Concept explainers
a)
To determine: Optimal solution and total cost using northwest-corner method.
Introduction: The major objective of the transportation problem is to minimize the distributing cost of a product from a source to an origin. Transportation problem is one of the type of linear programming.
b)
To determine: Optimal solution and total cost using intuitive lowest-cost starting method.
Introduction: The major objective of the transportation problem is to minimize the distributing cost of a product from a source to an origin. Transportation problem is one of the type of linear programming.
c)
To determine: Optimal solution and total cost using stepping stone method.
Introduction: The major objective of the transportation problem is to minimize the distributing cost of a product from a source to an origin. Transportation problem is one of the type of linear programming.
Want to see the full answer?
Check out a sample textbook solutionChapter C Solutions
EBK OPERATIONS MANAGEMENT
- Question: B) Identify The Economic Order Quanitity And Consider The Implications For Making An Error In Calculating Economic Order Quanitity. This problem has been solved! See the answer b) Identify the economic order quanitity and consider the implications for making an error in calculating economic order quanitity.arrow_forwardQUESTION SIX (a) Suppose that a decision is faced with three decision alternatives and four states of nature. The following profit payoff table is constructed: Alternatives State of Nature 1S 2 S 3 S 4 S 1Α 2Α 3Α 18 15 13 12 14 16 15 10 19 8 11 15 Assuming that the decision maker has no knowledge about the probabilities of occurrence of the four states of nature, find the decisions to be recommended under each of the following criteria: iii. Minimax Reject criterion iv. Hurwicz criterion with 0.6 α =arrow_forwardQuestion 1 1.A person who has graduated from an engineering program at an accredited university, but has notobtain a registration/license under Board of Engineer Malaysia (BEM) to practice engineering:A. must follow the code of ethics of a technical society, if the person practises engineeringB. must not practise engineering, except under the supervision of a licensed engineer.C. must follow the code of ethics, if the person practises engineeringD. must not practise engineering2. Which of the following activities is an offense for a person who is not registered/licensed undertheprofessional engineering Act in Malaysia:A. Practising professional engineering.B. Using the Professional Engineer (PE) title.C. Using a term or title to give the belief that the person is licensed.D. All of the above3. Codes of ethics mention the engineer’s duties to society, to employers, to clients, to colleagues, tosubordinates, and to the profession. However, when these duties conflict, which group should…arrow_forward
- Question 9 ADM Security Consultants is a small security service company, whose specialty is providing security on a short term basis for single events such as concerts. The company has an offsite technical team of operators that back up the security personnel that are onsite The following table shows the staffing requirements of the technical team on each day of the week. These operators work long hours and management.wishes to create a staffing schedule that ensures each operator gets two consecutive days off. Schedule each operator, guaranteeing two consecutive days off MO TUE WED THUR FRI SAT SUN Requirement 2. 4. 2arrow_forwardQuestion 4An investor is to purchase one of three types of real estate, as illustrated in Figure below. Theinvestor must decide among an apartment building, an office building, and a warehouse. Thefuture states of nature that will determine how much profit the investor will make are goodeconomic conditions and poor economic conditions. The profits that will result from eachdecision in the event of each state of nature are shown in Table below: a) Find the optimal act using Maxi-Max criteriab) Find the optimal act using Mini-Max criteria c) Find the optimal act using Maxi-Min criteria d) Find the optimal act using Min-Max regret tablearrow_forwardQUESTION THREE A) Use the simplex method to solve the following LP problem. Maximize Z = 3x, + 5x, + 4x, subiect to the constraints 2x, + 3x, < 8 2x, + 5x, < 10 3x, + 2x, + 4x3 S 15 B)Find the solution using two-phase method Minimize Z =x, + 2x, + 3x3 - x4 Subject to the constraints 5x, + 7x, +4x 57 -4x, +7x, + 5x, 2 -2 3x, + 4x, + 6x, 2 29/, CIWrite the dual ofthe following LP problem Maximize Z = x, + 2x, + 3x3 Subject to the constraints X1 + x2 + x3S 10 2x, - x2 - x3 < 2 2x, - 2x, - 3x, S6arrow_forward
- Question 3 A research collaboration can be enhanced by: Limiting the communication between researchers and industry partners. Avoiding the issue of which journal to target since research team members might disagree. Discussing intellectual property issues while the collaboration is forming. Waiting to discuss authorship issues until after data collection. Question 4 In any collaboration, data ownership is typically determined by: The research team with access to the best lawyers. The individual who does the most work on the project. The type and source of funds used to support the project. The relevant department chairs.arrow_forwardQ/Choose a suitable question for each of the following answers. 1-Harry works for an international company in Dallas. * Where Harry is working and in which place? For what company Harry does work and where? For what and where does Harry work ? Does Harry work in an international company in Dallas?arrow_forwardQuestion 27 Variable cells Final Reduced Objective Allowable Allowable Value Cost Coefficient Increase Decrease Cell Name $B$6 Activity 1 0 425 500 1E+30 425 $C$6 Activity 2 27.5 0.0 300 500 300 $D$6 Activity 3 0 250 400 1E+30 250 Constraints Final Shadow Constraint Allowable Allowable Value Price R.H. Side Increase Decrease Cell Name $E$2 Benefit A 110 0 60 50 1E+30 $E$3 Benefit B 110 75 110 1E+30 46 $E$4 Benefit C 137.5 0 80 57.5 1E+30 If the coefficient for Activity 2 in the objective function changes to $400, then the objective function value: A) will increase by $100. B) will increase by $7,500. OC) will remain the same. D) will increase by $2,750.arrow_forward
- Question for reference: For the linear program Max 2A + 3Bs.t. 1A+2B <= 6 5A+3B <= 15 A, B >= 0 find the optimal solution using the graphical solution procedure. What is the value of the objective function at the optimal solution? **See image for answer to the above question** Required: Please explain & show the algebra/working for the determination of the corner points A =12/7 and B =15/7.arrow_forwardQuestion 1 Given the following payoff table with the profits ($m), a firm might expect alternative investments (A, B, C) under different levels of interest rate. payoffs as profits states of nature decision alternatives 1(5%) 2(7%) 3(9%) A 14 22 6 B 19 18 11 C 12 17 15 a. Use the alternative method to verify EVPI NOW ASSUME THAT THE PAYOFFS ARE COSTS ANSWER THE FOLLOWING: b. What is the most the firm should be willing to pay to obtain further (perfect) information (EVPI)? c. Use the alternative method to verify EVPI. Please answer all three parts of Question 1.arrow_forward9 Question 6, Problem 9.2 Part 1 of 4 K A Missouri job shop has four departments-machining (M), dipping in a chemical bath (D), finishing (F), and plating (P)-assigned to four work areas. The operations manager, Mary Marrs, has gathered the following data for the movement of material. The number of workpieces moved yearly between work areas are M D F P M M D F P M D 600 It costs $0.50 to move 1 workpiece 1 foot in the job shop. For the layout design of the job shop, Mary has the current layout (Plan A) and two proposals (Plan B and Plan C) a) LAYOUT PLAN A Distance between work areas (departments) in feet 14 F 2,000 400 D 22 P 300 200 2,000 F 13 6 P 9 11 3 Save The yearly total material handling cost of the current layout presented in PLAN A = S whole number). Clear all (enter your response as a Check answer im- ad sts of 100 st 60 catiarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.