Managerial Accounting, Student Value Edition (5th Edition)
5th Edition
ISBN: 9780134067179
Author: Karen W. Braun, Wendy M. Tietz
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Question
Chapter 15, Problem 15.19AE
1.
To determine
To compute: The
2.
To determine
To compute: The standard cost per batch of 10,000 bottles with a change in bottle design and production process.
3.
To determine
To compute: The cost savings per batch by comparing the standard cost under both the scenarios & the number of batches required to equal the cost saving and cost of making changes.
4.
To determine
To identify: The benefits from making the changes for using less plastic in the manufacturing of bottles, if there is any risk in making changes, and to recommend the company if any.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Average labor cost for the first 700 units of a product is RO 50 and the average labor cost of first 1400 units is RO 45. Average time per unit is 100 minutes. The learning ratio and the average labour cost for first 2800 units will be:
a.
80% and RO 36.000
b.
90% and RO 40.500
c.
85% and RO 38.250
d.
95% and RO 42.750
MANAGEMENT ACCOUNTING & CONTROL
STANDARD COSTS AND VARIANCE ANALYSIS
LEARNING ACTIVITY 1
Torres Company has established standard costs for the cabinet department, in which one size of MX cabinet is made. The standard costs of producing one of these MX cabinets are shown below:
Standard Cost Card – MX Cabinet
Direct Material: Lumber 50 board ft at P 4
200
Direct Labor: 8 hours at P 10
80
Overhead Costs: Variable – 8 hrs at P5
40
Fixed – 8 hrs at P3
24
Total Standard Unit Cost
344
During June 2018, 500 of these cabinets were produced. The cost of operations during the month are shown below. There is no work in process at the beginning and end of the month.
Direct material purchased: 30,000 bf at P4.10
123,000
Direct materials used: 24,000 board ft
Direct labor: 4,200 hrs at P9.50
39,900
Overhead Costs : Variable Costs
22,000
Fixed Costs
11,000…
Your company has received an order for 20 units of aproduct. Th e labor cost to produce the item is $9.50 per hour. Th esetup cost for the item is $60 and material costs are $25 per unit. Th e item is sold for $92. Th e learning rate is 80 percent. Overheadis assessed at a rate of 55 percent of unit labor cost.(a) Determine the average unit cost for the 20 units if the fi rstunit takes four hours.(b) Determine the minimum number of units that need to bemade before the selling price meets or exceeds the averageunit cost.
Chapter 15 Solutions
Managerial Accounting, Student Value Edition (5th Edition)
Ch. 15 - (Learning Objective 1) Which of the following is...Ch. 15 - (Learning Objective 1) Which of the following...Ch. 15 - Prob. 3QCCh. 15 - Prob. 4QCCh. 15 - (Learning Objective 2) What is the current status...Ch. 15 - (Learning Objective 2) Which of the following...Ch. 15 - Prob. 7QCCh. 15 - Prob. 8QCCh. 15 - Prob. 9QCCh. 15 - Prob. 10QC
Ch. 15 - Prob. 15.1SECh. 15 - Identify aspects within each G4 category on a GRI...Ch. 15 - Identify aspects within each G4 Social subcategory...Ch. 15 - Prob. 15.4SECh. 15 - Prob. 15.5SECh. 15 - Prob. 15.6SECh. 15 - Define key sustainability terms (Learning...Ch. 15 - Prob. 15.8SECh. 15 - Prob. 15.9AECh. 15 - Prob. 15.10AECh. 15 - Prob. 15.11AECh. 15 - Prob. 15.12AECh. 15 - Prob. 15.13AECh. 15 - Sustainability and cost behavior (Learning...Ch. 15 - Prob. 15.15AECh. 15 - Prob. 15.16AECh. 15 - Sustainability and budgeting (Learning Objective...Ch. 15 - Prob. 15.18AECh. 15 - Prob. 15.19AECh. 15 - Sustainability and capital investments (Learning...Ch. 15 - Sustainability and the statement of cash flows...Ch. 15 - Prob. 15.22AECh. 15 - Prob. 15.23BECh. 15 - Prob. 15.24BECh. 15 - Prob. 15.25BECh. 15 - Prob. 15.26BECh. 15 - Sustainability and process costing (Learning...Ch. 15 - Prob. 15.28BECh. 15 - Sustainability and CVP concepts (Learning...Ch. 15 - Prob. 15.30BECh. 15 - Prob. 15.31BECh. 15 - Prob. 15.32BECh. 15 - Prob. 15.33BECh. 15 - Sustainability and capital investments (Learning...Ch. 15 - Prob. 15.35BECh. 15 - Prob. 15.36BECh. 15 - Prob. 15.37APCh. 15 - Prob. 15.38APCh. 15 - Prob. 15.39BPCh. 15 - Prob. 15.40BPCh. 15 - Each year for the past six years, Caesars...Ch. 15 - Discussion Questions 1. Pressure to become more...Ch. 15 - Corporate Sustainability Reports Note: In the...Ch. 15 - Sustainability and investment choices...Ch. 15 - Ethics of internal sustainability reporting...Ch. 15 - FirstEnergy and its sustainability report...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Bordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forwardLearning CurveBordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On aver-age, the first unit of a new design takes 600 hours. Direct labor is paid $25 per hour. Required:1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total pro-duction of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours,…arrow_forwardNUBD Company is planning to introduce a new product with an 80 percent learning rate for production for batches of 1,000 units. The variable labor costs are P30 per unit for the first 1,000-unit batch. Each batch requires 100 hours. There are P10,000 in fixed costs not subject to learning. What is the cumulative total time (labor hours) to produce 16,000 units based on the cumulative average-time learning curve? A. 655.36 hours B. 256 hours C. 160 hours D. 409.6 hoursarrow_forward
