Principles of Operations Management: Sustainability and Supply Chain Management Plus MyLab Operations Management with Pearson eText - Access Card Package (10th Edition)
10th Edition
ISBN: 9780134422411
Author: Jay Heizer, Barry Render, Chuck Munson
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 7.S, Problem 21P
a)
Summary Introduction
To determine: The break-even point in units.
Introduction:
Break-even point (BEP):
The break-even point is measured in units or in sales term to identify the point in a business which is required to cover the total investment costs. The total profit at break-even point is zero.
b)
Summary Introduction
To determine: The break-even point in dollars.
c)
Summary Introduction
To determine: The profit at 100,000 units.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Select the right answer.
1. The crossover point between two processes A and B can be stated as
- [ ] a. variable costs of process A = Variable costs of process B
- [ ] B. Fixed costs of process A = Fixed costs of process B
- [ ] Variable costs of process A = Fixed costs of process B
- [ ] total costs of process A = total costs of Process B
2. What are the two dimensions of the service process matrix
- [ ] Degree of customization and degree of capital
- [ ] Degree of customization and degree of labor
- [ ] Degree of volume and degree of variety d
- [ ] All of the above
3. Which of the following strategies could be used when demand exceeds the capacity.
- [ ] Stimulate the market through price reductions or aggressive marketing
- [ ] Product changes.
- [ ] decreasing prices of products
- [ ] Discouraging marginally profitable business
4. Capacity decision determines which of the following?
a. whether demand will be satisfied or whether facilities will be…
Bagot Copy Shop has a volume of 125,000 black-and-whitecopies per month. Two salespeople have made presentationsto Gordon Bagot for machines of equal quality and reliability.The Print Shop 5 has a cost of $2,000 per month and a variablecost of $.03. The other machine (a Speed Copy 100 ) will costonly $1,500 per month, but the toner is more expensive, drivingthe cost per copy up to $.035. If cost and volume are the onlyconsiderations, which machine should Bagot purchase?
Jupiter Game Company manufactures pocket electronic games. Last year Jupiter sold 25,000 games at $25 each. Total costs amounted to $525,000, of which $150,000 were considered fixed costs.
In an attempt to improve its product, the company is considering replacing a component part that has a cost of $2.50 with a new and better part costing $4.50 per unit in the coming year. A new machine also would be needed to increase plant capacity. The machine would cost $18,000 with a useful life of six years and no salvage value. The company uses straight-line depreciation on all plant assets. (Ignore income taxes).
1) If management holds the sales price constant and makes the suggested changes, how many units of product must be sold in the coming year to break even?
Chapter 7 Solutions
Principles of Operations Management: Sustainability and Supply Chain Management Plus MyLab Operations Management with Pearson eText - Access Card Package (10th Edition)
Ch. 7.S - Prob. 1DQCh. 7.S - Prob. 2DQCh. 7.S - Prob. 3DQCh. 7.S - Prob. 4DQCh. 7.S - Prob. 5DQCh. 7.S - Distinguish between bottleneck time and throughput...Ch. 7.S - Prob. 7DQCh. 7.S - Prob. 8DQCh. 7.S - Prob. 9DQCh. 7.S - Prob. 10DQ
Ch. 7.S - Prob. 11DQCh. 7.S - Prob. 12DQCh. 7.S - What are the techniques available to operations...Ch. 7.S - Amy Xias plant was designed to produce 7,000...Ch. 7.S - For the post month, the plant in Problem S7.1,...Ch. 7.S - Prob. 3PCh. 7.S - Prob. 4PCh. 7.S - Prob. 5PCh. 7.S - The effective capacity and efficiency for the next...Ch. 7.S - Southeastern Oklahoma State Universitys business...Ch. 7.S - Prob. 8PCh. 7.S - Prob. 9PCh. 7.S - Prob. 10PCh. 7.S - The three-station work cell illustrated in Figure...Ch. 7.S - The three-station work cell at Pullman Mfg., Inc....Ch. 7.S - The Pullman Mfg., Inc., three-station work cell...Ch. 