard time:
Allowance factor is calculated by dividing 1 with difference of 1 and 0.15 which yields 1.15.
Observation (minutes per cycle) | |||||||||||
Element | Performance rating | 1 | 2 | 3 | 4 | 5 | 6 | Average time per cycle | NT | Afjob | ST |
1 | 0.9 | 0.44 | 0.5 | 0.43 | 0.45 | 0.48 | 0.46 | 0.46 | 0.414 | 1.15 | 0.4761 |
2 | 0.85 | 1.5 | 1.54 | 1.47 | 1.51 | 1.49 | 1.52 | 1.505 | 1.27925 | 1.15 | 1.471138 |
3 | 1.1 | 0.84 | 0.89 | 0.77 | 0.83 | 0.85 | 0.8 | 0.83 | 0.913 | 1.15 | 1.04995 |
4 | 1 | 1.1 | 1.14 | 1.08 | 1.2 | 1.16 | 1.26 | 1.157 | 1.157 | 1.15 | 1.330167 |
Excel worksheet:
Standard time for the operation is calculated by multiplying normal time of 0.414 minutes with allowance factor of 1.15 which gives 0.4761 minutes for element 1 and same procedure goes with element 2, 3 and 4.
Want to see more full solutions like this?
Chapter 7 Solutions
OPERATIONS MANAGEMENT W/ CNCT+
- Identify to which category of “personal”, “fatigue”, or “delay” the following job elements belong to a) The hair-dresser takes the phone to confirm a booking, in the middle of a client haircut. b) The doctor takes a cup of coffee and a quick rest in a short time between visiting two patients. c) In a long-distance drive, the coach driver stops in a service area every two to three hours to have some food.arrow_forwardFor a time study of a health insurance claims-adjusting process, the analyst uses the continuous method of recording times. The job is divided into four work elements. Shown in Figure are the performance rating factors, RF, and the continuous method recorded times, r, for each work element.a. Calculate the normal time for this job. b. Calculate the standard time for this job, assuming that the allowance is 20 percent of the normal time. c. What is the appropriate sample size for estimating the time for element 2 within {10 percent of the true mean with 95 percent confidence?arrow_forwardA hotel housekeeper, Alison Harvey, wasobserved five times on each of four task elements, as shownin the following table. On the basis of these observations, findthe standard time for the process. Assume a 10% allowancefactor.arrow_forward
- If the normal time is 1.30 min for a repetitive task that produces one work unit per cycle, and the company uses a PFD allowance factor of 12%, determine (a) the standard time for the task and (b) how many work units are produced in an 8-hour shift at standard performance.arrow_forwardA widget assembly process was timed for 75 cycles and had an average of 1.5 minutes per piece. The performance rating was 95%, and workday allowances are 10 percent. Determine the following: a) Observed time b) Normal time c) Standard time d) How might this information be used?arrow_forwardIn time study, the rating factor is applied to determine a)standard time of a job b)merit rating of the worker c)fixation of incentive rate d)normal time of a worker [Don't use chatgpt otherwise give 20downvotes]arrow_forward
- After being observed many times, Beverly Demarr, ahospital lab analyst, had an average observed time for blood testsof 12 minutes. Beverly’s performance rating is 105%. The hospitalhas a personal, fatigue, and delay allowance of 16%.a) Find the normal time for this process.b) Find the standard time for this blood test.arrow_forwardDescribe when is work sampling a more appropriate work measurement technique than time study ?arrow_forwardHow many work cycles should be timed to estimate the average cycle time to within 2 percent ofthe sample mean with a confidence of 99 percent if a pilot study yielded these times (minutes):5.2, 5.5, 5.8, 5.3, 5.5, and 5.1? The standard deviation is .253 minutes per cycle.arrow_forward
- Nine observations from a work measurement study using continuous timing are shown below. Allowances are determined as: personal, five percent; fatigue, eight percent; delay, five percent. Use the Work Measurement Excel template to determine the standard time for this operation. Work Observation Element 1 2 3 4 5 6 7 8 9 Performance Rating A 0.09 0.14 0.08 0.07 0.10 0.09 0.15 0.14 0.15 110% B 0.23 0.20 0.22 0.20 0.24 0.23 0.29 0.27 0.27 90% C 0.49 0.51 0.49 0.46 0.49 0.49 0.51 0.49 0.48 95% D 0.64 0.66 0.63 0.62 0.69 0.67 0.67 0.66 0.70 115% E 0.72 0.74 0.74 0.69 0.81 0.82 0.79 0.80 0.82 105% F 1.01 1.03 0.99 0.99 1.09 1.12 1.03 1.07 1.12 85% Round your answer to two decimal places. minutesarrow_forwardAfter training, Mary Fernandez, a computer tech-nician, had an average observed time for memory-chip tests of 12 seconds. Mary’s performance rating is 100%. The firm has apersonal fatigue and delay allowance of 15%.a) Find the normal time for this process.b) Find the standard time for this process.arrow_forwardGive at least 3 examples of jobs that requires Work Measurement and give a brief explaination.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.