A PLC requires that times be programmed in 0.1-second intervals. What number should be entered to produce a time delay of 3 minutes?

Blurred answer
Students have asked these similar questions
An emergency stop system is to be designed for a certain automatic production machine. A single “start” button is used to turn on the power to the machine at the beginning of the day. In addition, there are two “stop” buttons located at two locations on the machine, either of which can be pressed to immediately turn off power to the machine. Let X1 = start button (normally open), X2 = stop button 1 (normally closed), X3 = stop button 2 (normally closed), and Y = power-to-machine. (a) Construct the truth table for this system. (b) Write the Boolean logic expression for the system. (c) Construct the ladder logic diagram for the system
I want you to draw a ladder logic diagram of a garage door to control it by PLC. In my case we have different inputs and outputs and all of them gotta be used in the diagram. I can perfectly interpret the diagram so no need to explain it, I will just require you to draw it. INPUTS : open push button ( OPB ) - close push button ( CPB ) - open limit switch ( OLS ) - close limit switch ( CLS ) - obstacle detection sensor ( ODS ) - safety sensor ( SS ) - emergency stop push button ( ESPB ) - reset button ( RB ) OUTPUTS : motor starts ( MS ) - motor stops ( MSTP ) - motor forward ( MF ) - motor reverse ( MR ) - Error display ( ER ) OPERATİNG MODES : automatic mode ( AM ) - manual mode ( MM ) NECESSARY TIMERS : T1 ( delay door movement after obstacle detection ) - T2 ( delay door movement after reversing ) Here is my excercise for today. Please I am requiring a good logic diagram taking into consideration all what was mentioned before. so to sum up, I want you to write a logic ladder diagram…
2) The continuous stopwatch timing method was used to obtain the observed times for a worker-machine task. Only one cycle was timed. The data are recorded in the table below. The times are listed indicate the stopwatch reading at the end of the element. Elements a, b, and d are worker-controlled elements. Element c is machine controlled. Elements a and d are external to the machine-controlled element, while element b is internal. Every four cycles, there is an irregular worker element that takes 1.32 min rated at 100% performance. For determining the standard time, the PFD allowance is 15% and the machine allowance is 30%. Determine a. The normal time b. Standard time for the cycle c. If worker efficiency is 100%, how many units will be produced in one 8-hour shift? d. If the actual time worked during the shift is 6.86 hours, and the worker performance is 125%, how many units will be produced? Description of Worker Time Description of (min) Rating (%) Element Machine Element Worker…
Knowledge Booster
Background pattern image
Mechanical Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, mechanical-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Understanding Motor Controls
Mechanical Engineering
ISBN:9781337798686
Author:Stephen L. Herman
Publisher:Delmar Cengage Learning
Text book image
Precision Machining Technology (MindTap Course Li...
Mechanical Engineering
ISBN:9781285444543
Author:Peter J. Hoffman, Eric S. Hopewell, Brian Janes
Publisher:Cengage Learning
Text book image
Automotive Technology: A Systems Approach (MindTa...
Mechanical Engineering
ISBN:9781133612315
Author:Jack Erjavec, Rob Thompson
Publisher:Cengage Learning
The Robot Revolution: The New Age of Manufacturing | Moving Upstream; Author: Wall Street Journal;https://www.youtube.com/watch?v=HX6M4QunVmA;License: Standard Youtube License