7.S - Prob. 14PCh. 7.S - 10 minutes per unit. Part 2 is simultaneously...Ch. 7.S - Prob. 16PCh. 7.S - Prob. 17PCh. 7.S - Using the data in Problem S7.17: a) What is the...Ch. 7.S - Prob. 19PCh. 7.S - Prob. 20PCh. 7.S - Prob. 21PCh. 7.S - Prob. 22PCh. 7.S - Prob. 23PCh. 7.S - Prob. 24PCh. 7.S - Prob. 25PCh. 7.S - Prob. 26PCh. 7.S - Prob. 27PCh. 7.S - Prob. 32PCh. 7.S - Prob. 33PCh. 7.S - Prob. 34PCh. 7.S - Prob. 35PCh. 7.S - Prob. 36PCh. 7.S - Prob. 37PCh. 7.S - Prob. 38PCh. 7.S - Prob. 39PCh. 7.S - Prob. 1VCCh. 7.S - a capacity expansion plan and a new 11-story...Ch. 7.S - a capacity expansion plan and a new 11-story...Ch. 7 - Ethical Dilemma For the sake of efficiency and...Ch. 7 - Prob. 1DQCh. 7 - Prob. 2DQCh. 7 - Prob. 3DQCh. 7 - Prob. 4DQCh. 7 - Prob. 5DQCh. 7 - Prob. 6DQCh. 7 - Prob. 7DQCh. 7 - Prob. 8DQCh. 7 - Prob. 9DQCh. 7 - Prob. 10DQCh. 7 - Prob. 11DQCh. 7 - Prob. 12DQCh. 7 - Prob. 13DQCh. 7 - Prob. 14DQCh. 7 - Prob. 15DQCh. 7 - Prob. 16DQCh. 7 - Prob. 17DQCh. 7 - Prob. 18DQCh. 7 - Prob. 19DQCh. 7 - Prob. 1PCh. 7 - Usingthedatain Problem 7.1, determinethemost...Ch. 7 - Prob. 3PCh. 7 - Refer to Problem 7.1. If a contract for the second...Ch. 7 - Stan Fawcetts company is considering producing a...Ch. 7 - Prob. 6PCh. 7 - Prob. 7PCh. 7 - Prob. 8PCh. 7 - Metters Cabinets, Inc., needs to choose a...Ch. 7 - Prob. 10PCh. 7 - Nagle Electric. Inc., of Lincoln, Nebraska, must...Ch. 7 - Stapleton Manufacturing intends to increase...Ch. 7 - Prepare a flowchart for one of the following: a)...Ch. 7 - Prepare a process chart for one of the activities...Ch. 7 - Prob. 15PCh. 7 - Prob. 16PCh. 7 - Prob. 17PCh. 7 - Prob. 1CSCh. 7 - Prob. 2CSCh. 7 - Prob. 3CSCh. 7 - Process Strategy at Wheeled Coach Wheeled Coach,...Ch. 7 - Prob. 1.2VCCh. 7 - Prob. 1.3VCCh. 7 - Prob. 1.4VCCh. 7 - Alaska Airlines: 20-Minute Baggage...Ch. 7 - Prob. 2.2VCCh. 7 - Prob. 2.3VCCh. 7 - Prob. 2.4VCCh. 7 - Prob. 2.5VCCh. 7 - Prob. 3.1VCCh. 7 - Prob. 3.2VCCh. 7 - Prob. 3.3VCCh. 7 - Prob. 3.4VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A firm is selling two products, chairs and bar stools, each at $50 per unit. Chairs have a variable cost of $25, and bar stools $20. Fixed cost for the firm is $20,000. If the sales mix changes to 1. 4 (one chair sold for every four bar stools sold) what is theb break-evenpoint in dollars of sales? In units of chairs and bar stools?arrow_forwardA company manufactures 1,500,000 units of a product yearly. A new design of the productwill reduce materials cost by 20% but will increase processing cost by 8%. If materials cost is₱10.00 per unit and processing will cost ₱0.50 per unit, how much can the company afford topay for the preparation of the new design and making changes in equipment?arrow_forwarda. distinguish between systems design and systems quality. what challenges are there? b. describe the relationship between design capacity, system capacity, and actual output. how can you ensure a projected output is within the boundaries of the design capacity and system capacity?arrow_forward
- Prevar Corporation currently purchases components from one of its suppliers. The current purchase price is $1500 per component, with annual purchase volume of 750 units. The ops manager believes that this component could be made inhouse with some minor modifications to the current factory set up. Fixed cost for dedicating a line for this component is estimated at $50,000. Raw materials for the component is estimated at $900, overhead at $200 and it would take 10 hours of labor (at $20 per hour) to produce each component.arrow_forwardManufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials are introduced at the inception of the process except for a special material which is added in department 2 at 60% completion as to overhead. Inspection is done at the end of the process in both departments. Production data for Department 2 are given below: In process, beginning, (80% labor, 70% overhead)2,000 Transferred in 14,900 In process, ending (40% labor, 20% overhead) 3,000 Normal spoilage 200 Abnormal spoilage (found at 30% completion