a)
To determine: Sample means, UCL, and LCL for
Introduction: Control charts used to determine whether the process is under control or not. Attributes and variables are the factors under the control charts.
b)
To determine: Whether the process been in control.
Introduction: Control charts used to determine whether the process is under control or not. Attributes and variables are the factors under the control charts.
c)
To determine: The observed timelines.
Introduction: Control charts used to determine whether the process is under control or not. Attributes and variables are the factors under the control charts.
Want to see the full answer?
Check out a sample textbook solutionChapter 6 Solutions
Principles of Operations Management: Sustainability and Supply Chain Management, Student Value Edition Plus MyLab Operations Management with Pearson eText -- Access Card Package (10th Edition)
- Fearless Inc. has designed and tested 400 Super Sucker Vacuum Cleaner models. All of them were operated for 1,000 hours at Lubbock's Fearless test facility. Out of all the vacuums 2 of them failed during the test. One of them after 900 hours and the other after 500 hours. What is this product estimated Mean Time Between Failures?arrow_forwardWest Battery Corp. has recently been receiving complaints from retailers that its 9-volt batteries are not lasting as long as other name brands. James West, head of the TQM program at West's Austin plant, believes there is no problem because his batteries have had an average life of 60hours, about 10% longer than competitors' models. To raise the lifetime above this level would require a new level of technology not available to West. Nevertheless, he is concerned enough to set up hourly assembly line checks. Previously, after ensuring that the process was running properly, West took samples of 5 9-volt batteries for 25 test to establish the standards for control chart limits. Those 25 tests are shown in the following table: Sample Data Sample Data Hour Sample Taken 1 2 3 4…arrow_forwardC-Spec, Incorporated is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 4 ± 0.003 inch. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 4.001 inches with a standard deviation of 0.002 inch. Calculate the capability index ( Cpk��� ) for this machine. Note: Round your answer to 3 decimal places. Should C-Spec use this machine to produce this part? multiple choice Yes Noarrow_forward
- The specifications for a gasket that installs between two engine parts calls for a thickness of 6.0 mm ± .2 mm. The standard deviation of the process is estimated to be 0.05 mm. The process is known to operate at a mean thickness of 6.1 mm What are the upper and lower specification limits for the gasket? What are the Cp and Cpk values for this process? Is this process capable of producing the desired part?arrow_forwardBlueMoon Bottlers has a bottle-filling process with a mean value of 64 ounces and a standard deviation of 8 ounces. Suppose the upper and lower specification limits are 71 and 57 ounces, respectively. What is the process capability index of this process? (Note: You MUST show every single step and detailed derivation for full credit)arrow_forwardC-Spec, Inc., is attempting to determine whether an existing machine is capable of milling an engine part that has a key specification of 5 ± 0.006 inches. After a trial run on this machine, C-Spec has determined that the machine has a sample mean of 5.001 inches with a standard deviation of 0.005 inch. Calculate the Cpk for this machine. (Round your answer to 3 decimal places.)arrow_forward
- A process screens a certain type of potash granule, resulting in a mean diameter of 0.067 cm and a standard deviation of 0.004 cm. The allowable variation in granule diameter is from 0.048cm to 0.087cm. Is the process capable? a. Cannnot be determined because sample size is not available b. Cannot be determined because USL and LSL information is not available c. Process is NOT capable d. Process is capablearrow_forwardIn hydraulic fracture test, an induced fracture was created at 12.8 MPa. The fracture was reopened in three subsequent cycles. The reopening pressure at third cycle was found to be 6.4 MPa. If the tensile strength of rock is 6.3 MPa, and the pore water pressure is negligible. Determine the maximum and minimum principle stresses if the shut - in pressure was found to be 5.9 MPaarrow_forwardAspen Plastics produces plastic bottles to customer order. The quality inspector randomly selects four bottles from the bottle machine and measures the outside diameter of the bottleneck, a critical quality dimension that determines whether the bottle cap will fit properly. The dimensions (inch) from the last six samples are: BOTTLE Sample 1 2 3 4 1 0.694 0.622 0.698 0.69 2 0.687 0.611 0.697 0.613 3 0.671 0.680 0.695 0.602 4 0.610 0.615 0.685 0.678 5 0.680 0.624 0.618 0.614 6 0.685 0.693 0.607 0.669 What would be the center line of a 3-sigma S chart? Answer:arrow_forward
- At Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its length is between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49 inches and a standard deviation of 0.014 inches. a) is the process capable of meeting specifications? b) Does the process meet specifications?arrow_forwardAt Gleditsia Triacanthos Company, a certain manufactured part is deemed acceptable if its lengthis between 12.45 to 12.55 inches. The process is normally distributed with an average of 12.49inches and a standard deviation of 0.014 inches. A) Is the process capable of meeting specifications? B) Does the process meet specifications?arrow_forwardThe National Bank of Warwick is concerned with com-plaints from customers about its drive-through window op-eration. Customers complain that it sometimes takes too long to be served and since there are often cars in front and back of a customer, they cannot leave if the service is tak-ing a long time. To correct this problem the bank installed an intercom system so the drive-through window teller cancall for assistance if the line backs up or a customer has an unusually long transaction. The bank’s objective is an aver-age customer’s waiting and service time of approximately 3 minutes. The bank’s operations manager wants to moni-tor the new drive-through window system with SPC. The manager has timed five customers’ waiting and servicetimes at random for 12 days as follows:Develop an -chart to be used in conjunction with anR-chart to monitor this drive-through window process andindicate if the process is in control using these charts. Observation Times (min)Sample 1 2 3 4 51 3.05 6.27…arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.