Concept explainers
Explanation of Solution
Optimal solution:
Consider the following linear programing problem:
Subject to the constraints:
Use
Subject to the constraints:
Add slack variables s1,s2 and artificial variable a1 to get:
-(min w′ = -5x1+x2+a1)
Subject to the constraints:
Two Phase Method:
Phase I linear programming problem is,
Subject to the constraints:
The initial simplex table is given below:
w′ | x1 | x2 | a1 | s1 | s2 | rhs | basic variable | |
R0 | 1 | 0 | 0 | -1 | 0 | 0 | 0 | w′=0 |
R1 | 0 | 2 | 1 | 1 | 0 | 0 | 6 | a1=6 |
R2 | 0 | 1 | 1 | 0 | 1 | 0 | 4 | s1=4 |
R3 | 0 | 1 | 2 | 0 | 0 | 1 | 5 | s2=5 |
- Since, the basic variable a1 value in R0 is non-zero, therefore, do the transformations
w′ | x1 | x2 | a1 | s1 | s2 | rhs | basic variable | |
R0 | 1 | 0 | 0 | -1 | 0 | 0 | 0 | w′=0 |
R1 | 0 | 2 | 1 | 1 | 0 | 0 | 6 | a1=6 |
R2 | 0 | 1 | 1 | 0 | 1 | 0 | 4 | s1=4 |
R3 | 0 | 1 | 2 | 0 | 0 | 1 | 5 | s2=5 |
Since the highest positive entry 2 in R0 corresponds to x1, x1 enters the basis.
w′ | x1 | x2 | a1 | s1 | s2 | rhs | ratio | |
R0 | 1 | 2 | 1 | 0 | 0 | 0 | 6 | - |
R1 | 0 | 2 | 1 | 1 | 0 | 0 | 6 | 3* |
R2 | 0 | 1 | 1 | 0 | 1 | 0 | 4 | 4 |
R3 | 1 | 2 | 0 | 0 | 0 | 1 | 5 | 5 |
Apply the simplex method further:
w′ | x1 | x2 | a1 | s1 | s2 | rhs | basic variable | |
R0 | 1 | 0 | 0 | -1 | 0 | 0 | 0 | w′=0 |
R1 | 0 | 1 | 0 | 0 | 6 | x1 = 3 | ||
R2 | 0 | 0 | 1 | 0 | 1 | s1=1 | ||
R3 | 0 | 0 | 0 | 1 | 2 | s2=2 |
- Optimally reached for phase 1. Proceed to phase 2 with the actual objective function
Want to see the full answer?
Check out a sample textbook solutionChapter 4 Solutions
Student Suite Cd-rom For Winston's Operations Research: Applications And Algorithms
- Variable Cells Final Reduced Objective Allowable Allowable Cell Name Value Cost Coefficient Increase Decrease Туре А 4 -3.5 1E+30 Туре B y Туре С 3. 6. 2 Constraints Final Shadow Constraint Allowable Allowable Cell Name Value Price R.H. Side Increase Decrease Hours 1. 15 1 15 12 8. Plastic 20 30 1E+30 30 Cotton 70 70 40 55 Calculate the optimal value of the objective function if the coefficient of "x" changes to 4 and the coefficient of "y" changes to 3.5. Hint: Since it is proposing a simultaneous change (more than one change at a time), we have to check the 100% rule. **Enter the number only** **Do not use any words or symbols** Answer: 5 M 5arrow_forwardb) Consider the following linear programming problem: Min z = x1 + x2 s.t. 3x1 – 2x2 < 5 X1 + x2 < 3 3x1 + 3x2 2 9 X1, X2 2 0 Using the graphical approach, determine the possible optimal solution(s) and comment on the special case involved, if any.arrow_forwardThe shaded region in the given figure above illustrates an unbounded feasible region. Which of the following is true? I. The maximum value for the objective function does not exist in an unbounded feasible region. II. If the objective function is Min Z=x+y, then it's maximum is 25 at (25,0). III. If the objective function is Max Z=-x+2y, then it's minimum is O at (25,0). IV. Unbounded feasible regions have either maximum or minimum value. 024 10 (25 0) -20 -10 10 O A. I O B. II O C.I and II O D. II and IVarrow_forward
- QUESTION 9 What is one advantage of AABB over Bounding Spheres? Computing the optimal AABB for a set of points is easy to program and can be run in linear time. Computing the optimal bounding sphere is a much more difficult problem. The volume of AABB can be an integer, while the volume of a Bounding Sphere is always irrational. An AABB can surround a Bounding Sphere, while a Bounding Sphere cannot surround an AABB. To draw a Bounding Ball you need calculus knowledge.arrow_forwardSolve the following LPP by graphical Method Maximize Z =22X1+18X2 Subject to constraints: 960X1+640X2≤15 360X1+X2≤20 and X1,X2≥0 (Note the X1 And X2 are variables and not to be mistaken with muliplication symbol)arrow_forwardYou have to solve it Using Python Programming language.arrow_forward
- Two investments with varying cash flows (in thousands of dollars) are available, as shown in the table below. At time 0, $10,000 is available for investment, and at time 1, $7,000 is available. Assuming that r 0.10, set up an LP whose solution maximizes the NPV obtained from these investments. Graphically find the optimal solution to the LP.arrow_forwardYou have to solve it by using Python Programming.arrow_forwardUse K-map to find optimal product of sums-arrow_forward
- Operations Research : Applications and AlgorithmsComputer ScienceISBN:9780534380588Author:Wayne L. WinstonPublisher:Brooks Cole