PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
7th Edition
ISBN: 9781119610526
Author: Mannering
Publisher: WILEY
expand_more
expand_more
format_list_bulleted
Question
Chapter 6, Problem 4P
To determine
The level of service of the freeway.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
You are designing a freeway as a passenger-car only facility, and with ideal roadway characteristics. It is estimated that the freeway will have a
traffic demand of 75,000 vehicles per day, a free-flow speed of 70 mi/h, a traffic stream of primarily commuters, a peak-hour factor of 0.88, and
a directional distribution of 0.65. Determine the number of lanes (both directions) required to provide at least LOS C using the 40th highest
annual hourly volume (K = 0.116).
A 6
B) 4
c) 10
D) 8
You are designing a freeway as a passenger-car only facility, and with ideal roadway characteristics. It is estimated that the freeway will have a traffic demand of 75,000 vehicles per day, a free-flow speed of 70 mi/h, a traffic stream of primarily commuters, a peak-hour factor of 0.88, and a directional distribution of 0.65. Determine the number of lanes (both directions) required to provide at least LOS C using the 40th highest annual hourly volume (K = 0.116).
Consider the freeway and traffic conditions
described in Problem 6.3. If 180 of the 1800 vehicles
observed in the peak hour were large trucks and
buses, what would the level of service of this freeway
be on a 5-mi, 6% downgrade?
Chapter 6 Solutions
PRIN.OF HIGHWAY ENGINEERING&TRAFFIC ANA.
Ch. 6 - Prob. 1PCh. 6 - Prob. 2PCh. 6 - Prob. 3PCh. 6 - Prob. 4PCh. 6 - Prob. 5PCh. 6 - Prob. 6PCh. 6 - Prob. 7PCh. 6 - Prob. 8PCh. 6 - Prob. 9PCh. 6 - Prob. 10P
Ch. 6 - Prob. 11PCh. 6 - Prob. 12PCh. 6 - Prob. 13PCh. 6 - Prob. 14PCh. 6 - Prob. 15PCh. 6 - Prob. 16PCh. 6 - Prob. 17PCh. 6 - Prob. 18PCh. 6 - Prob. 19PCh. 6 - Prob. 20PCh. 6 - Prob. 21PCh. 6 - Prob. 22PCh. 6 - Prob. 23PCh. 6 - Prob. 24PCh. 6 - Prob. 25PCh. 6 - Prob. 26PCh. 6 - Prob. 27PCh. 6 - Prob. 28PCh. 6 - Prob. 29PCh. 6 - Prob. 30PCh. 6 - Prob. 31PCh. 6 - Prob. 32PCh. 6 - Prob. 33PCh. 6 - Prob. 34PCh. 6 - Prob. 35PCh. 6 - Prob. 36PCh. 6 - Prob. 37P
Knowledge Booster
Similar questions
- A six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak hour traffic volume is 3900 vehicles, compute for the driver population factor used?arrow_forwardYou are designing a freeway as a passenger-car only facility, and with ideal roadway characteristics. It is estimated that the freeway will have a traffic demand of 75,000 vehicles per day, a free-flow speed of 70 mi/h, a traffic stream of primarily commuters, a peak-hour factor of 0.88, and a directional distribution of 0.65. Determine the number of lanes (both directions) required to provide at least LOS D using the 30th highest annual hourly volume (K30 = 0.12). The answer is a/an -lane freeway.arrow_forwardYou are designing a freeway as a passenger-car only facility, and with ideal roadway characteristics. It is estimated that the freeway will have a traffic demand of 75,000 vehicles per day, a free-flow speed of 70 mi/h, a traffic stream of primarily commuters, a peak-hour factor of 0.88, and a directional distribution of 0.65. Determine the number of lanes (both directions) required to provide at least LOS D using the 60th highest annual hourly volume (K60 = 0.11). The answer is a/an -ane freeway.arrow_forward
- A six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak-hour traffic volume is 3900 vehicles, c.) what value for the driver population factor was used? (Express in three decimals)arrow_forwardA six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak-hour traffic volume is 3900 vehicles, a.) Determine fy (Express in three decimals)arrow_forwardA six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak-hour traffic volume is 3900 vehicles, b.) Determine vparrow_forward
- A six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak-hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak-hour traffic volume is 3900 vehicles, what value for the driver population factor was used?arrow_forwardEight lane urban freeway is on level terrain with lane width of 12 ft, right shoulder lateral clearance of 4 ft, and 12 ramps over the 6-mi analysis segment. The traffic stream consists of unfamiliar road users. Peak hour volume for a directional weekday of 3200 vehicles is observed with 900 vehicles arriving in the most congested 15-min period. If the traffic stream has 20% large trucks and 20% buses and 15% recreational vehicles, determine the exact demand flow rate (in pc/h/In). Round your answer to 3 decimal places. Exclude the unit in the answer box.arrow_forwardEight lane urban freeway is on mountainous terrain with lane width of 12 ft, right shoulder lateral clearance of 4 ft, and 12 ramps over the 6-mi analysis segment. The traffic stream consists of familiar road users. Peak hour volume for a directional weekday of 5200 vehicles is observed with 500 vehicles arriving in the most congested 15-min period. If the traffic stream has 10% large trucks and 12% buses and 10% recreational vehicles, determine the heavy vehicle adjustment factor. Round your answer to 3 decimal places. Exclude the unit in the answer box.arrow_forward
- Isabel A six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. The peak hour factor is 0.80, and there are 8% large trucks and buses and 6% recreational vehicles in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak-hour traffic volume is 3900 vehicles, a.) Determine fy (Express in three decimals)arrow_forwardA Four Lane freeway is located on rolling terrain with a free flow speed of 70 mph,12ft lanes, and no lateral obstructions within 8 ft of the pavement edges. the traffic stream consists of cars, buses and large trucks (no recreational vehicles) . A weekend directional peak hour volume of 1800 vehicles (*regular users*)is observed ,with 700 arriving in the mostly congested 15 minutes period . if a level of service no worse than C is required ,determine the maximum number of large trucks and buses that can be present in the peak hour traffic stream.. Dislike for wrong answersarrow_forwardA six-lane freeway (three lanes in each direction) in a scenic area has a measured free-flow speed of 55 mi/h. There are 7% SUTs and 7% TTs in the traffic stream. One upgrade is 5% and 0.5 mi long. An analyst has determined that the freeway is operating at capacity on this upgrade during the peak hour. If the peak-hour traffic volume is 3900 vehicles, what value for the peak-hour factor was used? Answer: Peak Hour Factor = 0.731arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning