Assume you have a four-column matrix named BoltStock25 containing information about quarter-inch-diameter bolts your company has in stock. The first column contains the bolt length, the second column contains the number in stock, the third column contains the minimum stock that should be maintained (based on usage), and the fourth column contains the maximum number allowed in stock (based on storage space). You wish to determine how many bolts of each type to order according to the following guidelines:
- If the number in stock falls to less than the minimum stock desired plus 50 for any specific length, more of that length should be ordered.
- All orders must be in multiples of 100 of any specific length.
- The current stock plus the number ordered for a specific length must not exceed the maximum allowable stock.
- When an order is placed for a specific length, the total stock should then be as close as possible to the maximum allowed stock.
- You may assume that the maximum stock allowed is always at least 150 more than the minimum stock desired.
Create a new two-column matrix BoltOrder25. The first column should contain the lengths of all bolts that will be ordered. The second column will contain the number of each length to be ordered.
Example: One row of BoltStock25 contains [3, 219. 175, 900]. Since the number in stock (219) is less than 50 more than the minimum stock desired (175), more should be ordered to bring the total as close to 900 as possible. This means 600 should be ordered, bringing the total to 819.
Want to see the full answer?
Check out a sample textbook solutionChapter 15 Solutions
THINKING LIKE AN ENGINEER W/ACCESS
- Having trouble applying the rules for simplifying this block diagram. Please explain how to simplify. Thanks!arrow_forwardA bacteria culture is known to grow at a rate proportional to the amount present. (a) Write down and solve a DE modeling this process. (Your solution will contain two unknown constants.) (b) After one hour, 1000 strands of the bacteria are observed in the culture; and after four hours, 3000 strands. Use this information to complete the determination of the DE. c) Find the approximate number of strands of the bacteria originally in the culture. (d) How long will it take to reach 10,000 strands of the bacteria in the culture.arrow_forwardUse your matrix number by adding the last three digits to get the value of X on the velocityof plane A. The value of X will then need to be added with the digit of 150 as follows;Example; If your matrix number is AD190251,Velocity of plane A, VA = 150 + X km/hX = (2 + 5 + 1) = 8Therefore, the velocity of plane A, VA = 150 + X, = 150 + 8 = 158 km/h. SO MY LAST THREE DIGITS ARE: 008arrow_forward
- As the potential across the resistor increased, the current through the resistor increased. If the change in current is proportional to the voltage, the data should be in a straight line and it should go through zero. In these two examples how close is the y-intercept to zero? Is there a proportional relationship between voltage and current? If so, write the equation for each run in the form potential = constant x current. (Use a numerical value for the constant.)arrow_forwardYou are recently promoted as the chief traffic management officer of a major city in the country. Based on recent data, you learned that one of the leading causes of road accidents is over speeding.In your desire to minimize road accidents, you went out to observe how traffic management rules are implemented on the streets. Your attention was caught by a fast - moving car that seemed to be breaking the speed limit of 100 kilometers per hour(km/hr.), and so you followed it along the highway. After a short time, the driver of the car noticed you and started to slow down. Eventually, he stopped on the side of the road. Supposed the speed of the car had been noted during this time and is modeled by the quadratic equation y = 3x² + 17x - 20, where y represents the speed of the car in km/hr. and x represents the number of minutes after you started following the car. How long did it take for the car to be under surveillance before it could finally stop on the side of the road? Did the driver…arrow_forwardSimulated Annealing How would Simulated Annealing perform if the temperature, T, is always equal or very close to 0, where we omit the termination test (except that we terminate the search when a goal node, either a local or global optimum, is met)? Please pick up one option from the following options and explain.(a) A random walk(b) Hill-Climbing(c) It would halt immediately(d) It would never haltarrow_forward
- Hartley Electronics, Inc., in Nashville, producesshort runs of custom airwave scanners for the defense industry.The owner, Janet Hartley, has asked you to reduce inventory byintroducing a kanban system. After several hours of analysis, youdevelop the following data for scanner connectors used in onework cell. How many kanbans do you need for this connector?Daily demand 1,000 connectorsLead time 2 daysSafety stock 12 dayKanban size 500 connectorsarrow_forwardI have uploaded many times this question. Please solve it.arrow_forwardWe have designed a divide-and-conquer algorithm that runs on an input of size n. This algorithm works by spending O(1) time splitting the problem in half, then does a recursive call on each half, then spends O(n2 ) time combining the solutions to the recursive calls. On small inputs, the algorithm takes a constant amount of time. We want to see how long this algorithm takes, in terms of n to perform the task. (a) First, write a recurrence relation that corresponds to the time-complexity of the above divide and conquer algorithm. (b) Then, solve the relation to come with the worst-case time taken for the algorithm. Please show all work in depth.arrow_forward
- I wanted to create two spheres that overlap each other in MATLAB. The image has my code and results. I only see one sphere in the results. Why is that? Can you give me the code that will create two overlaying spheres in one plot?arrow_forwardYou are the mechatronics engineer of a manufacturing plant. You decide to perform an analysis on a robot arm of the assembly line with the objective of optimizing its performance. After taking several readings of the speed of the arm’s end effector, you approximate its velocity to the function given below. v(t) = -t4 + 5t3 - 7t2 + 3t + 0.22 0 =< t =< 3 where the velocity is in ms-1 Use your knowledge of differentiation to sketch the velocity-time graph, clearly marking the critical points. Using the graph sketched in (a) above, estimate the velocity when t = 1.5 s Calculate the velocity of the function when t = 1.5 s by substituting to the velocity function. Compare this value to the value you estimated in b above.arrow_forwardI need a MATLAB code that uses image segmentation to take this photo and single out the weeds in the yard. It also needs to calculate the number of pixels/percentage of the pixels that are in the weeds. Please provide notes in the lines as well so it is easy to follow and understand. Thank you for your help!arrow_forward
- Elements Of ElectromagneticsMechanical EngineeringISBN:9780190698614Author:Sadiku, Matthew N. O.Publisher:Oxford University PressMechanics of Materials (10th Edition)Mechanical EngineeringISBN:9780134319650Author:Russell C. HibbelerPublisher:PEARSONThermodynamics: An Engineering ApproachMechanical EngineeringISBN:9781259822674Author:Yunus A. Cengel Dr., Michael A. BolesPublisher:McGraw-Hill Education
- Control Systems EngineeringMechanical EngineeringISBN:9781118170519Author:Norman S. NisePublisher:WILEYMechanics of Materials (MindTap Course List)Mechanical EngineeringISBN:9781337093347Author:Barry J. Goodno, James M. GerePublisher:Cengage LearningEngineering Mechanics: StaticsMechanical EngineeringISBN:9781118807330Author:James L. Meriam, L. G. Kraige, J. N. BoltonPublisher:WILEY