- FNG Paint (Pty) Ltd produces finger paint and sells them to pre‐schools. The following information relates to a set of finger paint. A set of finger paint is considered to be one unit. Direct labour needed for the first set of paint 4 hoursDirect labour costs per unit R30 per hourDirect material costs per unit R25Total Fixed costs R2 000Learning curve 80% Using the learning curve theory and information provided above, calculate the expected average cost for one set of paint should four and sixteen sets be produced, respectively. Round off to two decimal places.arrow_forwardHarriman Industries manufactures engines for the aerospace industry. It has completed manufacturing the first unit of the new ZX-9 engine design. Management believes that the 1,000 labor hours required to complete this unit are reasonable and is prepared to go forward with the manufacture of additional units. An 80 percent cumulative average-time learning curve model for direct labor hours is assumed to be valid. Data on costs are as follows: Required: 1. Set up a table with columns for cumulative number of units, cumulative average time per unit in hours, and the cumulative total time in hours. Complete the table for 1, 2, 4, 8, 16, and 32 units. (Round hours to one significant digit.) 2. What are the total variable costs of producing 1, 2, 4, 8, 16, and 32 units? What is the variable cost per unit for 1, 2, 4, 8, 16, and 32 units?arrow_forwardP10-53B Determine transfer price at a manufacturer under various scenarios (Learning Objective 4) Assume the Small Components Division of Lang Manufacturing produces a video card used in the assembly of a variety of electronic products. The division's manufacturing costs, and variable selling expenses related to the video card are as follows: Cost per unit Direct materials $ 14.00 Direct labor $ 4.00 Variable manufacturing overhead $ 8.00 Fixed manufacturing overhead (at current production level) $ 9.00 Variable selling expenses $ 10.00 The Computer Division of Lang Manufacturing can use the video card produced by the Small Components Division and is interested in purchasing the video card in-house rather than buying it from an outside supplier. The Small Components Division has sufficient excess capacity with which to make the extra video cards. Because of competition, the market price for this video card is $30 regardless of whether the…arrow_forward
- Dwyran Ltd also produce, the Menai, which has been in production for a number of years, and to date 497 units of the Menai have been produced. The budget for the next quarter is showing the production of 65 units of the Menai. If the 1st ever unit took 200 hours and an 80% learning curve applies: Calculate the total labours hours needed for the production of 65 units of the Menai Calculate the average labour time per unit Note: the learning co-efficient of 80% is -0.322arrow_forwardLearning curve, cumulative average-time learning model. Northern Defense manufactures radar systems. It has just completed the manufacture of its first newly designed system, RS-32. Manufacturing data for the RS-32 follow: Calculate the total variable costs of producing 2, 4, and 8 units.arrow_forwardThe following information is provided to you: Time taken to produce first 8 shock pads 640 hours Time taken to produce first 16 shock pads 1200 hours Calculate the learning curve The following information is provided to you: Direct labour needed to make first machine. 1000 hoursLearning curve. 80%Direct labour cost. R300 per hourDirect materials cost. R180000 per machine Fixed cost for machines at each cumulative production R800000 Calculate the total direct hours required to manufacture four (4) machines. ( Indicate both average time per unit as well as cumulative time per unit for all theunits) Calculate the total costs to manufacture 4 machinesarrow_forward
- Sharon Glessing, controller for Janson Company, has noticed that the company faces a 80 percent learning rate for its specialty design line. In planning the cost of the latest design, Sharon assumed that the first set of units would take 1,100 direct labor hours. She decided to use this information in budgeting for the cost of the total project, which would involve the manufacture of 16 sets. Direct labor is paid $40 per hour. 1. Complete the table below showing results by row for total production of: one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) (Round Cumulative Total Time answers to the nearest whole number.) 2. What is the total labor cost if Janson Company makes eight sets? Sixteen sets? (Use the rounded answers in the subsequent computations). 3. Using the logarithmic function, complete the table below showing results by row for each of unit sets one through eight. (Round hour answers to two significant digits.)…arrow_forwardRead the case study below and answer the questions that follow.Hendry Limited produces a mini-kitchen called Town Cook, which is enjoying extensive popularity amongst young children.The following data is available for the month: Selling price (per unit) R 116Units in opening inventory 600Units manufactured 2 550Units sold 3 050Units in closing inventory 100Variable costs per unit: Direct materials R12,00 Direct labour R50,00 Variable manufacturing overhead R6,50 Variable selling and administrative R10,00 Fixed costs: Fixed manufacturing overhead R81 000 Fixed selling and administrative R19 000 The company produces the same number of units every month, although the sales in units vary from month to month. Thecompany’s variable costs per unit and total fixed costs have been constant from month to month Question = Calculate the unit product cost for the month under marginal costingarrow_forwardRead the case study below and answer the questions that follow.Hendry Limited produces a mini-kitchen called Town Cook, which is enjoying extensive popularity amongst young children.The following data is available for the month: Selling price (per unit) R 116Units in opening inventory 600Units manufactured 2 550Units sold 3 050Units in closing inventory 100Variable costs per unit: Direct materials R12,00 Direct labour R50,00 Variable manufacturing overhead R6,50 Variable selling and administrative R10,00 Fixed costs: Fixed manufacturing overhead R81 000 Fixed selling and administrative R19 000 The company produces the same number of units every month, although the sales in units vary from month to month. Thecompany’s variable costs per unit and total fixed costs have been constant from month to month Question = Calculate the unit product cost for the month under absorption costingarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
Inspection and Quality control in Manufacturing. What is quality inspection?; Author: Educationleaves;https://www.youtube.com/watch?v=Ey4MqC7Kp7g;License: Standard youtube license