Traffic and Highway Engineering - With Mindtap
5th Edition
ISBN: 9781305360990
Author: Garber
Publisher: CENGAGE L
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7, Problem 11P
To determine
The new pavement design for the right turn, where the
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Highway curve with a radius of 300m is to be super elevated to accomodate a normal speed of 72 kph. Calculate the required super elevation e if the width b of the pavement is 10m
A one lane loop ramp at the northwest quadrant of an interchange, this loop ramp is for northbound vehicles to change travel directions towards the west. The friction factor between the tire and the pavement is 0.095. If the design speed is 35 mph and the radius of the loop ramp is 545 ft measured to the centerline What should be the super elevation ?
A six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLw = 6.0
mph) 4 ft from the right edge of the traveled pavement (fic = 0.8 mph). There are five ramps within three miles
upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A
directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in
the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6%
recreational vehicles (ER = 2.0).
1.) What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)?
2.) What is the peak-hour factor
3.) What is the heavy-vehicle adjustment factor?
4.) What is the service flow rate?
5.) What is the service measure value if the average speed of the traffic stream is 65 mph
Chapter 7 Solutions
Traffic and Highway Engineering - With Mindtap
Ch. 7 - Prob. 1PCh. 7 - Prob. 2PCh. 7 - Prob. 3PCh. 7 - Prob. 4PCh. 7 - Prob. 5PCh. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Prob. 9PCh. 7 - Prob. 10P
Ch. 7 - Prob. 11PCh. 7 - Prob. 12PCh. 7 - Prob. 13PCh. 7 - Prob. 14PCh. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 18PCh. 7 - Prob. 19PCh. 7 - Prob. 20PCh. 7 - Prob. 21PCh. 7 - Prob. 22PCh. 7 - Prob. 23PCh. 7 - Prob. 24PCh. 7 - Prob. 25PCh. 7 - Prob. 26PCh. 7 - Prob. 27PCh. 7 - Prob. 28P
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, civil-engineering and related others by exploring similar questions and additional content below.Similar questions
- A minor 2-lane roadway with design speed of 45 mph crosses a major 2-lane roadway with design speed of 50 mph at 90 degree angle at an at-grade T-intersection. All lanes are 12 ft wide. If a stop sign is installed on the minor road, determine the dimensions ofallrequired clear sight triangles at this intersection for passenger cars(Case B, stop sign control on the minor road).arrow_forwardA six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLW = 6.0 mph) 4 ft from the right edge of the traveled pavement (fLC = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). What is the estimated free-flow speed of the traffic stream in mph (whole number, nearest 5)? What is the peak-hour factor (3 decimal places)? What is the heavy-vehicle adjustment factor (2 decimal places)? What is the service flow rate (whole number, nearest 5)? What is the service measure value if the average speed of the traffic stream is 65 mph (one decimal place)?arrow_forwardA six-lane freeway (three lanes in each direction) in rolling terrain has 10-ft lanes and obstructions (fLW = 6.0 mph) 4 ft from the right edge of the traveled pavement (fLC = 0.8 mph). There are five ramps within three miles upstream of the segment midpoint and four ramps within three miles downstream of the segment midpoint. A directional peak-hour volume of 2000 vehicles (primarily commuters) is observed, with 600 vehicles arriving in the highest 15-min flow rate period. The traffic stream contains 12% large trucks (ET = 2.5) and buses and 6% recreational vehicles (ER = 2.0). What is the peak-hour factor (3 decimal places)arrow_forward
- What is the safe stopping distance for a section of rural freeway with a design speed of 80 mi/h and maximum coefficient of skidding (forward) friction on: a) Level terrain b) 4% upgradearrow_forward55 mph roadway with two northbound through lanes (both are 11 feet in width) through an intersection. Beyond the intersection, the lanes merge into one lane. Please calculate the merge taper AND the distance the sign must be place AHEAD or upstream of the beginning of the merge. Pls hand written solutionarrow_forwardA two-lane minor road intersects a two-lane major road at 90° forming a four-leg intersection with traffic on the minor road controlled by a yield sign. A building is located 125 ft from the centerline of the outside lane of the major road and 35 ft from the centerline of the nearest lane of the minor road. a) Determine the maximum speed that can be allowed on the minor road if the speed limit on the major road is 45 mi/h. b) If the speed limit on the major road were 40 mi/h, determine the minimum distance that the building can be located from the centerline of the outside lane of the major street.arrow_forward
- A sign is located 7 ft from the edge of the pavement on a 3° horizontal curve. Determine if the sign should be relocated further from the edge of the highway to provide the necessary stopping sight distance. The two-lane highway has a design speed of 50 mph with 12-ft wide lane.arrow_forwardQu. A two-lane minor road with a +5% approach grade intersects with a four-lane undivided road. Determine the minimum intersection sight distance on the major road required for a stopped single-unit truck to depart from the minor road (in the upgrade direction) and turn right onto the major road. The design speed is 30 km/h on the minor road and 50 km/h on the major road.arrow_forwardtraffic engineering - Q / A freeway is being designed to carry a heavy volume of 5000 veh / h on a regular weekday in rolling terrain . If the PHF is 0.9 and the traffic consists of 90 % passenger cars and 10 % trucks , determine the number of 12 - ft lanes required in each direction if the highway is to operate at level of service C. The free - flow speed is 70 mi / h , there is no lateral obstruction , and interchanges are 3 mi apart .arrow_forward
- A four-lane freeway with 12 ft lanes and 5 shoulders is on a 2% grade for the 1.25-mi analysis stretch. There are 2 ramps in this section. If the traffic mix is generally 6% heavy vehicles with a 70/30 SUT/TT split and a PHF of 0.8, how many vehicles can the freeway carry in the peak hour without dropping below Level of Surface (LOS) C?arrow_forwardA two-lane minor road intersects a two-lane undivided major road at 90 degrees,forming a four-leg intersection with traffic on the minor road controlled by a yield sign. A building islocated 185ft from the center line of the outside lane of the major road. The design speed on themajor road is 60 mi/h and the design speed on the minor is 35 mi/h. The approach grade on the minorroad is 3%. A passenger car on the minor road would like to cross the major road. Using theAASHTO procedure, determine the minimum distance required that the building must be from thenearest lane on the minor roadarrow_forwardA two-lane minor road intersects a four-lane undivided major road at 90 degrees,forming a four-leg intersection with traffic on the minor road controlled by a stop sign. The designspeed on the major road is 80 km/h. The approach grade on the minor road is 5%. A single unit truckon the minor road would like to make a left turn onto the major road. Using the AASHTO procedure,determine the minimum sight distance required on the major road for the truck to make a left turnonto the major road.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Traffic and Highway EngineeringCivil EngineeringISBN:9781305156241Author:Garber, Nicholas J.Publisher:Cengage Learning
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning