Traffic and Highway Engineering - With Mindtap
Traffic and Highway Engineering - With Mindtap
5th Edition
ISBN: 9781305360990
Author: Garber
Publisher: CENGAGE L
Question
Book Icon
Chapter 9, Problem 4P
To determine

The number of lanes required in each direction.

Blurred answer
Students have asked these similar questions
A freeway is to be designed to provide LOS C for the following conditions: design hourly volume of 5600 veh/h; PHF: 0.92; trucks: 6%; free flow speed: 70 mi/h; no lateral obstructions;rolling terrain; total ramp density of 0.75 ramps per mile.Determine: whether eight (four in each direction) 12 ft lanesare enough to provide LOS C.
An existing urban freeway with 4 lanes in each direction has the following characteristics. Traffic data: Peak hour volume (in the peak direction): 7,110 veh/h Trucks: 10% of peak hour volume PHF = 0.93 Geometric data: Lane width: 11 ft Shoulder width: 6 ft Total ramp density: 1.8 ramps per mile Terrain: rolling Determine the LOS in the peak hour. (Assume commuter traffic and assume no RVs.) LOS A LOS B     LOS C LOS D LOS E LOS F Show the demand flow rate (in pc/h/ln), mean speed (in mi/h), and density (in pc/mi/ln) for the given conditions. demand flow rate pc/h/lnmean speed mi/h density pc/mi/ln
An urban freeway is to be designed using the following information. AADT = 52,500 veh/day K (proportion of AADT occurring during the peak hour): D (proportion of peak hour traffic traveling in the peak direction): Trucks: PHF = 0.94 Lane width: Shoulder width: Total ramp density: Terrain: 3 Determine the number of lanes in the peak direction required to provide LOS C. (Assume commuter traffic and assume no RVs.) lanes. 0.12 0.65 8% of peak hour volume demand flow rate 12 ft 10 ft 0.5 interchange/mile; all interchanges are to be cloverleaf interchanges rolling HV' Show all calculations required. (Calculate your answers for the peak direction only. Enter fy, the peak hour volume in veh/h, the free flow speed in mi/h, the demand flow rate in pc/h/In, the mean speed in mi/h, and the density in pc/mi/ln.) fHV peak hour volume 0.893 free flow speed mean speed density 6300 X Your response differs from the correct answer by more than 10%. Double check your calculations. veh/h 1500 X Your…
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning