Six processes are to be laid out in six areas along a long corridor at Rita Gibson Accounting Services in Daytona Beach. The distance between adjacent work centers is 40 feet. The number of trips between work centers is given in the following table:
- a. Assign the processes to the work areas in a way that minimizes the total flow, using a method that places processes with highest flow adjacent to each other.
- b. What assignment minimizes the total traffic flow?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The three-station work cell illustrated in Figure $7.7 has a product that must
go through one of the two machines at station 1 (they are parallel) before
proceeding to station 2. What is the bottleneck station of this work cell?
Station 1
Machine A
Capacity: 20 units/hr
Station 2
Station 3
Capacity: 12 units/hr
Station 1
Machine B
Capacity: 5 units/hr
Capacity: 20 units/hr
Figure $7.7
station 1/machine A
station 2/machine B
station 2
station 3
Compare the differences between flow classification and flow scheduling?
A service process is described by the above flowchart. After going through workstation A, an order needs to be processed by one of the three lines, B1-C1-D1, B2-C2-D2, or B3-C3-D3 (in other words, they are substitutable). Finally, all orders need to go through workstation E.
The capacities of the individual workstations are given as follows:
Workstation A has a capacity of 2 orders/hour
Workstation B1, B2, and B3 have the same capacity of 3 orders/hour
Workstation C1, C2, and C3 have the same capacity of 3 orders/hour
Workstation D1, D2, and D3 have the same capacity of 3 orders/hour
Workstation E has a capacity of 4 orders/hour
What is capacity of the service process in orders/hour?
Note: Please do not include the unit of measure. For example, if your answer is 10 orders/hour, enter 10.
Chapter 9 Solutions
Operations Management
Ch. 9 - Prob. 1EDCh. 9 - Prob. 1DQCh. 9 - Prob. 2DQCh. 9 - Prob. 3DQCh. 9 - Prob. 4DQCh. 9 - Prob. 5DQCh. 9 - Prob. 6DQCh. 9 - Prob. 7DQCh. 9 - Prob. 8DQCh. 9 - What are the requirements for a focused work...
Ch. 9 - Prob. 10DQCh. 9 - Prob. 11DQCh. 9 - Prob. 12DQCh. 9 - Prob. 13DQCh. 9 - Prob. 14DQCh. 9 - Prob. 15DQCh. 9 - Prob. 16DQCh. 9 - Explain the concept of cross-docking.Ch. 9 - What is a heuristic? Name several that can be used...Ch. 9 - Prob. 1PCh. 9 - Prob. 2PCh. 9 - Three departmentsmilling (M), drilling (D), and...Ch. 9 - Roy Creasey Enterprises, a machine shop, is...Ch. 9 - Prob. 5PCh. 9 - Prob. 6PCh. 9 - Prob. 7PCh. 9 - Six processes are to be laid out in six areas...Ch. 9 - Stanford Rosenberg Computing wants to establish an...Ch. 9 - Illinois Furniture, Inc., produces all types of...Ch. 9 - Sue Helms Appliances wants to establish an...Ch. 9 - The Action Toy Company has decided to manufacture...Ch. 9 - The following table details the tasks required for...Ch. 9 - Tailwind, Inc., produces high-quality but...Ch. 9 - Prob. 18PCh. 9 - Because of the expected high demand for Mach 10,...Ch. 9 - Prob. 20PCh. 9 - Suppose production requirements in Solved Problem...Ch. 9 - The preinduction physical examination given by the...Ch. 9 - Samuel Smith's company wants to establish an...Ch. 9 - Prob. 8PCh. 9 - Prob. 9PCh. 9 - Prob. 25PCh. 9 - Prob. 26PCh. 9 - Prob. 27PCh. 9 - Prob. 1CSCh. 9 - Prob. 2CSCh. 9 - Prob. 3CSCh. 9 - Prob. 4CSCh. 9 - Prob. 1.1VCCh. 9 - Prob. 1.2VCCh. 9 - Prob. 1.3VCCh. 9 - Prob. 1.4VCCh. 9 - Prob. 1.5VCCh. 9 - Prob. 1.6VCCh. 9 - Prob. 2.1VCCh. 9 - Prob. 2.2VCCh. 9 - Prob. 2.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Twelve tasks, with times and precedence requirements as shown in the following table, are tobe assigned to workstations using a cycle time of 1.5 minutes. Two heuristic rules will be tried:(1) greatest positional weight, and (2) most following tasks.In each case, the tiebreaker will be shortest processing time. TaskLength(minutes)ImmediatePredecessora 0.1 —b 0.2 ac 0.9 bd 0.6 ce 0.1 —f 0.2 d, eg 0.4 fh 0.1 gi 0.2 hj 0.7 ik 0.3 jl 0.2 k a. Draw the precedence diagram for this line.b. Assign tasks to stations under each of the two rules.c. Compute the percentage of idle time for each rulearrow_forwardGiven the following information, assign tasks to work stations using the most followers rule. Assume the cycle time is 60 seconds and the minimum number of workstations is 3. Submit for each workstation (1,2,3,4 etc.), the tasks assigned in order of assignment, the idle time for each work station and the total idle time. (It will help for you to make the diagram but you are not required to submit the diagram) Task A D w Immediate Predecessor D CE Task Time (seconds) 35 50 20 10 25 40arrow_forwardWhat is the theoretical minimum number of workstations using the cycle time computed in” b “ above?arrow_forward
- MGT-314 (Operations Management) MCQ: 1. Tesla is launching a new model of their cars. It is known as the Tesla-model X. Their production facility in Chicago cannot fit the assembly line needed for making the new model. They bought robots, tools, and materials to expand the manufacturing facility. This assembly line is only going to make model-X's and no other models. Their layout is: a) Services Layout b) Product Layout c) Fixed Position Layout d) Process Layout 2. A country is only as strong as its citizens. Due to Bangladesh being a third world country, the crisis is everywhere. With a massive number of people believing in hard work for a minimum wage, these blue-collar employees are having the harshest time surviving this countrywide condition. They simply don't have the means to withstand this situation and that is where the government comes in to aid these people with essentials such as food and equipment (Tran) which will help them to stay afloat from this pandemic. While…arrow_forwardAssign the 4 departments in Table X to locations A, B, C, and D, which are separated by the distances shown in Table y, in such a way that transportation cost is minimized. Use this heuristic: assign departments with the greatest interdepartmental workflow first. See attached tables.arrow_forwardA B1 B2 B3 C1 C2 C3 D1 D2 D3 E A service process is described by the above flowchart. After going through workstation A, an order needs to be processed by one of the three lines, B1-C1-D1, B2-C2-D2, or B3-C3-D3 (in other words, they are substitutable). Finally, all orders need to go through workstation E. The capacities of the individual workstations are given as follows: Workstation A has a capacity of 3 orders/hour • Workstation B1, B2, and B3 have the same capacity of 4 orders/hour • Workstation C1, C2, and C3 have the same capacity of 3 orders/hour • Workstation D1, D2, and D3 have the same capacity of 4 orders/hour • Workstation E has a capacity of 6 orders/hour What is process time of this service process in minutes?arrow_forward
- Sue Helms Appliances wants to establish an assembly line to manufacture its new product, the Micro Popcorn Popper. The goal is to produce five poppers per hour. The tasks, task times, and immediate predecessors for producing one Micro Popcorn Popper are as follows: Task Performance Time (mins) Task Must Follow Task Listed Below A 8 − B 11 A C 10 A, B D 9 B, C E 8 C F 4 D, E A C F B E D In the diagram, there are 6 circles labeled using the letters from A to F. There are 8 of arrows, and each arrow connects one circle to another circle. The arrows are situated in the following manner: A to B, A to C, B to C, C to D, B to D, C to E, D to F, and E to F. Part 2 a) The theoretical minimum number of workstations=55 (round your response up to the…arrow_forwardA group of six jobs is to be processed through a two-machine flow shop. The first operation involves cleaning and the second involves painting. Determine a sequence that willminimize the total completion time for this group of jobs. Processing times are as follows:PROCESSING TIME (hours)Job Work Center 1 Work Center 2A 5 5B 4 3C 8 9D 2 7E 6 8F 12 15 To employ Johnson’s rule, create a “blank” sequence first, such as:mhhe.com/stevenson13eEXAMPLE 41st 2nd 3rd 4th 5th 6tharrow_forwardDennis Geyer's company wishes to assign a set of jobsto a set of machines. The following table provides data as to thecost of each job when performed on a specific machine.a) Determine the assignment of jobs to machines that will minimize Geyer's total cost.b) What is the total cost of your assignments?arrow_forward
- Eight jobs have arrived in the following order: Job Processing Time Due Date 1 25 11 12 9 2 3 4 5 6 7 8 9 5 11 st 4 10 7 16 6 18 16 Find and compare the performance measures for the following sequencing rules using the Excel Sequencing template. Round your answers to two decimal places. A. Process in the order they have arrived 24 42 Average Flow Time Lateness Tardiness Average B. Shortest processing time The SPT sequence is 4, 2, 8, 6, 1, 5, 3, 7 Flow Time Lateness Tardiness Average Earliest due date The EDD sequence is 4, 2, 3, 8, 5, 6, 1, 7 Flow Time Lateness Tardinessarrow_forwardTrue or False? Activity relationships is one of the most critical aspects of designing department layouts within a facility.arrow_forwardAnswer the following problems in Job Sequencing 1. There are five jobs, each of which must go through machines A, B and C in the order ABC. Processing time (in hours) are given below: Job 1 2 4 Machine A 10 11 8 7 6. Machine B 6 4 5 3 Machine C 9 6. 8 Determine the optimal processing sequence and . total elapsed time?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY