Given:
Length of the segment is
Sustained grade is
Design volume is
Percentage of trucks is
Percentage of buses is
Percentage of RV's is
Percent hour factor is
Free flow speed is
Right side lateral obstruction is
Design LOS is
Formula used:
Write the expression to calculate the
Here,
Find the number of lanes in each direction using the following relation.
Here,
Calculate the free flow speed by using the formula.
Here,
Write the expression to calculate the speed.
Here,
Write the expression to calculate the density using the formula.
Here,
Calculation:
Refer table 9.26, "PCE's for trucks and buses on upgrades, multilane highways and basic freeway sections".
The value of passenger car equivalent for trucks
The value of passenger car equivalent for recreational vehicles is
Substitute
Consider the driver population factor as
Consider
Substitute
Consider
Substitute
Consider
Substitute
Refer table 9.29, "Adjustment for lane width".
The value of
Refer table 9.30, "Adjustment for right shoulder lateral clearance".
At the right side lateral clearance, the value of reduction in free flow speed
For two lanes the value is
For three lanes the value is
For four lanes the value is
Refer table 9.31, "Adjustment for number of lanes" for the value of
For two lanes the value is
For three lanes the value is
For four lanes the value is
Refer table 9.32, "Adjustment for interchange density" for the value of
The value is
Consider
Substitute
Substitute
Substitute
Refer table 9.33, "Level of service criteria for multilane highways".
The level of service is D.
Consider
Substitute
Substitute
Substitute
Refer table 9.33, "Level of service criteria for multilane highways".
The level of service is C.
Consider
Substitute
Substitute
Substitute
Refer table 9.33, "Level of service criteria for multilane highways".
The level of service is B.
Conclusion:
Therefore, the number of additional lanes required to maintain the level of service B is four.
Want to see more full solutions like this?
Chapter 9 Solutions
Traffic and Highway Engineering - With Mindtap
- 1. An existing urban freeway in rolling terrain is to be analyzed to determine LOS using the following information: Number of lanes in each direction: 3 Peak hour volume: 3500 veh/h (in the peak direction, mainly commuter traffic) 8% trucks 0% recreational vehicles PHF=0.95 Lane width: 11 ft Lateral clearance: 4 ft Average interchange spacing: 1.0 mile Base FFS: 65 mpharrow_forwardSpreadsheet is required) 6. 7. An eigt-lane urban freeway (four lanes in each direction) has -ft lanes, with obstructions 2 ft from the right edge of the pavement and aramps over 6-mi analysis segment. Determine Free Flow Speed (FFS).arrow_forwardA new basic freeway segment will have 3 lanes in each direction. The left and center lane each has a width of 12 ft while the width of the right lane is 13 ft. The left shoulder is 4 ft while the right shoulder is also 4 ft. There are 2 interchanges within 6 miles (3 miles upstream and 3 miles down stream).The site has level terrain, the design speed is 80 mph the hourly design volume is 5250 veh/h, which includes 9.0% trucks and buses. The peak hour factor is 0.870. Calculate FHV, VP, FFS, LOS Show all workarrow_forward
- A long segment of suburban freeway is to be designed on level terrain. The level segment, however, is followed by a 4.5% grade, 2.0 miles in length. If the DDHV is 2,500 vehicles per hour with 15% trucks (standard mix), how many lanes will be needed on the (A.) Upgrade, (B.) Downgrade, (C.) Level terrain segment to provide for level of service C? Lane widths and lateral clearances may be assumed to be 12 feet and 6 feet, respectively. Ramp density is expected to be 1.0 ramps per mile. The PHF is 0.92. Good weather, no incidents, no work zones, and regular users of the facility may be assumed.arrow_forwardA freeway is to be designed to provide LOS C for the following conditions: design hourly volume of 5600 veh/h; PHF: 0.92; trucks: 6%; free flow speed: 70 mi/h; no lateral obstructions;rolling terrain; total ramp density of 0.75 ramps per mile.Determine: whether eight (four in each direction) 12 ft lanesare enough to provide LOS C.arrow_forwardA particular roadway segment has a 6000-ft section of 3% upgrade, followed by a 5000-ft section of 5% upgrade. The traffic on the road includes 8% trucks and 4% recreational vehicles. Determine the PCEs.arrow_forward
- A four-lane rural freeway segment has a 510 m grade length of 2% upgrade followed by a 630 m grade length of 3%. The freeway has 3.4-m lane, 1.5m left-shoulder lateral clearances and interchanges spaced at every 25 km. During the peak hour, there are 6% trucks, 2% buses, 2% recreational vehicles and the rest are passenger cars. Driver population adjustment is determined to be 0.90, peak hour factor is 0.90 and the BFFS is 110 km/h. At present, the freeway operates at capacity during the peak hour in the direction in question. If an additional 3.4 m lane is introduced, and all other factors stay the same, what will be the new level of service?arrow_forwardCivil Engineering A four-lane rural freeway segment has a 510 m grade length of 2% upgrade followed by a 630 m grade length of 3%. The freeway has 3.4-m lane, 1.5m left-shoulder lateral clearances and interchanges spaced at every 25 km. During the peak hour, there are 6% trucks, 2% buses, 2% recreational vehicles and the rest are passenger cars. Driver population adjustment is determined to be 0.90, peak hour factor is 0.90 and the BFFS is 110 km/h. At present, the freeway operates at capacity during the peak hour in the direction in question. If an additional 3.4 m lane is introduced, and all other factors stay the same, what will be the new level of service?arrow_forwardFind the service flow rate and service volume rate for an 8-lane-one direction urban freeway at level of service (A) with the following: 11-ft lane, 0-ft lane clearance, 2-per mile interchange density and 5% truck. The section is 4% upgrade for 1 mile. Use PHF = 0.85.arrow_forward
- Given: 4-lane urban freeway; Interchange density 1.5/mile; Directional peak flow = 1950 veh/hr; 5% trucks; PHF = 0.90; 11 ft lanes; obstructions 4ft from right edge; Rolling terrain.Determine (a) LOS, and; (b) how much additional traffic could be accommodated before reaching capacity?arrow_forwardQUESTION 1 A four-lane urban freeway segment has a peak demand volume of 3,500 vehicles per hour for the two eastbound lanes. The PHF is 0.95 and there are no trucks, buses or RVs because the freeway is classified as a parkway and such vehicles are prohibited. The segment has 12 ft lanes, no lateral obstructions, 3 ramps within the influence area, and meanders through some beautiful rolling terrain. Assuming the road will be used by commuters and those familiar with the road, what is the flow rate (pcphpl)? Provide your answer to the nearest integer.arrow_forwardA Class II two-lane highway needs to be redesigned for an area with rolling terrain. During the peak hour, 380 vehicles are traveling in the analysis direction and 300 vehicles are traveling in the opposing direction. The PHF is 0.92. The traffic stream includes 8% large trucks, 2% buses, and no recreational vehicles. What is the maximum percentage of no-passing zones that can be built into the design with LOS C maintained?arrow_forward
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning