Concept explainers
A
Interpretation: A linear program defining the production mix that contributes to the maximization of contribution margin should be determined.
Concept Introduction: Presently, the firm is designing its product mix through prioritizing the products based on their contribution margin per unit, from the highest.
B
Interpretation: A solution to the given data and information using a computer package like POM for Windows should be provided.
Concept Introduction: Presently, the firm is designing its product mix through prioritizing the products based on their contribution margin per unit, from the highest.
C
Interpretation: The machine that will be bottleneck should be determined.
Concept Introduction: Presently, the firm is designing its product mix through prioritizing the products based on their contribution margin per unit, from the highest.
D
Interpretation: The changes in the solution from part B should be determined based on the proposed condition.
Concept Introduction: Presently, the firm is designing its product mix through prioritizing the products based on their contribution margin per unit, from the highest.
Want to see the full answer?
Check out a sample textbook solutionChapter D Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
- A Garment Company manufactures blue jeans. Three designs are considered: A, B, and C. The manufacture of design A requires 5 minutes machine time, 20 minutes labor and costs P325. Design B requires 8 minutes machine time, 30 minutes labor and costs P350 to produce. Finally, design C, the top of the line requires 10 minutes machine time, 1 labor hour, and costs P425 to produce. Brand A sells for P650, brand B for P750, and brand C for P875. The company works on a weekly schedule of five days, with two shifts of 7.5 hours (net time) each. It has six machines available for production and 36 workers on each shift. Its weekly manufacturing budget is P1,750,000. Based on previous demand, they can sell at least 500 units of design B and minimum of 200 units of brand C. Formulate the complete LP model.arrow_forwardPrimer Inc. offers plumbing and air conditioning services to customers in Kumasi, Ghana. The company’s product strategy is to solve the customer’s problem irrespective of what it takes, at the time the customer needs it solved. The company provides same day service for customers, and the aim is to make the customer happy before leaving.The services of the company are available 24 hours a day, 7 days a week for customers. There is no extra charge for requests made on holidays, odd hours of the day, or in festive seasons. The company aims to be available at the call of customers without charging a pesewa extra, even at times when rival firms won’t get out of bed.The company fixes the price of the service before it begins, and customers can be assured of no extra charges. Irrespective of the customer’s location in the city, Primer Inc. does not charge additional fees for transportation. For all services, the company provides a one year guarantee on all parts and labour used, whiles rival…arrow_forwardPrimer Inc. offers plumbing and air conditioning services to customers in Kumasi, Ghana. The company’s product strategy is to solve the customer’s problem irrespective of what it takes, at the time the customer needs it solved. The company provides same day service for customers, and the aim is to make the customer happy before leaving. The services of the company are available 24 hours a day, 7 days a week for customers. There is no extra charge for requests made on holidays, odd hours of the day, or in festive seasons. The company aims to be available at the call of customers without charging a pesewa extra, even at times when rival firms won’t get out of bed. The company fixes the price of the service before it begins, and customers can be assured of no extra charges. Irrespective of the customer’s location in the city, Primer Inc. does not charge additional fees for transportation. For all services, the company provides a one year guarantee on all parts and labour used, whiles…arrow_forward
- Primer Inc. offers plumbing and air conditioning services to customers in Kumasi, Ghana. The company’s product strategy is to solve the customer’s problem irrespective of what it takes, at the time the customer needs it solved. The company provides same day service for customers, and the aim is to make the customer happy before leaving. The services of the company are available 24 hours a day, 7 days a week for customers. There is no extra charge for requests made on holidays, odd hours of the day, or in festive seasons. The company aims to be available at the call of customers without charging a pesewa extra, even at times when rival firms won’t get out of bed. The company fixes the price of the service before it begins, and customers can be assured of no extra charges. Irrespective of the customer’s location in the city, Primer Inc. does not charge additional fees for transportation. For all services, the company provides a one year guarantee on all parts and Labour used, whiles…arrow_forwardPrimer Inc. offers plumbing and air conditioning services to customers in Kumasi, Ghana. The company’s product strategy is to solve the customer’s problem irrespective of what it takes, at the time the customer needs it solved. The company provides same day service for customers, and the aim is to make the customer happy before leaving. The services of the company are available 24 hours a day, 7 days a week for customers. There is no extra charge for requests made on holidays, odd hours of the day, or in festive seasons. The company aims to be available at the call of customers without charging a pesewa extra, even at times when rival firms won’t get out of bed. The company fixes the price of the service before it begins, and customers can be assured of no extra charges. Irrespective of the customer’s location in the city, Primer Inc. does not charge additional fees for transportation. For all services, the company provides a one year guarantee on all parts and labour used, whiles…arrow_forwardPrimer Inc. offers plumbing and air conditioning services to customers in Kumasi, Ghana. The company’s product strategy is to solve the customer’s problem irrespective of what it takes, at the time the customer needs it solved. The company provides same day service for customers, and the aim is to make the customer happy before leaving. The services of the company are available 24 hours a day, 7 days a week for customers. There is no extra charge for requests made on holidays, odd hours of the day, or in festive seasons. The company aims to be available at the call of customers without charging a pesewa extra, even at times when rival firms won’t get out of bed. The company fixes the price of the service before it begins, and customers can be assured of no extra charges. Irrespective of the customer’s location in the city, Primer Inc. does not charge additional fees for transportation. For all services, the company provides a one year guarantee on all parts and labour used, whiles…arrow_forward
- Note: Setup the Product Mix example below in excel and find the optimal solution using solver. Briefly describe your solution A Production-Mix Problem Failsafe Electronics Corporation primarily manufactures four highly technical products, which it supplies to aerospace firms that hold NASA contracts. Each of the products must pass through the following departments before they are shipped: wiring, drilling, assembly, and inspection. The time requirements in each department (in hours) for each unit produced and its corresponding profit value are summarized in this table: (info added in first attached image) The production time available in each department each month and the minimum monthly production requirement to fulfill contracts are as follows: (info added in second attached image) Question Formulate this production-mix situation as an LP problem. The production manager first specifies production levels for each product for the coming month. He lets: X.1 = number of units of…arrow_forwardTHE PRIMER INC. Primer Inc. offers plumbing and air conditioning services to customers in Kumasi, Ghana. The company’s product strategy is to solve the customer’s problem irrespective of what it takes, at the time the customer needs it solved. The company provides same day service for customers, and the aim is to make the customer happy before leaving. The services of the company are available 24 hours a day, 7 days a week for customers. There is no extra charge for requests made on holidays, odd hours of the day, or in festive seasons. The company aims to be available at the call of customers without charging a pesewa extra, even at times when rival firms won’t get out of bed. The company fixes the price of the service before it begins, and customers can be assured of no extra charges. Irrespective of the customer’s location in the city, Primer Inc. does not charge additional fees for transportation. For all services, the company provides a one year guarantee on all parts and labour…arrow_forwardAnswer the 3 subparts in 2 sentences each. For each of the following scenarios, please identify the most appropriate Operations Research model. RPI is facilitating a mentorship program and wants to assign undergraduate students with graduate student mentors. There are more undergraduate students than graduate students; therefore, each graduate student can be assigned at most 3 undergraduate student mentees. The goal is to maximize assignment satisfaction. The children’s game Snakes and Ladders is played in a sequential fashion. If a player is on a given square, the player can move to a different square based on selecting a card. This is a game of chance and there is no strategy in the game. The goal is predict who will win the game given the current location of both players. The US government wants to connect all major US cities with high-speed internet lines, which requires laying lines below ground. The US government wants to use the least amount of high-speed lines to connect…arrow_forward
- Answer the 3 subparts in 2 sentences each. For each of the following scenarios, please identify the most appropriate Operations Research model. RPI is facilitating a mentorship program and wants to assign undergraduate students with graduate student mentors. There are more undergraduate students than graduate students; therefore, each graduate student can be assigned at most 3 undergraduate student mentees. The goal is to maximize assignment satisfaction. The children’s game Snakes and Ladders is played in a sequential fashion. If a player is on a given square, the player can move to a different square based on selecting a card. This is a game of chance and there is no strategy in the game. The goal is predict who will win the game given the current location of both players. The US government wants to connect all major US cities with high-speed internet lines, which requires laying lines below ground. The US government wants to use the least amount of high-speed lines to connect…arrow_forwardZucchero Sugar, Inc. has six processing departments for refining sugar—Affination, Carbonation, Decolorization, Boiling, Recovery, and Packaging. Conversion costs are added evenly throughout each process. Data from the month of August for the Recovery Department are as follows: Metric Tons Beginning Work−in−Process Inventory 0 Transferred in 22,000 Ending Work−in−Process Inventory 6,000 Costs Beginning Work−in−Process Inventory $0 Costs added during August : Direct materials 530,000 Direct labor 250,000 Manufacturing overhead 105,000 Total costs added during August $885,000 The ending Work−in−Process Inventory is 100% and 95% complete with respect to direct materials and conversion costs, respectively. The weighted−average method is used. How many metric tons of sugar were refined and transferred to the Packaging Department in August? A. 6,000 metric tons B.…arrow_forwardA garden store prepares various grades of pine bark for mulch: nuggets (x1), mini-nuggets (x2),and chips (x3). The process requires pine bark, machine time, labor time, and storage space. Thefollowing model has been developed.Maximize Z = 9 x1 + 9x2 + 6x3 (profit)Subject toBark 5x1 + 6x2 + 3x3 ≤ 600 pounds Machine 2x1 + 4x2 + 5x3 ≤ 600 minutesLabor 2x1 + 4x2 + 3x3 ≤ 480 hoursStorage 1x1 + 1x2 + 1x3 ≤ 150 bags x1, x2, x3 ≥ 0 a. What is the marginal value of a pound of pine bark? Over what range is this price valueappropriate?b. What is the maximum price the store would be justified in paying for additional pine bark?c. What is the marginal value of labor? Over what range is this value in effect?d. The manager obtained additional machine time through better scheduling. How much additional machine time can be effectively used for this operation? Why?e. If the manager can obtain either additional pine bark or additional storage space, which oneshould she choose and how much (assuming…arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,