Pearson Etext For Principles Of Operations Management: Sustainability And Supply Chain Management -- Access Card (11th Edition)
11th Edition
ISBN: 9780135639122
Author: Jay Heizer, Barry Render, Chuck Munson
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 8, Problem 26P
Summary Introduction
To determine: The preferable site.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The Skulls, a student social organization, has two different locations underconsideration for constructing a new chapter house. Skull's president, a POM student, estimates that due to differing land costs, utility rates, etc., both fixed and variable costs would be different for each of the proposed sites, as follows:
Location
Annual Fixed
Variable
Alpha Ave
$5000
$200 per person
Beta Blvd
$8000
$150 per person
If it is estimated that thirty persons will be living in this new chapter house, which location should the Skulls select?
Katie Reynolds owns two exclusive women's clothingstores in Miami. In her plan to expand to a third location,she has narrowed her decision to three sites- one in a downtownoffice building, one in a shopping mall, and one in anold Victorian house in the suburban area of Coral Gables. Shefeels that rent is absol utely the most importa nt factor to beconsidered, although walk-in traffic is 90% as important asrent. Further, the more distant the new store is from her twoexisting stores, the better. She weights this factor to be 80%as important as walk-in traffic. Katie developed the followingtable, in which she graded each site from A to D, with A beingbest. Which site is preferable?
A dental care facility location analysis has been narrowed down to two locations in Alexandria; Stanley and Camp-Cesar. The main factors in the decision will be the supply of dental clinic raw materials, which has a weight of 0.50, transportation cost, which has a weight of 0.40, and labor cost, which has a weight of 0.10. The scores for raw materials, transportation, and labor are for Stanley 60, 80, and 70, respectively; for Camp-Cesar 70, 50, and 90, respectively. Given this information and a minimum acceptable composite score of 75, we can say that the facility OM should: A. be indifferent between these locationsB. choose StanleyC. choose Camp-CesarD. reject both locationsE. build a dental care facility in both districts.Why? – Comment to justify your (the OM) decision.
Chapter 8 Solutions
Pearson Etext For Principles Of Operations Management: Sustainability And Supply Chain Management -- Access Card (11th Edition)
Ch. 8 - Prob. 1EDCh. 8 - Prob. 1DQCh. 8 - Prob. 2DQCh. 8 - Prob. 3DQCh. 8 - Prob. 4DQCh. 8 - Prob. 5DQCh. 8 - Prob. 6DQCh. 8 - Prob. 7DQCh. 8 - Prob. 8DQCh. 8 - Prob. 9DQ
Ch. 8 - Prob. 10DQCh. 8 - Prob. 11DQCh. 8 - Prob. 12DQCh. 8 - Prob. 13DQCh. 8 - Prob. 14DQCh. 8 - Prob. 15DQCh. 8 - Prob. 16DQCh. 8 - Prob. 17DQCh. 8 - Prob. 18DQCh. 8 - Prob. 1PCh. 8 - Prob. 2PCh. 8 - Prob. 3PCh. 8 - Prob. 4PCh. 8 - Prob. 5PCh. 8 - Prob. 6PCh. 8 - Prob. 7PCh. 8 - Prob. 8PCh. 8 - Prob. 9PCh. 8 - Prob. 10PCh. 8 - Prob. 11PCh. 8 - Prob. 12PCh. 8 - Prob. 13PCh. 8 - Prob. 14PCh. 8 - Prob. 15PCh. 8 - Prob. 16PCh. 8 - Prob. 17PCh. 8 - Prob. 18PCh. 8 - Prob. 19PCh. 8 - Prob. 20PCh. 8 - Prob. 21PCh. 8 - Prob. 22PCh. 8 - Prob. 23PCh. 8 - Prob. 24PCh. 8 - Prob. 26PCh. 8 - Prob. 27PCh. 8 - Prob. 28PCh. 8 - Prob. 29PCh. 8 - Prob. 31PCh. 8 - Prob. 32PCh. 8 - Prob. 1CSCh. 8 - Prob. 2CSCh. 8 - Prob. 3CSCh. 8 - Prob. 4CSCh. 8 - Prob. 1.1VCCh. 8 - Prob. 1.2VCCh. 8 - Prob. 1.3VCCh. 8 - Prob. 2.1VCCh. 8 - Prob. 2.2VCCh. 8 - Prob. 2.3VCCh. 8 - Prob. 2.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Brian Trump has obtained fixed- and variable-cost information for four potential sites for his professional wrestling school and summarized it in tabular form below. All values are in dollars. Site Fixed Cost Variable Cost A 10,000 24 B 12,000 20 C 14,000 18 D 16,000 17 Brian plans to charge the same amount for tuition regardless of where he decides to establish his school. If he believes that 700 students will matriculate each year, which site will result in the lowest total cost?arrow_forwardThere are three potential locations: Charlotte, NC; Atlanta, GA; and Columbia, SC.Charlotte would involve a fixed cost of $4,000 per month and a variable cost of $4 per unit;Atlanta would involve a fixed cost of $3,500 per month and a variable cost of $5 per unit; andColumbia would involve a fixed cost of $5,000 per month and a variable cost of $6 per unit. Useof the Charlotte location would increase system transportation costs by $19,000 per month,Atlanta by $22,000 per month, and Columbia by $18,000 per month. Which location would resultin the lowest total cost to handle 800 units per month?arrow_forwardSarah has a startup business that makes two distinct bird feeders that she has designed. Sarah is planning on operating a small factory to build the bird feeders. She is looking at two possible locations, A and B. If she chooses location A, the lease on the building will be higher than location B, thus leading to higher fixed costs than what she would have with location B. However, if she makes more than 20,000 units, both locations will likely have to be expanded, both the physical buildings and the manufacturing equipment. Variable costs to produce each unit will vary by location as well as by product. For example, the first design will have variable costs of $10 and $15 in locations A and B respectively, while the second bird feeder design will have variable costs of $20 and $25 respectively depending on location. However, she thinks that variable costs will decrease if she sells more than 5,000 units, as she will receive discounts from her suppliers at that point. She is unsure of…arrow_forward
