Principles of Geotechnical Engineering (MindTap Course List)
Principles of Geotechnical Engineering (MindTap Course List)
9th Edition
ISBN: 9781305970939
Author: Braja M. Das, Khaled Sobhan
Publisher: Cengage Learning
bartleby

Concept explainers

Question
Book Icon
Chapter 6, Problem 6.11P

(a)

To determine

Find the volumes of each borrow pit soil required to meet the specification of the embankment site.

(b)

To determine

Find the most cost effective borrow pit.

Blurred answer
Students have asked these similar questions
A proposed earth embankment requires 50,000 cubic meters of soil. The soil will be compacted to a void ratio of 0.75 when it is placed in the embankment. There are four available borrow pits, designated A, B, C, and D. The void ratio of the soil in each pit and the cost per cubic meter for moving the soil to the proposed construction site are shown as follows: Determine which borrow pit is the most economical.
An earth dam requires 1 million cu.m. of soil compacted to a void ratio of 0.80. In the vicinity of the proposed dam, three borrow pits were identified as having suitable materials. The cost of purchasing the soil and the cost of excavation are the same for each borrow pit. The only cost difference is transportation cost. The table below provides the void ratio and the transportation cost for each borrow pit. PLEASE COMPLETE SOLUTION 1. Compute the volume of soil if taken from borrow pit C.2. Compute the transportation cost of the soil if taken from borrow pit B.3. Which borrow pit would be the most economical?
A proposed embankment fill requires 7500 m3 of compacted soil. The void ratio of thecompacted fill is specified as 0.7. Soil can be transported from one of the four borrowpits, as described in the following table. The void ratio, specific gravity of soil solids,and the cost per cubic meter for moving the soil to the proposed construction site areprovided in the table.a. Determine the volume of each borrow pit soil required to meet the specification ofthe embankment site.b. Make the necessary calculations to select the borrow pit which would be most costeffective.
Knowledge Booster
Background pattern image
Civil Engineering
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Principles of Geotechnical Engineering (MindTap C...
Civil Engineering
ISBN:9781305970939
Author:Braja M. Das, Khaled Sobhan
Publisher:Cengage Learning
Text book image
Principles of Foundation Engineering (MindTap Cou...
Civil Engineering
ISBN:9781337705028
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning
Text book image
Fundamentals of Geotechnical Engineering (MindTap...
Civil Engineering
ISBN:9781305635180
Author:Braja M. Das, Nagaratnam Sivakugan
Publisher:Cengage Learning