Question
Chapter 11, Problem 30FE
To determine
Calculate the maximum acceptable cost.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
You are about to buy a piece of equipment (machine Alpha) for a project.
The initial cost is $500,000 and the annual maintenance costs is
$15,000. Another company offers you a second option (Machine Beta)
for which the annual maintenance cost is $20,000. What is the
maximum price (the initial cost) you would be willing to pay for the
second option? Both machines have the same useful life of 11 years and
the difference between their performances is negligible. Assume an
annual interest rate of 4%.
$767,524
$667,197
$456,197
$567,524
The purchase of a used pick-up truck for $9,000 is being considered. Records for other vehicles show that costs for oil, tires, and repairs roughly equal the cost for fuel. Fuel costs are $990 a year if the truck is driven 16,000 km. The salvage value after five years of use drops by $0.05 per km. Find the equivalent uniform annual cost if the discount rate is 8%. How much does this change if the annual mileage is 24,000 km? 8,000 km? Assume that, drop in Salvage Value is based on total kilometers driven, rather than the annual distance driven.
A car is needed for three years. Plans A and B for acquiring the car are being evaluated. An effective annual interest rate of 10% is to be used. Which plan is economically superior?
Plan A: Lease the car for $0.25/mile (all inclusive)
Plan B: Purchase the car for $30,000. Keep the car for three years. Sell the car after three years for $7200. Pay $0.14 per mile for oil and gas. Pay other costs of $500 per year.
Chapter 11 Solutions
EBK ENGINEERING ECONOMY
Ch. 11 - Prob. 1PCh. 11 - Refer to Example 11-2. Assuming gasoline costs...Ch. 11 - Prob. 3PCh. 11 - Prob. 4PCh. 11 - Prob. 5PCh. 11 - Prob. 6PCh. 11 - Prob. 7PCh. 11 - Prob. 8PCh. 11 - Prob. 9PCh. 11 - Prob. 10P
Ch. 11 - Prob. 11PCh. 11 - Prob. 12PCh. 11 - Prob. 13PCh. 11 - Prob. 14PCh. 11 - Prob. 15PCh. 11 - You have decided to purchase a new automobile with...Ch. 11 - Prob. 17PCh. 11 - Prob. 18PCh. 11 - Prob. 19PCh. 11 - A bridge is to be constructed now as part of a new...Ch. 11 - An aerodynamic three-wheeled automobile (the Dart)...Ch. 11 - Prob. 23PCh. 11 - Prob. 24SECh. 11 - Prob. 25SECh. 11 - Prob. 26SECh. 11 - Prob. 27SECh. 11 - Prob. 28SECh. 11 - Prob. 29SECh. 11 - Prob. 30FECh. 11 - Prob. 31FECh. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - A supermarket chain buys loaves of bread from its...Ch. 11 - Prob. 34FECh. 11 - Prob. 35FECh. 11 - Prob. 36FECh. 11 - Prob. 37FECh. 11 - Prob. 38FECh. 11 - Prob. 39FECh. 11 - Prob. 40FECh. 11 - Prob. 41FECh. 11 - Prob. 42FE
Knowledge Booster
Similar questions
- solve it using manual computation; do not use Microsoft Excel The Ajax Corporation has an overhead crane that has an estimated remaining life of 10 years. The crane can be sold now for $8,000. If the crane is kept in service, it must be overhauled immediately at a cost of $5,000. Operating and maintenance costs will be $3,000 per year after the crane is overhauled. The overhauled crane will have zero MV at the end of the 8-year study period. A new crane will cost $20,000, will last for 8 years, and will have a $4,000 MV at that time. Operating and maintenance costs are $1,000 per year for the new crane. The company uses a before-tax interest rate of 10% per year in evaluating investment alternatives. Should the company replace the old crane?arrow_forwardA bridge is to be constructed now as part of a new road. Engineers have determined that current traffic volume on the new road will justify a two-lane road and a bridge at the present time. Because of the uncertainty regarding future traffic, the time at which the additional two lanes will be required is currently being studied. Two alternatives are being considered. Alternative 1 - One-stage construction: Build a four lane bridge right now for $360,000. Alternative 2 - Two-stage construction: Start with a two-lane bridge now for $170,000 and widen to four lanes later when traffic justifies. The future cost of widening the bridge to four-lanes at that time will be $170,000 plus an extra $23,000 for every year that widening is delayed. For example, if future widening is done at the end of year 7, the cost of widening at that time will be equal to $170,000 + 7x($23,000) = $331,000. The following estimates have been made of when widening to a four-lane bridge will be required: Pessimistic…arrow_forwardA food processing plant consumed 450,000 kW of electric energy annually and pays an average of P2.00 per kWh. A study is being made to generate its own power to supply the plant the energy required, and that the power plant installed would cost P2,000,000. Annual operation and maintenance, P800,000. Other expenses P100,000 per year. Life of power plant is 15 years; salvage value at the end of life is P200,000; annual taxes and insurances, 4% of first cost; and rate of interest is 14%. What is the rate of return? Is the power plant justifiable?arrow_forward