- In deciding on where to locate their next grocery store, Publix narrowed it down to 3 locations (St. Augustine, the Airport area, or the Westside). They are using 2 criteria to make their decisions costs (with a weight of 70%) and customer base (with a weight of 30%). Each item was scored on a 10-point scale with 10 being the highest. St. Augustine rated a score of 4 for cost and 10 for customer base; the Airport area rated a score of 6 for cost and 5 for customer base; and the Westside rated a score of 8 for cost and 2 for customer base.__________ 5a. What is the computed mean score for each of the 3 locations?__________ 5b. Which location should be chosen based on the highest score?arrow_forwardThe Spencer Shoe Company manufactures a line of inexpensive shoes in one plant in Pontiac and distributes to five main distribution centers (Milwaukee, Dayton, Cincinnati, Buffalo, and Atlanta) from which the shoes are shipped to retail shoe stores. Distribution costs include freight, handling, and warehousing costs. To meet increased demand, the company has decided to build at least one new plant with a capacity of 40,000 pairs per week. Surveys have narrowed the choice to three locations, Cincinnati, Dayton, and Atlanta. As expected, production costs would be low in the Atlanta plant, but distribution costs are relatively high compared to the other two locations. Other data are as follows. Assume that Spencer Shoe Company will keep operating at Pontiac and build a plant at one of the three new alternatives. Which alternative will lead to the lowest total cost, including production, distribution, and fixed costs, and what is the minimum weekly cost? Distribution costs per pair…arrow_forwardA firm that has recently experienced an enormous growth rate is seeking to lease a small plant in Memphis, TN; Biloxi, MS; or Birmingham, AL. Prepare an economic analysis of the three locations given the following information: Annual costs for building, equipment, and administration would be $40,000 for Memphis, $60,000 for Biloxi, and $100,000 for Birmingham. Labor and materials are expected to be $8 per unit in Memphis, $4 per unit in Biloxi, and $5 per unit in Birmingham. The Memphis location would increase system transportation costs by $50,000 per year, the Biloxi location by $60,000 per year, and the Birmingham location by $25,000 per year. Expected annual volume is 10,000 units.arrow_forward
- A small producer of machine tools wants to move to a larger building, and has identified two alternatives. Location A has annual fixed costs of $160,000 and variable costs of $15,000 per unit; location B has annual fixed costs of $360,000 and variable costs of $14,000 per unit. The finished items sell for $16,000 each. a. At what volume of output would the two locations have the same total cost? Volume of Output ____________unites b.1 For what range of output would location A be superior? (Enter your answer as a whole number. Do not include the indifference point in your answer.) Range of output 0 to ______________ b.2 For what range would B be superior? (Enter your answer as a whole number. Do not include the indifference point in your answer.) Range of output _________________or morearrow_forwardDaniel Tracy, owner of Martin Manufacturing, must expand by building a new factory. The search for a location for this factory has been narrowed to four sites: A, B, C, or D. Thefollowing table shows the results thus far obtained by Tracy by using the factor-rating method to analyze the problem. The scale used for each factor scoring is I through 5. a) Which site should Tracy choose?b) If site D 's score for Energy costs increases from a 3 to a 5, do results change?c) If site A's Weather score is adj usted to a 4, what is the impact? What should Tracy do at this point?arrow_forwardThe city of Belgrade, Serbia, is contemplating building a second airport to relieve congestion at the main airport and is considering two potential sites, X and Y. Hard Rock Hotels would like to purchase land to build a hotel at the new airport. The value of land has been rising in anticipation and is expected to skyrocket once the city decides between sites X and Y. Consequently, Hard Rock would like to purchase land now. Hard Rock will sell the land if the city chooses not to locate the airport nearby. Hard Rock has four choices: (1) buy land at X, (2) buy land at Y, (3) buy land at both X and Y, or (4) do nothing. Hard Rock has collected the following data (which are in millions of euros): X Y Current purchase price 26 22 Profits if airport and hotel built at this site 50 40 Sale price if airport not built at this sit 11…arrow_forward
- The following table shows the fixed cost and variable cost for 3 locations. Construct cost curves for these 3 locations for production from 0 to 200 units at 20 units intervals. What would be the range of production units that would give Location A a competitive advantage? What would be the range for Location B and Location C, respectively?arrow_forwardA location analysis has been narrowed down to two locations, A and B. The main factors in the decision will be supply of raw materials, which has a weight of .50, transportation cost, which has a weight of 0.4, and labour cost, which has a weight of .10. The ratings for raw materials, transportation, and labour are for A-60, 80, and 70, respectively; for B-70, 50, and 90, respectively. Given this information and a minimum acceptable composite score of 75, we can say that the manager should: options: choose location B none of the choices reject both locations choose location A be indifferent between these locationsarrow_forwardLocation A would result in annual fixed costs of $300,000 and variable costs of $55 per unit. Annual fixed costs at Location B are $600,000 with variable costs of $32 per unit. Sales volume is estimated to be 30,000 units per year. Which location has the lower cost at this volume? How large is its cost advantage? At what volume are the two facilities equal in cost?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,