Principles of Highway Engineering and Traffic Analysi (NEW!!)
Principles of Highway Engineering and Traffic Analysi (NEW!!)
6th Edition
ISBN: 9781119305026
Author: Fred L. Mannering, Scott S. Washburn
Publisher: WILEY
Question
Book Icon
Chapter 7, Problem 37P
To determine

The total delay for the approach to clear the queue.

Blurred answer
Students have asked these similar questions
An approach to a signalized intersection has a saturation flow rate of 1800 veh/h. At the beginning of an effective red, there are six vehicles in the queue and vehicles arrive at 900 veh/h. The signal has a 60- second cycle with 25 seconds of effective red. What is the total vehicle delay after one cycle (assume D/D/1 queuing)?
Vehicles arrive at an intersection approach at 550 veh/h at the beginning of an effective red and 15 vehicles are left in the queue from the previous cycle (end of the effective green). Due to peak hour congestion, the arrival rate increases 50 veh/h/min. Therefore after 1 minute, the arrival rate will be 600 veh/h, after 2 minutes it is 650 veh/h. The saturation flow rate of the approach is 1800 veh/h, the cycle length is 65 seconds, and the effective green time is 30 seconds. Determine the total vehicle delay until complete queue clearance. (Assume D/D/1 queuing).
TRANSPORTATION ENGINEERING-TRAFFIC SIGNALS" Recent analysis at an approach to pre-time signalized intersection indicate that the volume-to-capacity ratio (v/c) is 0.8, htat saturation flow rate (s) is 1600 vehicles/hour, and the effective green time is 50 seconds. If the average delay, assuming D/D/1 is 11.25 seconds per vehicle, determine the arrival flow rate (vehicles/hour) and the cycle length.
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Traffic and Highway Engineering
Civil Engineering
ISBN:9781305156241
Author:Garber, Nicholas J.
Publisher:Cengage Learning