Suppose a work center has a setup plus run time of 30 minutes to make 50 parts. Also assume it takes 10 minutes to move a standard container of 50 parts to the next work center and the demand rate is one part per minute throughout the day.
- a.
Schedule this situation by drawing a picture of when work center A should be producing and idle and when movements of containers take place from A to B, the using work center. - b. How many standard containers are needed for this part to circulate from the picture in part a?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Suppose a work center has a setup plus run time of 30 minutes to make 50 parts. Also assume it takes 10 minutes to move a standard container of 50 parts to the next work center and the demand rate is one part per minute throughout the day.a. Schedule this situation by drawing a picture of when work center A should be producing and idle and when movements of containers take place from A to B, the using work center.b. How many standard containers are needed for this part to circulate from the picture in part a?c. Use the formula n = DT ÷ C to calculate the number of containers.
Jason Carter works for a producer of soaps that come inpackages of 6 each. His job is to fi ll the packages with soap, andhe is expected to process 30 packages an hour. Th e facility whereJason works uses a kanban production system in which eachcontainer holds 5 packages of soap. It takes 20 minutes to receivethe packages he needs from the previous workstation. How manykanbans are needed for the fi lling process?
3. At Golf Co. product is automated to load golf balls into packaging. On an average day, the equipmentcan load 25 cases per hour, where each case contains 20 boxes and each box contains 12 balls.After maintenance, the machine is loading a little faster so that it takes 0.2 seconds less time to load onegolf ball into a box compared with the normal speed.How many cases per hour can the machine load at this new rate?
Chapter 7 Solutions
Gen Combo Looseleaf Operations Management In Supply Chain; Connect Access Card
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Parent S requires three of component T and two of component U. Both T and Uare run on work center 30. Setup time for T is 7 hours, and run time is 0.1 hour perpiece. For component U, setup time is 8 hours, and run time is 0.2 hour per piece. Ifthe rated capacity of the work center is 120 hours, how many Ts and Us should beproduced in a week?arrow_forwardWhat is OEE and also calculate the OEE from the given data in below table. Item Data Shift Length 8 hours Breaks (2) 15 minute and (1) 30 minute Downtime 47 minutes Ideal Cycle Time 1.0 seconds Total Count 19,271 widgets Reject Count 423 widgetsarrow_forwardUpton Enterprises produces a variety of switches. Below, you will find a bill-of-material file for their simplest switch: Part A. The number in the parentheses represents the number of units required for the upper level. LT stands for the lead time, measured in weeks.Assuming that Upton Enterprises has none of Switch A in inventory, and the inventory levels of Parts B, C, D, E, and F are also zero, how many weeks would it take to produce 100 units of Switch A? What would be the total requirement for part E?arrow_forward
- XYZ Production has completed the following analysis of the 9 products it makes: Product A B C D E F G H I TOTAL Daily Sales Forecast 400 250 200 150 150 150 150 75 75 1600 XYZ has an assembly line that can produce 200 units per hour and works eight hours per day: Prepare a detail daily (eight hour by hour) batch level schedule for XYZ, assuming a container size of 50 for each product.arrow_forwardOh No!, Inc., sells three models of radar detector units. It buys the three basic models (E, F, and G)from a Japanese manufacturer and adds one, two, or four lights (component DLead times are one week for all items except C, which is two weeks. There are ample suppliesof the basic units (E, F, and G) on hand. There are also 10 units of B, 10 units of C, and 25 units ofD on hand. Lot-sizing rules are lot-for-lot ordering for all items except D, which must be ordered inmultiples of 100 units. There is a scheduled receipt of 100 units of D in week 1.The master schedule calls for 40 units of A in week 4, 60 units of B in week 5, and 30 units of Cin week 6. Prepare a material requirements plan for D and its parents) to further differentiate the models. D is bought from a domestic producer.arrow_forwardA furniture factory makes two types of wooden tables,large and small. See the flowchart below.SetupTime,MinutesRun Timeper Piece,MinutesCapacity,Piecesper HourWood cutting 30 5 15Make four legs 60 10 10Make tops 60 12 8Finish the wood 20 8 12Assemble and ship 20 17 14 Small tables are made in batches of 100, and large tables are made in batches of 50. A batch includes a fixed setup time for the entire batch at each process step and a run time for each piece in the batch. Both large and small tables have the same processing times. The capacities of each process step are given, and apply to production of either type of table, as shown in the flowchart.a. What is the capacity of the system, and what is the bottleneck?b. What are the throughput times for batches of large and small tables?c. When producing at a rate of six small tables per hour on average, how many tables will be in the system?arrow_forward
- Production data show 35,920 units were transferred out of a stage of production and 6,150 units remained in ending WIP inventory that was 100% complete to material and 35% complete to conversion. The unit material cost is $5 for material and $8 for conversion. What is the amount of inventory transferred out and remaining in ending work in process inventory? Round to the whole unit and whole dollar, no decimals. Complete the tables below: Equivalent units data Units Materials Conversion Transferred out 35,920 Ending inventory 6,150 Units accounted for, equivalent units Cost data Transferred out $ Ending work in process: materials Ending work in process: conversion Ending work in process: total Costs to account for $ please fill in the blank boxesarrow_forwardProduction data show 35,920 units were transferred out of a stage of production and 6,150 units remained in ending WIP inventory that was 100% complete to material and 35% complete to conversion. The unit material cost is $5 for material and $8 for conversion. What is the amount of inventory transferred out and remaining in ending work in process inventory? Round to the whole unit and whole dollar, no decimals. Complete the tables below: Equivalent units data Units Materials Conversion Transferred out 35,920 Ending inventory 6,150 Units accounted for, equivalent units Cost data Transferred out $ Ending work in process: materials Ending work in process: conversion Ending work in process: total Costs to account for $ please fill in the information in the grid exactly as providedarrow_forward1. In an assemble-to-order company, at which level should master scheduling take place? a. The end item level b. The raw material/component level c. None of the above levels d. It does not matter, any level will do e. The component/subassembly level 2. The final assembly schedule (FAS) a. Schedules customer orders as they are received based on components planned in the MPS b. None of the above c. Is used with make-to-stock products d. Is used with make-to-order products e. A and b above 3. The functions of a master production schedule are to: I. Plan material components. II. Plan capacity requirements. III. Keep priorities valid a. II, III and not I b. None of the above is a function of the MPS c. I, II and III d. I, II and III e. I, III and not II 4.The information needed to develop a master production schedule will be got from a. Inventory levels for individual end items b. None of the above c. The production plan d. The forecast of individual end…arrow_forward
- XYZ company provides labor and space for the manufacturing and assembly operations and stocking various inventory items for production such as wire, cables, some electronic components, etc. XYZ company orders a variety of components and raw materials by contract. The company recently hired 100 part-time employees working four to six-hour shifts. Skilled employees must do several raw material conversions for packaging—there are currently three (3) such employees. The plant layout is a typical process layout - machines of similar types are located together. Each machine and employee must be scheduled over the day and the standard time period for planning is one (1) hour. Material handling is mainly done manually, although the company would like to consider conveyors or other automation to aid in automating their processes. XYZ company forecasts planned production for two (2) years on a rolling quarterly basis. Often, the customer changes the forecast, and these changes can occur as…arrow_forwardThe bill of materials shows all the parts required to make Select one: a work-in process inventory b. the MPR c.raw materials inventory d.one itemarrow_forwardThe Assembly Department started the month with 37,000 units in its beginning work in process inventory. An additional units 482,000 were transferred in from the prior department during the month to begin processing in the Assembly Department. There were 34,000 units in the ending work in process inventory of the Assembly Department. How many units were transferred to the next processing department during the month? A. none of the options B. 485,000 C. 473,000 D. 479,000arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY