Managerial Accounting
16th Edition
ISBN: 9781259995484
Author: Ray Garrison
Publisher: MCGRAW-HILL HIGHER EDUCATION
expand_more
expand_more
format_list_bulleted
Concept explainers
Textbook Question
Chapter 2, Problem 5E
EXERCISE 2-5 Computing Total
Braverman Company has manufacturing departments—Finishing and Fabrication. The predetermined overhead rates in Finishing and Fabrication are $18.00 per direct labor-hour and 110% of direct materials cost, respectively. The company’s direct rate is $16.00 per hour. The information pertains to Job 700:
Finishing | Fabrication | |
Direct materials | $410 | $60 |
Direct labor | $128 | $48 |
Required:
- What is the cost assigned to Job 700?
- If Job 700 consists of 15 units, what is the unit product cost for this job?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionChapter 2 Solutions
Managerial Accounting
Ch. 2.A - EXERCISE 2A-1 Activity-Based Absorption Costing...Ch. 2.A - EXERCISE 2A-2 Activity-Based Absorption Costing as...Ch. 2.A - EXERCISE 2A-3 Activity-Based Absorption Costing as...Ch. 2.A - PROBLEM 2A-4 Activity-Based Absorption Costing as...Ch. 2.A - Prob. 5PCh. 2.A -
CASE 2A-6 Activity-Based Absorption Costing and...Ch. 2.B - EXERCISE 2B-1 Overhead Rate Based on Capacity...Ch. 2.B - EXERCISE 2B-2 Overhead Rates and Capacity Issues...Ch. 2.B - Prob. 3PCh. 2.B - Prob. 4C
Ch. 2 - Prob. 1QCh. 2 - What is absorption costing?Ch. 2 - What is normal costing?Ch. 2 - How is the unit product cost of a job calculated?
Ch. 2 - Explain the four-step process used to compute a...Ch. 2 - What is the purpose of the job cost sheet in a...Ch. 2 - Explain why some production costs must be assigned...Ch. 2 - Why do companies use predetermined overhead rates...Ch. 2 - What factors should be considered in selecting an...Ch. 2 - If a company fully allocates all of its overhead...Ch. 2 - Would you expect the amount of applied overhead...Ch. 2 - Prob. 12QCh. 2 - What is a plantwide overhead rate? Whyare multiple...Ch. 2 - This Excel worksheet relates to the Dickson...Ch. 2 - This Excel worksheet relates to the Dickson...Ch. 2 - Prob. 3AECh. 2 - This Excel worksheet relates to the Dickson...Ch. 2 - Prob. 1F15Ch. 2 - Prob. 2F15Ch. 2 - Prob. 3F15Ch. 2 - Prob. 4F15Ch. 2 - Prob. 5F15Ch. 2 - Prob. 6F15Ch. 2 - Prob. 7F15Ch. 2 - Prob. 8F15Ch. 2 - Prob. 9F15Ch. 2 - Prob. 10F15Ch. 2 - Prob. 11F15Ch. 2 - Sweeten Company had no jobs in progress at the...Ch. 2 - Prob. 13F15Ch. 2 - Prob. 14F15Ch. 2 - Prob. 15F15Ch. 2 - EXERCISE 2-1 Compute a Predetermined Overhead Rate...Ch. 2 - Prob. 2ECh. 2 - EXERCISE 2–3 Computing Total Job Costs and Unit...Ch. 2 - EXERCISE 24 Computing Total Job Costs and Unit...Ch. 2 - EXERCISE 2-5 Computing Total Job Costs and Unit...Ch. 2 - Prob. 6ECh. 2 - EXERCISE 2-7 Job-Order Costing; Working Backwards...Ch. 2 - EXERCISE 2-8 Applying Overhead Cost; Computing...Ch. 2 - EXERCISE 2–9 Job-Order Costing and Decision Making...Ch. 2 - Prob. 10ECh. 2 - Prob. 11ECh. 2 - Prob. 12ECh. 2 - EXERCISE 2—13 Departmental Predetermined Overhead...Ch. 2 - EXERCISE 214 Job-Orders Costing for a Service...Ch. 2 - Prob. 15ECh. 2 - PROBLEM 2—16 Plantwide Predetermined Overhead...Ch. 2 - PROBLEM 217 Plantwide and Departmental...Ch. 2 - Prob. 18PCh. 2 - Prob. 19PCh. 2 - Prob. 20PCh. 2 - PROBLEM 2-21 Plant wide Versus Multiple...Ch. 2 - CASE 2-22 Plantwide versus Departmental Overhead...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Factory overhead rate Fabricator Inc., a specialized equipment manufacturer, uses a job order cost system. The overhead is allocated to jobs on the basis of direct labor hours. The overhead rate is now $3,000 per direct labor hour. The design engineer thinks that this is illogical. The design engineer has stated the following: Our accounting system doesn't make any sense to me. It tells me that every labor hour carries an additional burden of $3,000. This means that while direct labor makes up only 5% of our total product cost, it drives all our costs. In addition, these rates give my design engineers incentives to "design out" direct labor by using machine technology. Yet, over the past years as we have had less and less direct labor, the overhead rate keeps going up and up. I won't be surprised if next year the rate is $4,000 per direct labor hour. I'm also concerned because small errors in our estimates of the direct labor content can have a large impact on our estimated costs. Just a 30~minute error in our estimate of assembly time is worth $ 1,500. Small mistakes in our direct labor time estimates really swing our bids around. I think this puts us at a disadvantage when we are going after business. What do you think is a possible solution?arrow_forwardFactory overhead rate Fabricator Inc., a specialized equipment manufacturer, uses a job order cost system. The overhead is allocated to jobs on the basis of direct labor hours. The overhead rate is now $3,000 per direct