The value of XC .

Blurred answer
Students have asked these similar questions
The minimum cycle length for an intersection is determined to be 95 seconds. The critical lane group flow ratios were calculated as 0.235, 0.250, 0.170, and 0.125 for phases 1–4, respectively. What Xc was used in the determination of this cycle length, assuming a lost time of 5 seconds per phase?
The minimum cycle length for an intersection is determined to be 95 seconds. The cirtical lane group flow ratios were calculated as 0.235, 0.250, 0.170 and 0.125 for phases 1- 4 respectively. What Xc was used in the determination of this cycle length, assuming a lost time of 5 seconds per phase?
Subject: transportation engineering Read the question carefully and give me right solution according to the question. A signal has four phases, where the critical lane group flow ratios are 0.115, 0.204, 0.099, and 0.248. If the lost time per phase is 6 seconds and the critical intersection v/c ratio is 0.88, calculate the minimum cycle length and the phase effective green times such that the lane group v/c ratios are equal.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning