Using the data for the coffee table in Problem 14.26, build a labor schedule when the labor standard for each top is 2 labor hours; each leg including brass cap installation requires
•• 14.26 You are
Want to see the full answer?
Check out a sample textbook solutionChapter 14 Solutions
Operations Management: Sustainability and Supply Chain Management Plus MyLab Operations Management with Pearson eText -- Access Card Package (12th Edition)
- Analyze the pros and cons of using a Work Breakdown Structure against a Product Breakdown Structure.arrow_forward. Kiko Teddy Bear is a manufacturer of stuff ed teddy bears.Kiko would like to be able to produce 40 teddy bears per hour onits assembly line. Use the information provided in Table 10-20 toanswer the questions that follow (a) Draw a precedence diagram.(b) What is the cycle time?(c) What is the theoretical minimum number of stations?(d) Assign tasks to specifi c workstations using the cycle timeyou computed in part (b).(e) What are the effi ciency and balance delay of the line?(f) Which task is the bottleneck?(g) Compute the maximum outputarrow_forwardMaster schedules are expressed in three different waysdepending on whether the process is continuous, a job shop,or repetitive. What are these three ways?arrow_forward
- An assembly line is to be designed to operate 7½ hours per day and supply a steady demand of 300 units per day. Here are the tasks and their performance times: TASK PRECEDING TASKS PERFORMANCETIME (SECONDS) A — 70 B — 40 C — 45 D A 10 E B 30 F C 20 G D 60 H E 50 I F 15 J G 25 K H, I 20 L J, K 25 What is the workstation cycle time required to meet the desired output rate? What is the theoretical minimum number of workstations required to meet the desired output rate? Note: Round up your answer to the next whole number. Assign tasks to workstations using the longest operating time. What is the efficiency of your line balance, assuming it is running at the cycle time determined in part b? Note: Round your answer to 1 decimal place. Suppose demand increases by 10 percent. How would you react to this? Assume that you can operate only 71/2 hours per day. Note: Round your answer for cycle time down to the nearest whole number. Round your…arrow_forwardA manufacturing plant has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product only needs to go through one of the three one of the three assembly operations (the assembly operations are ‘parallel’). Use diagram titled "q3" attached as an image a) What is the bottleneck operation? b) What is the throughput time for the overall system? c) If the firm operates 10 hours a day, 21 days a month, what is the monthly and yearly capacity of the manufacturing process? d) Supposed that a second drilling machine is added, and it takes the same time as the original drilling machine. What is the new bottleneck time of the system? e) What is the new throughput time if the second drilling machine is added? f) What is the new hourly capacity if the second drilling machine is added?arrow_forwardDraw a process fl ow diagram of your last doctor’s offi cevisit. Identify bottlenecks. Did any activities occur in parallel?arrow_forward
- What are advantages and disadvantages of work cells? What is a heuristic? Name several that can be used in assembly-line balancing.arrow_forwardWhat is random stocking?arrow_forwardSlugger, Inc. assembles Baseball Bats with aluminum handles in an assembly line using four workstations. Management wants an output rate of 550 bats per day using a 11.5-hour workday. What is the cycle time?arrow_forward
- Amy gets home from classes around 5 P.M. each day andcan only reasonably work on her studies until midnight. Sheusually watches an hour of television to relax, works out for30 minutes, and takes 30 minutes to eat dinner. She hasfound that if she takes a 5-minute break each hour, she can remain more focused. Today she feels 80% on task. Home-work for the evening includes two critical analyses for Gov-ernment, one thesis for American Lit, and three Spanish translations. Estimated processing times are shown below.Setup time includes time spent online gathering resourcesand finding reference books around the apartment.a. What is Amy’s effective capacity to do work thisevening?b. What is her load percent? c. How would you suggest she adjust her capacity to com-plete her tasks on time? Processing TimeTasks Setup Time per TaskGovernment 15 minutes 40 minutesAmerican Lit 30 minutes 120 minutesSpanish 10 minutes 30 minutesarrow_forwardT. Smunt Manufacturing Corp. has the process displayed below. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. The product only needs to go through one of the three assembly operations (the assembly operations are “parallel”). See attached image with outline a. Which operation is the bottleneck? b. What is the throughput time (time from start to finish for one unit) of for the overall system? c. If the firm operates 8 hours per day, 22 days per month, what is the monthly capacity of the manufacturing process? d. Suppose that a second drilling machine is added, and it takes the same time as the original drilling machine. What are the new bottleneck operation and the bottleneck time? e. Suppose that a second drilling machine is added, and it takes the same time as the original drilling machine. What is the new throughput time? f. Suppose that a second drilling machine is added, and it takes the same time as the…arrow_forward14. A continuous improvement team of the production wanted to know the time to assemble one of theprinters and gathered the following data below. What will be the ideal number of stations to beassigned for the line?Tasks Time (Minutes) PrecedenceA 1.36 -B 2.73 -C 1.23 -D 4.99 A, B, CE 2.35 -F 3.04 D, EG 3.22 FH 1.17 Ga. 4b. 5c. 6d. 715. In reference to no. 14, what is the expected efficiency of the line?a. 96.46%b. 97.64%c. 89.64%d. 99.46%arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.