Chapter 39, Problem 3RQ
Why are normally closed components such as STOP push buttons programmed normally open instead of normally closed when entering a program into the memory of a PLC?
Expert Solution & Answer
![Check Mark](/static/check-mark.png)
Want to see the full answer?
Check out a sample textbook solution![Blurred answer](/static/blurred-answer.jpg)
Students have asked these similar questions
In what ways do controllers for various devices aid in operation?
What is an interrupt? define and explain how Transfer of Control via Interrupts?
1.
A mixing vat has an inlet valve, an outlet valve, a mixing motor, and a single level detecting switch (Figure 1).
Both valves are opened by solenoids. The level switch closes when the vat is full and stays closed until the vat is
empty. Draw a PLC ladder logic diagram and provide the allocation list to do the
following:
a. When the start button is pushed, the inlet valve opens until the vat is full.
b. The mixer motor comes on for 5 min.
c. The outlet valve opens until the vat is empty.
(closed)
Level switch
Motor
Inlet valve
Outlet valve
Float
Vat
Figure 1
Chapter 39 Solutions
Bundle: Understanding Motor Controls, 4th + Mindtap Electrical, 2 Terms (12 Months) Printed Access Card
Ch. 39 - Why are NEMA symbols such as push buttons, float...Ch. 39 - Prob. 2RQCh. 39 - Why are normally closed components such as STOP...Ch. 39 - Prob. 4RQCh. 39 - Prob. 5RQCh. 39 - List four basic rules for developing a program for...Ch. 39 - A PLC requires that times be programmed in...Ch. 39 - When programming in Boolean, what statement should...Ch. 39 - When programming in Boolean, what statement should...Ch. 39 - In a control circuit, it is imperative that a coil...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.Similar questions
- Name the four basic sections of a programmable logic controller.arrow_forward17- The memory unit of PLC is used to write the program to control output device. Select one: True Falsearrow_forwardWhat is the purpose of the key switch located on the front of the CPU in many programmable logic controllers?arrow_forward
- Traffic Light System Construct a PLC program for a traffic light system with the following condition: The green light will be ON for 10 second, followed by the yellow light for 3 second and red light for 20. The system will run continuously until the START/STOP switch is deactivated. Figure 12: The traffic light system Two Directional Control of Traffic Light Extend the PLC program for the traffic light system with the following condition:. Red = north/south Green = north/south Amber = north/south Green = east/west Amber = east/west Red = east/west -25 s ·5 s 25 s 5 sarrow_forwardBlock diagram and explanation of the applications of open loop system: Automatic washing machine, Automatic toaster system, Traffic light controller and Furnace without thermostatic control but with timing devicearrow_forwardI want you to draw a ladder logic diagram of a garage door to control it by PLC. In my case we have different inputs and outputs and all of them gotta be used in the diagram. I can perfectly interpret the diagram so no need to explain it, I will just require you to draw it. INPUTS : open push button ( OPB ) - close push button ( CPB ) - open limit switch ( OLS ) - close limit switch ( CLS ) - obstacle detection sensor ( ODS ) - safety sensor ( SS ) - emergency stop push button ( ESPB ) - reset button ( RB ) OUTPUTS : motor starts ( MS ) - motor stops ( MSTP ) - motor forward ( MF ) - motor reverse ( MR ) - Error display ( ER ) OPERATİNG MODES : automatic mode ( AM ) - manual mode ( MM ) NECESSARY TIMERS : T1 ( delay door movement after obstacle detection ) - T2 ( delay door movement after reversing ) Here is my excercise for today. Please I am requiring a good logic diagram taking into consideration all what was mentioned before. so to sum up, I want you to write a logic ladder diagram…arrow_forward
- The system will have a direct connection between the output and input.arrow_forwardWhat industry first started using programmable logic controllers?arrow_forwardIn a control circuit, it is imperative that a coil energize before another one. How can this be done when entering a program into the memory of the PLC?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Understanding Motor ControlsMechanical EngineeringISBN:9781337798686Author:Stephen L. HermanPublisher:Delmar Cengage Learning
![Text book image](https://www.bartleby.com/isbn_cover_images/9781337798686/9781337798686_smallCoverImage.jpg)
Understanding Motor Controls
Mechanical Engineering
ISBN:9781337798686
Author:Stephen L. Herman
Publisher:Delmar Cengage Learning
The Robot Revolution: The New Age of Manufacturing | Moving Upstream; Author: Wall Street Journal;https://www.youtube.com/watch?v=HX6M4QunVmA;License: Standard Youtube License