as to laborand 15% as to overhead due to internal failure) 400 Cost data for the month:In process beginning:Transferred in 15,020 Special materials 1,900 Direct labor 4,388 Overhead 11,044 Current costs:Transferred in 137,080 Special materials 14,030 Direct labor 46,000 Overhead 113,564 The cost of units transferred to finished goods is?The cost of spoilage charged to revenue is?arrow_forward3. Jonathan owns and operates 5 car window tinting shops in the Rio Grande Valley area. Each tint shops has 4 car stalls. Jonathan only operate 3 stalls at a time, leaving the other stall vacant. Based on his latest revenue reports, he is averaging 2 customers at a time receiving tint while the 3rd stall is empty. Each tint shop is open 12 hours per day. Each car or truck requires 2 hours of work A) what is Jonathan daily design capactity? B) what is Jonathan daily effective capcity? C) what is Jonathan actual out per day D) what is Jonathan utilization rate E) what is Jonathan effective utilization ratearrow_forward
- 39 The Svenson Furniture Company sells a popular coffee table that comes unassembled and includes three baskets to into the lower part of the assembled table. The percentage of good quality tables is 80%. It costs $32.00 to manufacture one table. Of the defective tables, 70% can be reworked at an additional cost of $9. If the company wants to yield 120 units per week, how many tables should they plan to build per week? Round to the nearest whole number to achieve this goal.arrow_forwardKrishna Gems Ltd has just installed Equip.-R at a cost of Rs 2,00,000. The machine has a five year life with no residual value. The annual volume of production is estimated at 1,50,000 units, which can be sold at Rs 6 per unit. Annual operating costs are estimated at Rs 2,00,000 (excluding depreciation) at this output level. Fixed costs are estimated at Rs 3 per unit for the same level of production. Krishna Gems Ltd has just come across another model called Equip.-S capable of giving the same output at an annual operating cost of Rs 1,80,000 (exclusive of depreciation). There will be no change in fixed costs. Capital cost of this machine is Rs 2,50,000 and the estimated life is for 5 years with no residual value.The company has an offer for sale of Equip.-R at Rs 1,00,000. The cost of dismantling and removal will be Rs 30,000. As the company has not yet commencedoperations, it wants to sell Machine-R and purchase Equip.-S. Nine Gems Ltd will be a zero-tax company, for seven years in…arrow_forwardgenerate earned value chart for a one year project. . Assume the data for month 1 is half the values given. PV = $41,000 EV = $38,000 AC = $42,000 BAC = $252,000arrow_forward
- A manager is trying to decide whether to purchase a certain part or to have it produced internally.Internal production could use either of two processes. One would entail a variable cost of $17 perunit and an annual fixed cost of $200,000; the other would entail a variable cost of $14 per unitand an annual fixed cost of $240,000. Three vendors are willing to provide the part. Vendor A hasa price of $20 per unit for any volume up to 30,000 units. Vendor B has a price of $22 per unit for demand of 1,000 units or less, and $18 per unit for larger quantities. Vendor C offers a price of$21 per unit for the first 1,000 units, and $19 per unit for additional units.a. If the manager anticipates an annual volume of 10,000 units, which alternative would be bestfrom a cost standpoint? For 20,000 units, which alternative would be best?arrow_forwardHow does quality planning differ depending on the criteria for functionality, system output, performance, dependability, and maintainability?arrow_forwardYou are the operations manager for a production company. You are given the technical rate of substitution between factors X2 and X1 as -4. If you will like to produce the same output but you want to decrease the use of X1 by 2 units since it cost more than X2 to acquire, how many additional units of X2 will be required?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY