
Identify if the given linear programming problem is a standard maximization problem. If it is a standard maximization problem, then express the constraints as slack variable equations, write the objective function in standard form, and set up the initial simplex tableau. If it is not a standard maximization problem, then explain all the reasons why it is not and type NA (or Not Applicable) in the remaining boxes.
Minimize: Z=24x+30y+18z
subject to: x+7y-4z≤150
5x+9y+2x≤435
8x-3y+16z≥345
x≥0, y≥0, z≥0
Standard Max Answer Here, Yes or No with reasons (Keyboard only):
Slack Variable Equations Here: (enter NA if it is not a standard maximization problem)
Objective Function in Standard Form Here: (enter NA if it is not a standard maximization problem)
Initial Simplex Tableau Here: (enter NA if it is not a standard maximization problem)

Trending nowThis is a popular solution!
Step by stepSolved in 2 steps

- Hugh and his partners grow tomatoes exclusively. Although they grow many varieties, tomatoes are all that they produce for leading supermarket chains in the UK. Should they diversify into related products such as lettuce? Write a summary report, focusing on the objective function, constraints, and decision variables that are used for Linear Programming. L for box for lettuce T for box of tomatoarrow_forwardUse Excel to solve the linear programming problem.At one of its factories, a manufacturer of televisions makes one or more of four models of HD units (without cases): a 20-in. LCD, a 42-in. LCD, a 42-in. plasma, and a 50-in. plasma. The assembly and testing time requirements for each model are shown in the table, together with the maximum amounts of time available per week for assembly and testing. In addition to these constraints, the supplier of cases indicated that it would supply no more than 290 cases per week and that of these, no more than 40 could be for the 20-in. LCD model.Use the profit for each television shown in the table to find the number of completed models of each type that should be produced to obtain the maximum profit for the week. Find the maximum profit. 20-in. LCD sets 42-in. LCD sets 42-in. plasma sets 50-in. plasma sets profit $ 20-in.LCD 42-in.LCD 42-in.Plasma 50-in.Plasma TotalAvailable Assembly time…arrow_forwardFormulate but do not solve the following exercise as a linear programming problem.A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It has been determined that the company will realize a profit of $3 on each unit of Product A and $5 on each unit of Product B. To manufacture a unit of Product A requires 5 min on Machine I and 5 min on Machine II. To manufacture a unit of Product B requires 9 min on Machine I and 5 min on Machine II. There are 269 min available on Machine I and 205 min available on Machine II in each work shift. How many units of a product should be produced in each shift to maximize the company's profit P in dollars? Maximize P = subject to the constraints Machine I Machine II x ≥ 0 y ≥ 0arrow_forward
- Formulate but do not solve the following exercise as a linear programming problem. A nutritionist at the Medical Center has been asked to prepare a special diet for certain patients. She has decided that the meals are to be prepared from Foods A and B and that the meals should contain a minimum of 390 mg of calcium, 10 mg of iron, and 40 mg of vitamin C. Each ounce of Food A contains 25 mg of calcium, 2.5 mg of iron, 2 mg of vitamin C, and 6 mg of cholesterol. Each ounce of Food B contains 25 mg of calcium, 0.5 mg of iron, 5 mg of vitamin C, and 5 mg of cholesterol. How many ounces of each type of food should be used in a meal so that the cholesterol content C (in mg) is minimized and the minimum requirements of calcium, iron, and vitamin C are met? Minimize C = subject to the constraints calcium iron vitamin C x ≥ 0 y ≥ 0arrow_forwardThe supplies, demands, and transportation costs per unit are shown on the network. (a)Develop a linear programming model for this problem; be sure to define the variables in your model. Let x11 = amount shipped from Jefferson City to Des Moines x12 = amount shipped from Jefferson City to Kansas City x13 = amount shipped from Jefferson City to St. Louis x21 = amount shipped from Omaha to Des Moines x22 = amount shipped from Omaha to Kansas City x23 = amount shipped from Omaha to St. Louis Min ???????? s.t. From Jefferson City ?????? From Omaha ??????? To Des Moines ??????? To Kansas City ???????? To St. Louis ???????????? x11, x12, x13, x21, x22, x23 ≥ 0 (b)Solve the linear program to determine the optimal solution. Amount Cost Jefferson City–Des Moines Jefferson City–Kansas City Jefferson City–St. Louis Omaha–Des Moines Omaha–Kansas City Omaha–St. Louis Totalarrow_forwardPlease refer to the picture for questions a, b, c, d. Thank you so much.arrow_forward
- Advanced Engineering MathematicsAdvanced MathISBN:9780470458365Author:Erwin KreyszigPublisher:Wiley, John & Sons, IncorporatedNumerical Methods for EngineersAdvanced MathISBN:9780073397924Author:Steven C. Chapra Dr., Raymond P. CanalePublisher:McGraw-Hill EducationIntroductory Mathematics for Engineering Applicat...Advanced MathISBN:9781118141809Author:Nathan KlingbeilPublisher:WILEY
- Mathematics For Machine TechnologyAdvanced MathISBN:9781337798310Author:Peterson, John.Publisher:Cengage Learning,





