Chapter 4, Problem 20P
To determine

The turnover, duration, capacity, peak demand & its time of occurrence and occupancy of the parking lot and the parking accumulation curve.

Blurred answer
Students have asked these similar questions
PARKING STUDIES PROB 1. Data collected at a parking lot indicate that a total of 300 cars park between 8 a.m. and 6 p.m. 10% of these cars are parked for an average of 2 hr, 30% for an average of 4 hr, and the remaining cars are parked for an average of 10 hr. Determine the space-hours of demand at the lot PROB 2. If 10% of the parking bays are vacant on average (between 8 a.m. and 6 p.m.) at the parking lot of PROB1, determine the number of parking bays in the parking lot. Assume an efficiency factor of 0.85
Data collected at a parking lot indicate that a total of 300 cars park between 8 a.m. and 5 p.m. 5% of these cars are parked for an average of 2 hr, 20% for an average of 3 hr, 10% for an average of 4 hr, and the remaining cars are parked for an average of 9 hr. (a) Determine the space-hours of demand at the lot. (b) If 10% of the parking bays are vacant on average (between 8 a.m. and 5 p.m.) at the parking lot, determine the number of parking bays in the parking lot. Assume an efficiency factor of 0.90. (c) The owner of the parking lot is planning an expansion of her lot to provide adequate demand for the following 10 years. If she has estimated that parking demand for all categories will increase by 3% a year, determine the number of additional parking bays that will be required.
TASK 1: Question 1 From an in-out survey conducted for a parking area consisting of 150 bays, the initial count was found to be XY. The table below gives the results of the survey. The number of vehicles coming in and out of the parking lot for a time interval of 5 minutes is shown in the table. Find the accumulation, total parking load, average occupancy and efficiency of the parking lot. Note: XY= 100- last two digits of your student number. For example, if your student number is 190786, then XY= 100-86= 14. Time In 05 10 15 20 25 30 35 40 45 50 55 60 40 44 14 30 16 20 Out 36 22 15 19 28 14 18 14 18 30 28 15 12 22 21 19 20 25
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning