Summary Introduction
To determine: The trainee who will make the standard and explain the reason behind it.
Introduction: Learning curve is referred as the cost curve, experience curve, efficiency curve or productivity curve. The leaving curve gives information about the cost, efficiency, productivity and performance of an organization.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Providence Assessment Center screens and trains employees for a computer assembly firm in Boston. The progress of all trainees is tracked, and those not showing the proper progress are moved to less demanding programs. By the tenth repetition, trainees must be able to complete the assembly task in 1 hour or less. Susan has just spent 5 hours on the fourth unit and 4.5 hours completing her eighth unit, while another trainee, Julie took 4 hours on the third and 2.8 hours on the sixth unit. Should you encourage either or both of the trainees to continue? Why? Present calculation steps.
[Hint: For each trainee, 1) Determine the learning rate (%) – use doubling concept. 2) Calculate time for the 1st unit (T1) – use table, 3) Calculate time for the 10th Unit (T10) –use table]
Susan
Julie
Learning rate (%) – doubling concept
Time for the 1st unit
Time for the 10th unit
A recently negotiated union contract allows workers in a shipping department 24 minutes for rest, 10 minutes for personal time, and 14 minutes for delays for each four hours worked. A time study analyst observed a job that is performed continuously and found an average time of 6.0 minutes percycle for a worker she rated at 95 percent. What standard time is applicable for that operation?
A worker-machine operation was found to involve 3.3 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker’s time averaged 1.9 minutes per cycle, and the worker was given a rating of 120 percent (machine rating is 100 percent). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 12 percent of work time, determine the standard time for this job.
Chapter 7 Solutions
OPERATIONS MANAGEMENT (LL) W/CONNECT
Ch. 7.S - Prob. 1DRQCh. 7.S - Prob. 2DRQCh. 7.S - Prob. 3DRQCh. 7.S - Prob. 4DRQCh. 7.S - Prob. 5DRQCh. 7.S - Prob. 6DRQCh. 7.S - Prob. 7DRQCh. 7.S - Prob. 8DRQCh. 7.S - Prob. 9DRQCh. 7.S - Prob. 10DRQ
Ch. 7.S - Prob. 1PCh. 7.S - Prob. 2PCh. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - Prob. 6PCh. 7.S - Prob. 7PCh. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - Prob. 11PCh. 7.S - Prob. 12PCh. 7.S - Prob. 13PCh. 7.S - Prob. 14PCh. 7.S - Prob. 15PCh. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Prob. 18PCh. 7.S - Prob. 19PCh. 7.S - Prob. 1CQCh. 7.S - Prob. 2CQCh. 7.S - Prob. 3CQCh. 7 - Prob. 1DRQCh. 7 - What are some of the main advantage and...Ch. 7 - Prob. 3DRQCh. 7 - Prob. 4DRQCh. 7 - Prob. 5DRQCh. 7 - Prob. 6DRQCh. 7 - Prob. 7DRQCh. 7 - What are motion study principles? How are they...Ch. 7 - Prob. 9DRQCh. 7 - Prob. 10DRQCh. 7 - Prob. 11DRQCh. 7 - Prob. 12DRQCh. 7 - Prob. 13DRQCh. 7 - Prob. 14DRQCh. 7 - Prob. 15DRQCh. 7 - Prob. 16DRQCh. 7 - Prob. 17DRQCh. 7 - Prob. 18DRQCh. 7 - Prob. 19DRQCh. 7 - Prob. 1TSCh. 7 - Prob. 2TSCh. 7 - Prob. 3TSCh. 7 - Prob. 1CTECh. 7 - Prob. 2CTECh. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Given these observed times (in minutes) for four...Ch. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10PCh. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - An analyst made the following observations about...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- United Research Associates (URA) had received a contract to produce two units of a new cruise missile guidance control. The ?rst unit took 4,000 hours to complete and cost $30,000 in materials and equipment usage. The second took 3,200 hours and cost $21,000 in materials and equipment usage. Labor cost is charged at $18 per hour.The prime contractor has now approached URA and asked to submit a bid for the cost of producing another 20 guidance controls.a. What will the last unit cost to build?b. What will be the average time for the 20 missile guidance controls?c. What will the average cost be for guidance control for the 20 in the contract?arrow_forwardYou want to know the standard time of a welding process. The analyst has obtained the followingi information: average timed time - 1.30 minutes rhythm assessment - 110 fixed supplements - 5% variable supplements - 2% Determine the standard time, in minutes, of the welding process: a) 143 min b) 145 min c) 150 min d) 153 minarrow_forwardEstimate the number of repetitions that new service worker Irene will require to achieve “standard” if the standard is 18 minutes per repetition. She took 30 minutes to do the initial repetition and 25 minutes to do the next repetition.arrow_forward
- The snapback timing method was used to obtain the average times and performance ratings for work elements in a manual repetitive task. (See table below). All elements are worker-controlled and were performance rated at 80%. Element e is an irregular element performed every five cycles. A 15% allowance for personal time, fatigue, and delays isapplied to the cycle. Determine (a) the normal time and (b) the standard time for this cycle. If the worker’s performance during actual production is 120% on all manual elements for 7 actual hours worked on an 8-hour shift, (c) how many units will be producedarrow_forwardThe normal time for a work cycle in a worker–machine system is 6.27 min. For setting the standard time, the PFD allowance factor is 12% and the machine allowance factor is 25%.The work cycle includes manual elements totaling a normal time of 5.92 min, all but 0.65 min of which are performed as internal elements. Determine (a) the standard time for the cycle and (b) the daily output at standard performance. (c) During an 8-hour shift, theworker lost 39 min due to personal time, rest breaks, and delays, and she produced 72 pieces. What was the worker’s pace on the operator-controlled portion of the shift?arrow_forwardlocal market research fim has just won a contract for several thousand small projects involving data gathering and statistical analysis. In the past, the firm has assigned each project to a single member of its highly trained professional staff. This person would both gather and analyze the data Using this approach, an experienced person can complete an average of 10 such projects in an eight-hour day. The firm's management is thinking of assigning two people to each project in order to allow them to specialize and become more efficient The process would require the data gatherer to fill out a matrix on the computer, check it and transmit it to the statistical analysis program for the analyst to complete. Data can be gathered on one project while the analysis is being completed on another, but the analysis must be complete before the statistical analysis program can accept the new data. After some practice, the new process can be completed with a standard time of 20 minutes…arrow_forward
- You're responding to a troubleshooting issue in HR regarding a broken laser printer. According to reports, the printer completes the print operation and sends the paper through successfully. The content appears to be appropriately printed on the page. The toner, on the other hand, is readily smudged and adheres to other papers, equipment, and clothing. Which part of the printer is most likely in need of replacement? Make a list of the steps required to complete the assignment.arrow_forwardA Northeast Airline gate agent, Chip Gilliken, gives out seat assignments to ticketed passengers. He takes an average of 52 seconds per passenger and is rated 110% in performance. A typical agent is expected to take 17.2 seconds to make the seat assignments (round your response to one decimal place).arrow_forwardA worker-machine operation was found to involve 3.3 minutes of machine time per cycle in the course of 40 cycles of stopwatch study. The worker's time-averaged 1.9 minutes per cycle, and the worker was given a rating of 120% (machine rating is 100%). Midway through the study, the worker took a 10-minute rest break. Assuming an allowance factor of 12% of work time, determine the standard time for this job. Hints: you should consider both machine time and machine time together. Also, Allowance only applies to the man, not a machine.arrow_forward
- Of the session management best practices, which are the top three in importance? Describe each best practice with some detail.arrow_forwardThe first day of basic training at the Air Force Academy is quite a sight, with 1500 cadets being processed in. This involves getting haircuts, uniforms, room assignments, and a mountain of paperwork. At the Uniform Fitting station, the worker takes the measurements on the cadet (which takes about 2 minutes), then retrieves shirts, pants and hats in his/her size (which takes about 2 minutes), waits for the cadet to try on the pants (which takes about 1 minute) and then marks the pants for hemming (which takes about 1 minute). The in-processing takes place from 8 AM to 5 PM with an hour off for lunch (8 hours). __________2a. How many cadets can a single worker fit for uniforms on that hectic day? __________2b. How many workers would be needed to fit 1601 cadets in one day, if everyone works at full capacity?arrow_forwardThe normal time for a work cycle in a worker-machine system is 6.0 min. For setting the standard time, the PFD allowance factor is 15%, and the machine allowance factor is 20%. The work cycle includes manual elements totaling a normal time of 5.5 min, all but 0.75 min of which are performed as internal elements. Determine (a) the daily output at standard performance. (b) During an 8-hour shift, the worker lost 20 min due to personal time, rest breaks, and delays, and she produced 80 pieces. What was the worker’s pace on the operator-controlled portion of the shift?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.