- An electric utility company is considering a re-engineering of a major hydroelectric facility. The project would yield greater capacity and lower cost per kilowatt-hour of power. As a result of the project, the price of power would be reduced. This is expected to increase the quantity of power demanded. The following data are available Effect of Reduced Price of Power 0.08 10,000,000 0.07 14,000,000 Current price ($/kWh) Current consumption (kWh/year) New price ($/kWh) Expected consumption (kWh/year) What is the annual benefit to consumers of power from this project? The annual benefit is $arrow_forwardA food processing plant consumed 600,000 kW of electric energy annually and pays an average of P2.50 per kWh. A study is being made to generate its own power to supply the plant the energy required, and that the power plant installed would cost P2,000,000. Annual operation and maintenance, P800,000. Other expenses P100,000 per year. Life of power plant is 15 years; salvage value at the end of life is P200,000; annual taxes and insurances, 6% of the first cost; and rate of interest is 15%. Using the sinking fund method for depreciation, what is the cost savings/loss if the power plant is to be generated (indicated negative(-) sign if the cost is a loss) using the Present Worth Method.arrow_forwardK CB Electronix needs to expand its capacity. It has two feasible alternatives under consideration. Both alternatives will have essentially infinite lives. Alternative 1: Construct a new building of 20,000 square metres now. The first cost will be $2,300,000. Annual maintenance costs will be $7,000. In addition, the building will need to be painted every 15 years (starting in 15 years) at a cost of $11,000. Alternative 2: Construct a new building of 12,500 square metres now and an additional 7,500 square metres in 9 years. The first cost of the 12,500-square-metre building will be $1,350,000. The annual maintenance costs will be $3,000 for the first 9 years (i.e., until the addition is built). The 7,500-square-metre addition will have a first cost of $1,300,000. Annual maintenance costs of the renovated building (the original building and the addition) will be $9,000. The renovated building will cost $11,000 to repaint every 15 years (starting 15 years after the addition is done).…arrow_forward
- A bridge is to be constructed now as part of a new road. Engineers have determined that traffic density on the new road will justify a two-lane road and a bridge at the present time. Because of uncerta. regarding future use of the road, the time at which an extra two lanes will be required is currently being studied. The two-lane bridge will cost $210,000 and the four-lane bridge, it built initially, will cost $400,000. The future cost of widering a two-lane bridge to four lanes will be an extra $210,000 plus $23,000 for year that widening is delayed The MARR used by the highway department is 15% per year. The following estimates have been made of the times at which the four-lane bridge will be required: 4 years Pessimistic estimate Most likely estimate 5 years 9 years Optimistic estimate In view of these estimates, what would you recommend? List some advantages and disadvantages of this method of preparing estimates Click the icon to view the interest and annuity table for discrete…arrow_forward5-S2 A new recycling sorting and processing line is proposed to serve a medium size city. The installed cost of the new line is $2,400,000. The residual value after ten years is estimated at $480,000. The unit would produce recycled material ready for resale at a rate of $0.15/pound, and would run for ten years. How much recyclable material must be generated every year to justify the project (i.e., for the present value of the project to be positive). Use an interest rate of 9%.arrow_forwardA $3.5 million road widening project over a 10-mile stretch is proposed. The project will induce a 25 percent of increase in the traffic volume with an existing AADT of 20,000 in the 3-hour peak period after widening. Use 250 as the number of days per year having peak period traffic. The average speed of the existing traffic will increase from 45 mph to 55 mph. Energy use will go from an average of 28 to 23 mpg. The annual average maintenance cost is $125,000. If the value of time is $15 per hour and gasoline costs $4.5 per gallon. Use a service life of 30 years and a discount rate of 4%, calculate the project’s net present worth, benefit-to-cost ratio, and equivalent uniform annual benefits.arrow_forward
- A bridge is to be constructed now as part of a new road. Engineers have determined that current traffic volume on the new road will justify a two-lane road and a bridge at the present time. Because of the uncertainty regarding future traffic, the time at which the additional two lanes will be required is currently being studied. Two alternatives are being considered. Alternative 1 - One-stage construction: Build a four lane bridge right now for $397,000. Alternative 2 - Two-stage construction: Start with a two-lane bridge now for $190,000 and widen to four lanes later when traffic justifies. The future cost of widening the bridge to four-lanes at that time will be $190,000 plus an extra $23,000 for every year that widening is delayed. For example, if future widening is done at the end of year 7, the cost of widening at that time will be equal to $190,000 + 7x($23,000) = $351,000. The following estimates have been made of when widening to a four-lane bridge will be required: Pessimistic…arrow_forwardA company is planning to install a new automated plastic- molding press. Two different presses are available. Information for these two mutually exclusive alternatives are as follows: Press 1 Press 2 Investment cost $49,600 ??? Annual expenses $25,192 $22,880 Reject rate 2.6% 5.6% Both presses are capable of producing 120,000 units per year. Non-defective units are sold for $0.375/unit (rejected units are worthless); the selected analysis period is five years; and the MARR = 10%. Find the breakeven investment cost of Press 2.arrow_forwardA steel highway bridge must either be reinforced or replaced. Reinforcement would cost Rs. 6,60,000 and would make the bridge fit for an additional five years of service. If it is reinforced, it is estimated that its net salvage value would be Rs. 4,00,000 at the time it is retired from service. The new prestressed concrete bridge would cost Rs. 15,00,000 and would meet the foreseeable requirements of the next 40 years. Such a bridge would have no salvage value. It is estimated that the annual maintenance cost of the reinforced bridge would exceed that of the concrete bridge by Rs. 96,000. If the bridge is replaced by a new prestressed concrete bridge, the scrap value of the steel would exceed the demolition cost by Rs. 4,20,000. Assume that the money costs the state 10%. What would you recommend?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Principles of Economics (12th Edition)EconomicsISBN:9780134078779Author:Karl E. Case, Ray C. Fair, Sharon E. OsterPublisher:PEARSONEngineering Economy (17th Edition)EconomicsISBN:9780134870069Author:William G. Sullivan, Elin M. Wicks, C. Patrick KoellingPublisher:PEARSON
- Principles of Economics (MindTap Course List)EconomicsISBN:9781305585126Author:N. Gregory MankiwPublisher:Cengage LearningManagerial Economics: A Problem Solving ApproachEconomicsISBN:9781337106665Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike ShorPublisher:Cengage LearningManagerial Economics & Business Strategy (Mcgraw-...EconomicsISBN:9781259290619Author:Michael Baye, Jeff PrincePublisher:McGraw-Hill Education
Principles of Economics (12th Edition)
Economics
ISBN:9780134078779
Author:Karl E. Case, Ray C. Fair, Sharon E. Oster
Publisher:PEARSON
Engineering Economy (17th Edition)
Economics
ISBN:9780134870069
Author:William G. Sullivan, Elin M. Wicks, C. Patrick Koelling
Publisher:PEARSON
Principles of Economics (MindTap Course List)
Economics
ISBN:9781305585126
Author:N. Gregory Mankiw
Publisher:Cengage Learning
Managerial Economics: A Problem Solving Approach
Economics
ISBN:9781337106665
Author:Luke M. Froeb, Brian T. McCann, Michael R. Ward, Mike Shor
Publisher:Cengage Learning
Managerial Economics & Business Strategy (Mcgraw-...
Economics
ISBN:9781259290619
Author:Michael Baye, Jeff Prince
Publisher:McGraw-Hill Education