Question
Chapter 9, Problem 1P
Summary Introduction
To determine: The weekly total material handling cost of the layout.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existing facility layout are shown in the figures below.
A
B
C
D
−
480
500
50
350
−
175
0
0
0
−
750
0
0
0
−
Figure 2. Existing Layout
A
B
C
D
|——30'——|——30'——|——30'——|
Part 2
a) For the existing layout, the cumulative
"load×distance"
or "movement
cost"=enter your response here
feet (enter your response as a whole number).
Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are:
A
B
C
D
A
−
4
10
8
B
−
−
5
9
C
−
−
−
9
D
−
−
−
−
Workpieces moved per week between work areas are:
A
B
C
D
A
−
900
700
600
B
−
−
400
300
C
−
−
−
600
D
−
−
−
−
It costs Gordon
$3
to move 1 work piece 1 foot.
The weekly total material handling cost of the layout =.......
$nothing
(enter your response as a whole number).
The weekly total material handling cost of the layout =.......
nothing
dollars (enter your response as a whole number).
What are the benefits and drawbacks of a fixed position layout?
Chapter 9 Solutions
Operations Management: Sustainability And Supply Chain Management, Global Edition
Ch. 9 - Prob. 1DQCh. 9 - Prob. 2DQCh. 9 - Prob. 3DQCh. 9 - Prob. 4DQCh. 9 - Prob. 5DQCh. 9 - Prob. 6DQCh. 9 - Prob. 7DQCh. 9 - Prob. 8DQCh. 9 - What are the requirements for a focused work...Ch. 9 - Prob. 10DQ
Ch. 9 - Prob. 11DQCh. 9 - Prob. 12DQCh. 9 - Prob. 13DQCh. 9 - Prob. 14DQCh. 9 - Prob. 15DQCh. 9 - Prob. 16DQCh. 9 - Explain the concept of cross-docking.Ch. 9 - What is a heuristic? Name several that can be used...Ch. 9 - Prob. 1PCh. 9 - Prob. 2PCh. 9 - Three departmentsmilling (M), drilling (D), and...Ch. 9 - Roy Creasey Enterprises, a machine shop, is...Ch. 9 - Prob. 5PCh. 9 - Prob. 6PCh. 9 - Prob. 7PCh. 9 - Prob. 8PCh. 9 - Six processes are to be laid out in six areas...Ch. 9 - After an extensive product analysis using group...Ch. 9 - Stanford Rosenberg Computing wants to establish an...Ch. 9 - Illinois Furniture, Inc., produces all types of...Ch. 9 - Sue Helms Appliances wants to establish an...Ch. 9 - The Action Toy Company has decided to manufacture...Ch. 9 - The following table details the tasks required for...Ch. 9 - Tailwind, Inc., produces high-quality but...Ch. 9 - Prob. 18PCh. 9 - Because of the expected high demand for Mach 10,...Ch. 9 - Prob. 20PCh. 9 - Suppose production requirements in Solved Problem...Ch. 9 - The preinduction physical examination given by the...Ch. 9 - Samuel Smith's company wants to establish an...Ch. 9 - As the Cottrell Bicycle Co. of St. Louis completes...Ch. 9 - Prob. 1CSCh. 9 - Prob. 2CSCh. 9 - Prob. 3CSCh. 9 - Prob. 4CSCh. 9 - Prob. 1.1VCCh. 9 - Prob. 1.2VCCh. 9 - Prob. 1.3VCCh. 9 - Prob. 1.4VCCh. 9 - Prob. 1.5VCCh. 9 - Prob. 1.6VCCh. 9 - Prob. 2.1VCCh. 9 - Prob. 2.2VCCh. 9 - Prob. 2.3VC
Knowledge Booster
Similar questions
- Consider the following tasks, times, and predecessors for an assembly of set-top cable converter boxes: TASK ELEMENT TIME (MINUTES) PRECEDING TASK A 1 — B 1 A C 2 B D 1 B E 3 C, D F 1 A G 1 F H 2 G I 1 E, H Given a cycle time of four minutes, develop two alternative layouts. Use the longest task time rule and the largest number of following tasks as a secondary criterion. What is the highest efficiency of your layout, assuming the 4-minute cycle time? Note: Enter your answer as a percentage rounded to 2 decimal places.arrow_forwardAnswers should have a minimum of 300 words per item. Explain the importance of Process Selection in Facility Layout Briefly describe at least three (3) Facility Layouts, and indicate the kinds of situations in which each would be used.arrow_forwardHow are network layouts characterized?arrow_forward
- Explain what are the two major trends influencing office layout ?arrow_forwardAdam Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existingfaci lity layout are shown in Figure 9.1 9. For example, to move a part from Work Center A to Work Center C is a 60-foot movement distance. It is 90 feet from A to D. a) What is the " load X distance," or "movement cost," of the layout shown?b) Provide an improved layout and compute its movement cost.arrow_forwardTen labs will be assigned to the circular layout shown. Recalling a similar layout’s congestion in the halls, the new lab manager has requested an assignment that will minimize traffic between offices. Department 1 must be at location A. Develop a suitable layout using the following information?arrow_forward
- If a factory is presently running based on Process Layout, which technique would you implement to Improve productivity, supervision and reduce Work in Process? Explain in detail the methodology of transforming the layout.?arrow_forwardWhy are product layouts atypical in service environments?arrow_forwardWhat is layout strategy? Explain the six layout strategies and elaborate on their pros and cons.arrow_forward
- Gator Offi ce Systems is comparing two layouts for thedesign of its offi ce building. It has interviewed managers inorder to develop the from–to matrix shown in Table 10-12. Th etwo layouts considered are shown in Figure 10-14. Which layoutdo you think is better for Gator Offi ce Systems, using the load–distance model?arrow_forwardUsing the precedence diagram on page 2 of this document, we have created four layouts below. Which of these four layouts is NOT valid? The Answer is D but I don't understand why :( Can someone explain the precedence rule and how it works here? tysmmarrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.