Calculate the
SUSTAINABILITY
Melford Containers currently uses a recycled plastic to make bottles for the food industry.
Current bottle production information:
The cost and time standards per batch of 10,000 bottles are as follows:
Plastic 240 kilograms at $4.00 per kg |
Direct labor 2.0 hours at $20.00 per hour |
The variable manufacturing overhead rate is based on total estimated variable manufacturing overhead of $400,000 and estimated total DLH of 10,000. Melford allocates its variable manufacturing overhead based on direct labor hours (DLH).
Proposed changes to bottle design and production process:
The container division manager is considering having both the bottle redesigned and the bottle production process reengineered so that the plastic usage would drop by 30% overall due both to generating less scrap in the manufacturing process and using less plastic in each bottle. In addition to decreasing the amount of plastic used in producing the bottles, the additional following benefits would be realized:
- a. Direct labor hours would be reduced by 20% because less scrap would be handled in the production process.
- b. Total estimated variable manufacturing overhead would be reduced by 10% because less scrap would need to be hauled away, less electricity would be used in the production process, and less inventory would need to be stocked.
Requirements
- 1. Calculate the standard cost per batch of 10,000 bottles using the current data (before the company makes any changes). Include direct materials, direct labor, and variable manufacturing overhead in the standard cost per unit.
- 2. Calculate the standard cost per batch of 10,000 bottles if the company makes the changes to the bottle design and production process so that less plastic is used. Include direct materials, direct labor, and variable manufacturing overhead in the standard cost per unit.
- 3. Calculate the cost savings per batch by comparing the standard cost per batch under each scenario (current versus proposed change). Assume that the total cost to implement the changes would be $106,400. How many batches of bottles would need to be produced after the changes to have the cost savings total equal the cost to make these changes?
- 4. What other benefits might arise from making this change to using less plastic in the manufacture of the bottles? Are there any risks? What would you recommend the company do?
Want to see the full answer?
Check out a sample textbook solutionChapter 11 Solutions
MyLab Accounting with Pearson eText -- Access Card -- for Managerial Accounting (My Accounting Lab)
- Bordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forwardIn an effort to raise the demand for reading tests, managers are planning to lower the price from $36 per test to $20 per test, the current price of the math test. They believe that doing so will increase the demand for reading tests to 60,000. Prepare a contribution format income statement reflecting Abado’s new pricing and demand structure. Abado Profiles provides testing services to school districts that wish to assess students’ reading and mathematical abilities. Last year Abado evaluated 60,000 math tests and 20,000 reading tests. An income statement for last year follows. Math Testing Reading Testing Total Per Unit Total Per Unit Total Company Sales revenue $1,200,000 $20 $720,000 $36 $1,920,000 Variable expenses 840,000 14 360,000 18 1,200,000 Contribution margin $360,000 $6 $360,000 $18 720,000 Fixed expenses 360,000 Operating income $360,000arrow_forwardMANAGEMENT ACCOUNTING & CONTROL STANDARD COSTS AND VARIANCE ANALYSIS LEARNING ACTIVITY 1 Torres Company has established standard costs for the cabinet department, in which one size of MX cabinet is made. The standard costs of producing one of these MX cabinets are shown below: Standard Cost Card – MX Cabinet Direct Material: Lumber 50 board ft at P 4 200 Direct Labor: 8 hours at P 10 80 Overhead Costs: Variable – 8 hrs at P5 40 Fixed – 8 hrs at P3 24 Total Standard Unit Cost 344 During June 2018, 500 of these cabinets were produced. The cost of operations during the month are shown below. There is no work in process at the beginning and end of the month. Direct material purchased: 30,000 bf at P4.10 123,000 Direct materials used: 24,000 board ft Direct labor: 4,200 hrs at P9.50 39,900 Overhead Costs : Variable Costs 22,000 Fixed Costs 11,000…arrow_forward
