Concept explainers
(a)
Concept Introduction:
The variable factory
The fixed factory overhead volume variance is the difference between the standard fixed factory overhead at actual production and at
The sum of variable overhead controlled variance and fixed factory overhead volume variance is the
The variable factory overhead controlled variance.
Answer to Problem 13.28E
The variable factory overhead controlled variance is
Explanation of Solution
In the given case following data is given:
Actual factory overhead cost
Budgeted variable factory overhead cost
Budgeted fixed factory overhead cost
Standard hours for
Standard hours for actual production
Budgeted hours
Budgeted variable factory overhead at
Now, the calculation of variable overhead rate is as follows:
Now, calculation of actual variable factory overhead is as follows:
Therefore, calculation of budgeted variable factory overhead is as follows:
(b)
Concept Introduction:
The variable factory overhead controlled variance is difference between the budgeted and actual variable factory overhead.
The fixed factory overhead volume variance is the difference between the standard fixed factory overhead at actual production and at
The variable and fixed factory overhead controlled variance is that variance which does not change with change in volume.
The fixed factory overhead volume variance.
Answer to Problem 13.28E
The fixed factory overhead volume variance is
Explanation of Solution
In the given case following data is given:
Budgeted fixed factory overhead cost
Standard hours for
Standard hours for actual production
Budgeted hours
Calculation of Fixed factory overhead rate is as follows:
Now, the calculation of fixed factory overhead volume variance is given below:
Want to see more full solutions like this?
Chapter 13 Solutions
Survey of Accounting - With CengageNOW 1Term
- Factory overhead cost variance report Tiger Equipment Inc., a manufacturer of construction equipment, prepared the following factory overhead cost budget for the Welding Department for May of the current year. The company expected to operate the department at 100% of normal capacity of 8,400 hours. During May, the department operated at 8,860 hours, and the factory overhead costs incurred were indirect factory wages, 32,400; power and light, 21,000; indirect materials, 18,250; supervisory salaries, 20,000; depreciation of plant and equipment, 36,200; and insurance and property taxes, 15,200. Instructions Prepare a factory overhead cost variance report for May. To be useful for cost control, the budgeted amounts should be based on 8,860 hours.arrow_forwardFactory overhead cost variance report Feeling Better Medical Inc., a manufacturer of disposable medical supplies, prepared the following factory overhead cost budget for the Assembly Department for October of the current year. The company expected to operate the department at 100% of normal capacity of 30,000 hours. During October, the department operated at 28,500 hours, and the factory overhead costs incurred were indirect factory wages, 234,000; power and light, 178,500; indirect materials, 50,600; supervisory salaries, 126,000; depreciation of plant and equipment, 70,000; and insurance and property taxes, 44,000. Instructions Prepare a factory overhead cost variance report for October. To be useful for cost control, the budgeted amounts should be based on 28,500 hours.arrow_forwardThomas Textiles Corporation began November with a budget for 60,000 hours of production in the Weaving Department. The department has a full capacity of 75,000 hours under normal business conditions. The budgeted overhead at the planned volumes at the beginning of November was as follows: The actual factory overhead was 725,000 for November. The actual fixed factory overhead was as budgeted. During November, the Weaving Department had standard hours at actual production volume of 64,500 hours. a. Determine the variable factory overhead controllable variance. b. Determine the fixed factory overhead volume variance.arrow_forward
- Direct materials and direct labor variances At the beginning of June, Bezco Toy Company budgeted 5,000 toy action figures to be manufactured in June at standard direct materials and direct labor costs as follows: The standard materials price is 4.00 per pound. The standard direct labor rate is 18.00 per hour. At the end of June, the actual direct materials and direct labor costs were as follows: There were no direct materials price or direct labor rate variances for June. In addition, assume no changes in the direct materials inventory balances in June. Bezco Toy Company actually produced 4,850 units during June. Determine the direct materials quantity and direct labor time variances.arrow_forwardCalculating factory overhead: two variances Monrovia Manufacturing Inc. normally produces 10,000 units of product A each month. Each unit requires 4 hours of direct labor, and factory overhead is applied on a direct labor hour basis. Fixed costs and variable costs in factory overhead at the normal capacity are 10 and 5 per unit, respectively. Cost and production data for June follow: a. Calculate the flexible-budget variance. b. Calculate the production-volume variance. c. Was the total factory overhead under- or overapplied? By what amount?arrow_forwardStandard cost summary; materials and labor cost variances Perkins Processors Inc. produces an average of 10,000 units each month. The factory standards are 20,000 hours of direct labor and 10,000 pounds of materials for this volume. The standard cost of direct labor is 9.00 per hour, and the standard cost of materials is 4.00 per pound. The standard factory overhead at this level of production is 20,000. During the current month the production and cost reports reflected the following information: On the basis of this information: 1. Prepare a standard cost summary. 2. Calculate the materials (use the materials purchase price variance) and labor cost variances, and indicate whether they are favorable or unfavorable, using the formulas on pages 421422 and 424.arrow_forward
- Determining Budgeted Overhead The overhead application rate for a company is 10 per unit, made up of 6 per unit of fixed overhead and 4 per unit of variable overhead. Normal capacity is 10,000 units. In one month there was a favorable flexible budget variance of 2,500. Actual overhead for the month was 110,000 and actual units produced were 13,125. Based on this information, determine the amount of the budgeted overhead for the actual level of production.arrow_forwardStatic budget versus flexible budget The production supervisor of the Machining Department for Hagerstown Company agreed to the following monthly static budget for the upcoming year: The actual amount spent and the actual units produced in the first three months in the Machining Department were as follows: The Machining Department supervisor has been very pleased with this performance because actual expenditures for May-July have been significantly less than the monthly static budget of2,358,000. However, the plant manager believes that the budget should not remain fixed for every month but should flex or adjust to the volume of work that is produced in the Machining Department. Additional budget information for the Machining Department is as follows: a. Prepare a flexible budget for the actual units produced for May, June, and July in the MachiningDepartment. Assume depreciation is a fixed cost. b. Compare the flexible budget with the actual expenditures for the first three months.What does this comparison suggest?arrow_forwardCalculating factory overhead: two variances Munoz Manufacturing Co. normally produces 10,000 units of product X each month. Each unit requires 2 hours of direct labor, and factory overhead is applied on a direct labor hour basis. Fixed costs and variable costs in factory overhead at the normal capacity are 2.50 and 1.50 per direct labor hour, respectively. Cost and production data for May follow: a. Calculate the flexible-budget variance. b. Calculate the production-volume variance. c. Was the total factory overhead under- or overapplied? By what amount?arrow_forward
- Flexible budget for factory overhead Presented below are the monthly factory overhead cost budget (at normal capacity of 5,000 units or 20,000 direct labor hours) and the production and cost data for a month. The predetermined overhead rate is based on normal capacity. Required: 1. Assuming that variable costs will vary in direct proportion to the change in volume, prepare a flexible budget for production levels of 80%, 90%, and 110% of normal capacity. Also determine the predetermined factory overhead rate at each level of volume in both units and direct labor hours. 2. Prepare a flexible budget for production levels of 80%, 90%, and 110%, assuming that variable costs will vary in direct proportion to the change in volume, but with the following exceptions. (Hint: Set up a third category for semi-variable expenses.) a. At 110% of capacity, another supervisor will be needed at a salary of 24,000 annually. b. At 80% of capacity, the repairs expense will drop to one-half of the amount at 100% capacity. c. At 80% of capacity, one part-time maintenance worker, earning 10,000 a year, will be laid off. d. At 110% of capacity, a machine not normally in use and on which no depreciation is normally recorded will be used in production. Its cost was 12,000, it has a 10-year life, and straight-line depreciation will be taken.arrow_forwardCalculating factory overhead The standard capacity of a factory is 8,000 units per month. Cost and production data follow: Calculate the amount of factory overhead allowed for the actual volume of production each month and the variance between budgeted and actual overhead for each month.arrow_forwardCalculating amount of factory overhead applied to work in process The overhead application rate for a company is 2.50 per unit, made up of 1.00 for fixed overhead and 1.50 for variable overhead. Normal capacity is 10,000 units. In one month, there was an unfavorable flexible budget variance of 200. Actual overhead for the month was 27,000. What was the amount of the budgeted overhead for the actual level of production?arrow_forward
- Managerial AccountingAccountingISBN:9781337912020Author:Carl Warren, Ph.d. Cma William B. TaylerPublisher:South-Western College PubFinancial And Managerial AccountingAccountingISBN:9781337902663Author:WARREN, Carl S.Publisher:Cengage Learning,Principles of Cost AccountingAccountingISBN:9781305087408Author:Edward J. Vanderbeck, Maria R. MitchellPublisher:Cengage Learning
- Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage Learning