labor hour. The design engineer thinks that this is illogical. The design engineer has stated the following: Our accounting system doesn't make any sense to me. It tells me that every labor hour carries an additional burden of $3,000. This means that while direct labor makes up only 5% of our total product cost, it drives all our costs. In addition, these rates give my design engineers incentives to "design out" direct labor by using machine technology. Yet, over the past years as we have had less and less direct labor, the overhead rate keeps going up and up. I won't be surprised if next year the rate is $4,000 per direct labor hour. I'm also concerned because small errors in our estimates of the direct labor content can have a large impact on our estimated costs. Just a 30~minute error in our estimate of assembly time is worth $ 1,500. Small mistakes in our direct labor time estimates really swing our bids around. I think this puts us at a disadvantage when we are going after business. What did the engineer mean about the large overhead rate being a disadvantage when plating bids and seeking new business?arrow_forward(Appendix 4A) Unit Cost, Ending Work in Process, Journal Entries During August, Leming Inc. worked on two jobs. Data relating to these two jobs follow: Overhead is assigned on the basis of direct labor hours at a rate of 11. During August, Job 64 was completed and transferred to Finished Goods. Job 65 was the only unfinished job at the end of the month. Required: 1. Calculate the per-unit cost of Job 64. 2. Compute the ending balance in the work-in-process account. 3. Prepare the journal entries reflecting the completion and sale on account of Job 64. The selling price is 175% of cost. (Note: Round all journal entry amounts to the nearest dollar.)arrow_forward
- Analyzing manufacturing cost accounts Fire Rock Company manufactures Designer paddle boards in a wide variety of sizes and styles. The following incomplete ledger accounts refer to transactions that are summarized for June: In addition, the following information is available: a . Materials and direct labor were applied to the following jobs in June: b. factory overhead is applied to each job at a rate of 140% of direct labor cost c. The June 1 Work in Process balance consisted of two job as follows: Job No. Style Work In Process, June 1 201 T100 16,500 202 T200 44,000 Total 60,500 d. Customer jobs completed and units sold in June were as follows: Instructions 1. Determine the missing amounts associated with each letter. Provide supporting calculations by completing a table with the following headings: 2. Determine the June 50 balances for each of the inventory accounts and factor overhead.arrow_forward(Appendix 4A) Journal Entries, Job Costs The following transactions occurred during the month of April for Nelson Company: a. Purchased materials costing 4,610 on account. b. Requisitioned materials totaling 4,800 for use in production, 3,170 for Job 518 and the remainder for Job 519. c. Recorded 65 hours of direct labor on Job 518 and 90 hours on Job 519 for the month. Direct laborers are paid at the rate of 14 per hour. d. Applied overhead using a plantwide rate of 6.20 per direct labor hour. e. Incurred and paid in cash actual overhead for the month of 973. f. Completed and transferred Job 518 to Finished Goods. g. Sold on account Job 517, which had been completed and transferred to Finished Goods in March, for cost (2,770) plus 25%. Required: 1. Prepare journal entries for Transactions a through e. 2. Prepare job-order cost sheets for Jobs 518 and 519. Prepare journal entries for Transactions f and g. (Note: Round to the nearest dollar.) 3. Prepare a schedule of cost of goods manufactured for April. Assume that the beginning balance in the raw materials account was 1,025 and that the beginning balance in the work-in-process account was zero.arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Managerial Accounting: The Cornerstone of Busines...AccountingISBN:9781337115773Author:Maryanne M. Mowen, Don R. Hansen, Dan L. HeitgerPublisher:Cengage LearningSurvey of Accounting (Accounting I)AccountingISBN:9781305961883Author:Carl WarrenPublisher:Cengage LearningAccountingAccountingISBN:9781337272094Author:WARREN, Carl S., Reeve, James M., Duchac, Jonathan E.Publisher:Cengage Learning,
Managerial Accounting: The Cornerstone of Busines...
Accounting
ISBN:9781337115773
Author:Maryanne M. Mowen, Don R. Hansen, Dan L. Heitger
Publisher:Cengage Learning
Survey of Accounting (Accounting I)
Accounting
ISBN:9781305961883
Author:Carl Warren
Publisher:Cengage Learning
Accounting
Accounting
ISBN:9781337272094
Author:WARREN, Carl S., Reeve, James M., Duchac, Jonathan E.
Publisher:Cengage Learning,
Cost Accounting - Definition, Purpose, Types, How it Works?; Author: WallStreetMojo;https://www.youtube.com/watch?v=AwrwUf8vYEY;License: Standard YouTube License, CC-BY