- Average labor cost for the first 700 units of a product is RO 50 and the average labor cost of first 1400 units is RO 45. Average time per unit is 100 minutes. The learning ratio and the average labour cost for first 2800 units will be: a. 80% and RO 36.000 b. 90% and RO 40.500 c. 85% and RO 38.250 d. 95% and RO 42.750arrow_forwardYour company has received an order for 20 units of aproduct. Th e labor cost to produce the item is $9.50 per hour. Th esetup cost for the item is $60 and material costs are $25 per unit. Th e item is sold for $92. Th e learning rate is 80 percent. Overheadis assessed at a rate of 55 percent of unit labor cost.(a) Determine the average unit cost for the 20 units if the fi rstunit takes four hours.(b) Determine the minimum number of units that need to bemade before the selling price meets or exceeds the averageunit cost.arrow_forwardDwyran Ltd also produce, the Menai, which has been in production for a number of years, and to date 497 units of the Menai have been produced. The budget for the next quarter is showing the production of 65 units of the Menai. If the 1st ever unit took 200 hours and an 80% learning curve applies: Calculate the total labours hours needed for the production of 65 units of the Menai Calculate the average labour time per unit Note: the learning co-efficient of 80% is -0.322arrow_forward
- FNG Paint (Pty) Ltd produces finger paint and sells them to pre‐schools. The following information relates to a set of finger paint. A set of finger paint is considered to be one unit. Direct labour needed for the first set of paint 4 hoursDirect labour costs per unit R30 per hourDirect material costs per unit R25Total Fixed costs R2 000Learning curve 80% Using the learning curve theory and information provided above, calculate the expected average cost for one set of paint should four and sixteen sets be produced, respectively. Round off to two decimal places.arrow_forwardTriad Children's Center (TCC), a non-profit organization, uses relevant cost analysis to determine whether new services are desirable. TCC is looking at adding a new educational program for grade school children who are having difficulty with their reading and math skills. The following relevant costs are expected if the program is accepted: Costs (per year) Program Director salary $ 39,000 Part-time Assistants $ 28,000 Variable cost per child $ 900 TCC estimates that a maximum of 40 children will participate in this program in the first year. If TCC decides to implement this program, funding will be received from the City Chamber of Commerce ($50,000) and a local Private University Endowment Fund ($35,000). Calculate the expected surplus or deficit from operations given the above information.arrow_forwardLearning curve, cumulative average-time learning model. Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow: Calculate the total variable costs of producing 2, 4, and 8 units.arrow_forward
- P10-53B Determine transfer price at a manufacturer under various scenarios (Learning Objective 4) Assume the Small Components Division of Lang Manufacturing produces a video card used in the assembly of a variety of electronic products. The division's manufacturing costs, and variable selling expenses related to the video card are as follows: Cost per unit Direct materials $ 14.00 Direct labor $ 4.00 Variable manufacturing overhead $ 8.00 Fixed manufacturing overhead (at current production level) $ 9.00 Variable selling expenses $ 10.00 The Computer Division of Lang Manufacturing can use the video card produced by the Small Components Division and is interested in purchasing the video card in-house rather than buying it from an outside supplier. The Small Components Division has sufficient excess capacity with which to make the extra video cards. Because of competition, the market price for this video card is $30 regardless of whether the…arrow_forwardTo complete the first setup on a new machine took an employee 100 minutes. Using an 80% incremental unit-time learning model indicates that the second setup on the new machine is expected to take ________. Select one: a. 70 minutes b. 80 minutes c. 120 minutes d. 60 minutesarrow_forwardThe following information is provided to you: Time taken to produce first 8 shock pads 640 hours Time taken to produce first 16 shock pads 1200 hours Calculate the learning curve The following information is provided to you: Direct labour needed to make first machine. 1000 hoursLearning curve. 80%Direct labour cost. R300 per hourDirect materials cost. R180000 per machine Fixed cost for machines at each cumulative production R800000 Calculate the total direct hours required to manufacture four (4) machines. ( Indicate both average time per unit as well as cumulative time per unit for all theunits) Calculate the total costs to manufacture 4 machinesarrow_forward
- Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage LearningCornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning