A
Summary Introduction
Interpretation:the objective function and constraints for maximize the contribution to profits and overheads.
Concept Introduction:Objective functions are the linear functions and the equalities and inequalities are the constraints.
B
Summary Introduction
Interpretation: using the computer package, the interpretation is to be solved
Concept Introduction: Objective functions are the linear functions and the equalities and inequalities are the constraints.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Winkler Furniture manufactures two different types of china cabinets: a French Provincial model and a Danish Modern model. Each cabinet produced must go through three departments: carpentry, painting, and finishing. The table on this page contains all relevant information concerning production times per cabinet produced and production capacities for each operation per day, along with net revenue per unit produced. The firm has a contract with an Indiana distributor to produce a minimum of 300 of each cabinet per week (or 60 cabinets per day). Owner Bob Winkler would like to determine a product mix to maximize his daily revenue.Use Solver to solve the problem. You need to have one Excel sheet with the problem setup and another sheet with Solver solution
An Insurance Company is introducing two new product lines: special risk insuranceand mortgages. The expected profit is $5 per unit on special risk insurance and $2 per unit onmortgages. Management wishes to establish sales quotas for the new product lines tomaximize total expected profit. Please see figure for work requirements(a) Formulate a linear programming model for this problem.
Please use excel for this problem
A furniture manufacturer produces two types of tables – country and contemporary – using three types of machines. The time required to produce the tables on each machine is given in the following table:
Machine
Country
Contemporary
Total Machine Time
Available Per Week
Router
3.5
4.0
1,000
Sander
4.5
6.5
2,000
Polisher
3.0
2.0
1,500
Country tables sell for $395 and contemporary tables sell for $515. Management has determined that at least 25% of the tables made should be country and at least 38% should be contemporary. How many of each type of table should the company manufacture if it wants to maximize its revenue?
Formulate an LP model for this problem
Create the spreadsheet model and use Solver to solve the problem.
Chapter D Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- The Midland Tool Shop has four heavy presses it uses to stamp out prefabricated metal covers and housings for electric consumer products. All four presses operate differently and are of different sizes. Currently the firm has a contract to produce three products. The contract calls for 400 units of product A, 570 units of product B, and 320 units of product C. The time (in minutes) required for each product to be produced on each machine is as follows: Machine Product 1 2 3 4 A 35 41 34 39 B 40 36 32 43 C 38 37 33 40 Machine 1 is available for 150 hours, machine 2 for 240 hours, machine 3 for 200 hours, and machine 4 for 250 hours. The products also result in different profits, according to the machine they are produced on, because of time, waste, and operating cost. The profit per unit per machine for each product is summarized as follows: Machine Product 1 2 3…arrow_forwardTaco Loco Taco Loco is considering a new addition to their menu. They have test marketed a number of possibilities and narrowed them down to three new products, X, Y, and Z. Each of these products is made from a different combination of beef, beans, and cheese, and each product has a price point. Taco Loco feels they can sell an X for $17, a Y for $13, and a Z for $14. The company's management science consultant formulates the following linear programming model for company management. Max R = 14Z + 13Y + 17X subject to:Beef 2Z + 3Y + 4X ≤ 28 Cheese 9Z + 8Y + 11X ≤ 80 Beans 4Z + 4Y + 2X ≤ 68 X,Y,Z ≥ 0 The sensitivity report from the computer modelis attached onto the image. 3-1) The local cheese vendor offers to sell Taco Loco 200 pounds of cheese for these three products. Taco Loco should:A) refuse to buy any cheese.B) buy less than 80 pounds of cheese for $1.45 per pound. C) buy 46 pounds or less of cheese for $1.45 or less. D) buy at least 126 pounds of cheese for $5.33 or less.…arrow_forwardAn electronics manufacturing company has three production plants, each of which produces three different models of a particular MP3 player. The daily capacities (in thousands of units) of the three plants are shown in the table. Basic model Gold model Platinum model Plant 1 8 4 8 Plant 2 6 6 3 Plant 3 12 4 8 The total demands are 300,000 units of the Basic model, 172,000 units of the Gold model, and 249,500 units of the Platinum model. The daily operating costs are $50,000 for plant 1, $60,000 for plant 2, and $60,000 for plant 3. How many days should each plant be operated in order to fill the total demand while keeping the operating cost at a minimum? What is the minimum cost? Use the method of the dual.arrow_forward
- Par, Inc., produces a standard golf bag and a deluxe golf bag on a weekly basis. Each golf bag requires time for cutting and dyeing and time for sewing and finishing, as shown in the following table: Hours Required per Bag Product Cutting and Dyeing Sewing and Finishing Standard Bag 1/2 1 Deluxe Bag 1 2/3 The profits per bag and weekly hours available for cutting and dyeing and for sewing and finishing are as follows: Product Profit per Unit ($) Standard Bag $15 Deluxe Bag $8 Activity Weekly Hours Available Cutting and Dyeing 300 Sewing and Finishing 360 Par Inc. will sell whatever quantities it produces of these two products. The aim of the objective function for Par Inc., should be to maximize the objective value. The optimum solution is: Number of standard bags produced per week = 360 (enter your response as a whole number). Number of deluxe bags produced per week =____ (enter…arrow_forwardABC is a small manufacturer of two types of popular all-terrain snow skis, the J and the D models. The manufacturing process consists of two principal departments: fabrication and finishing. The fabrication department has 12 skilled workers, each of whom works 7 hours per day. The finishing department has 3 workers, who also work a 7-hour shift. Each pair of J skis require 3.5 labor-hours in the fabricating department and 1 labor-hour in finishing. The D model requires 4 labor-hours in fabricating and 1.5 labor-hours in finishing. The company operates 5 days a week. ABC makes a net profit of $50 on the J model and $65 on the D model. In anticipation of the next ski-sale season, ABC must plan its production of these two models. Because of the popularity of its products and limited production capacity, its products are in high demand, and ABC can sell all it can produce each season. The company anticipates selling at least twice as many D as J models. Determine how many of each model…arrow_forwardWeenies is a food processing plant which manufactures hot dogs and hot dog buns. They grind their own flour for the hot dog buns at a maximum rate of 200 pounds per week. Each hot dog bun requires 0.1 pound of flour. They currently have a contract with Pigland, Inc., which specifies that a delivery of 800 pounds of pork product is delivered every Monday. Each hot dog requires ¼ pound of port product. All the other ingredients in the hot dogs and hot dog buns are in plentiful supply. Finally, the labor force at Weenies consists of 5 employees working full time (40 hours per week each). Each hot dog requires 3 minutes of labor, and each hot dog bun requires 2 minutes of labor. Each hot dog yields a profit of $0.40, and each bun yields a profit of $0.20. Weenies would like to know how many hot dogs and how many hot dog buns they should produce each week so as to achieve the highest possible profit. A. Identify verbally the decisions to be made, the constraints on the decisions, and the…arrow_forward
- Weenies is a food processing plant which manufactures hot dogs and hot dog buns. They grind their own flour for the hot dog buns at a maximum rate of 200 pounds per week. Each hot dog bun requires 0.1 pound of flour. They currently have a contract with Pigland, Inc., which specifies that a delivery of 800 pounds of pork product is delivered every Monday. Each hot dog requires ¼ pound of port product. All the other ingredients in the hot dogs and hot dog buns are in plentiful supply. Finally, the labor force at Weenies consists of 5 employees working full time (40 hours per week each). Each hot dog requires 3 minutes of labor, and each hot dog bun requires 2 minutes of labor. Each hot dog yields a profit of $0.40, and each bun yields a profit of $0.20. Weenies would like to know how many hot dogs and how many hot dog buns they should produce each week so as to achieve the highest possible profit. A. Identify verbally the decisions to be made, the constraints on the decisions, and the…arrow_forwardIrwin Textile Mills produces two types of cotton cloth – denim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such as, requires 8 pounds of raw cotton per yard, whereas denim requires 5.5 pounds of raw cotton per yard. A yard of corduroy requires 3.6 hours of processing time; a yard of denim requires 8 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroy is 600 yards per month. The manufacturer has 6,500 pounds of cotton and 3,000 hours of processing time available each month. The manufacturer makes a profit of $3.0 per yard of denim and $4.0 per yard of corduroy. The manufacturer wants to know how many yards of each type of cloth to produce to maximize profit. How much extra cotton, processing time, and the demand for corduroy are left over at the optimal solution after formulating a linear programming model? What is the effect on the optimal solution if the profit per yard of denim is increased from$3.0 to $4.0?arrow_forwardIrwin Textile Mills produces two types of cotton cloth – denim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such as, requires 8 pounds of raw cotton per yard, whereas denim requires 5.5 pounds of raw cotton per yard. A yard of corduroy requires 3.6 hours of processing time; a yard of denim requires 8 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroy is 600 yards per month. The manufacturer has 6,500 pounds of cotton and 3,000 hours of processing time available each month. The manufacturer makes a profit of $3.0 per yard of denim and $4.0 per yard of corduroy. The manufacturer wants to know how many yards of each type of cloth to produce to maximize profit. Formulate a linear programming model for this problem. Solve the problem by using thearrow_forward
- Irwin Textile Mills produces two types of cotton cloth – denim and corduroy. Corduroy is a heavier grade of cotton cloth and, as such as, requires 8 pounds of raw cotton per yard, whereas denim requires 5.5 pounds of raw cotton per yard. A yard of corduroy requires 3.6 hours of processing time; a yard of denim requires 8 hours. Although the demand for denim is practically unlimited, the maximum demand for corduroy is 600 yards per month. The manufacturer has 6,500 pounds of cotton and 3,000 hours of processing time available each month. The manufacturer makes a profit of $3.0 per yard of denim and $4.0 per yard of corduroy. The manufacturer wants to know how many yards of each type of cloth to produce to maximize profit. Formulate a linear programming model for this problem. Solve the problem by using excel / the computerarrow_forwardPar, Inc., produces a standard golf bag and a deluxe golf bag on a weekly basis. Each golf bag requires time for cutting and dyeing and time for sewing and finishing, as shown in the following table: Hours Required per Bag Product Cutting and Dyeing Sewing and Finishing Standard Bag 1/2 1 Deluxe Bag 1 2/3 The profits per bag and weekly hours available for cutting and dyeing and for sewing and finishing are as follows: Product Profit per Unit ($) Standard Bag $5 Deluxe Bag $8 Activity Weekly Hours Available Cutting and Dyeing 270 Sewing and Finishing 360 Par Inc., will sell whatever quantities it produces of these two products. The aim of the objective function for Par Inc., should be to ▼ Maximize Minimize Par, Inc., produces a standard golf bag and a deluxe golf bag on a weekly basis. Each golf bag requires time for cutting and dyeing and time for sewing and finishing, as shown in the…arrow_forwardA refinery manufactures two grades of jet fuel, Fl and F2, by blending four types of gasoline, A. B, C, and D. Fuel Fl uses gasolines A. B. C, and D in the ratio 1:1:2:4, and fucl F2 uses the ratio 2:2:1:3. The supply limits for A, B.C, and D are 1000, 1200, 900, and 1500 bbl/day, respectively. The costs per bbl for gasolines A, B, C, and D are $120, $90, $100, and $150, respectively. Fucls Fl and F2 sell for $200 and $250 per bbl, respectively. The minimum demand for F1 and F2 is 200 and 400 bbl/day, respectively. Develop an LP model to determine the optimal production mix for F1 and F2,arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,