Chapter 8, Problem 2CQD
Summary Introduction

To find: The number of people needed for the outgoing wire process using assembly line balancing methods for the current staffing level of 11 full time equivalent employees.

Introduction:The cash movement operating unit is responsible for transferring money from bank to any of its customers.The number of employees are 11.

Blurred answer
Students have asked these similar questions
A paced assembly line has been devised to manufacture​ calculators, as the following data​ show:                                                                                                                            LOADING... Station Work Element Assigned Work Element Time​ (min) S1 A 4.0 S2 ​D, E 0.9​, 1.5 S3 C 5.0 S4 ​B, F, G 1.1​, 1.0​, 1.3 S5 ​H, I, J 1.1​, 0.5​, 1.8 S6 K 4.0 a. What is the maximum hourly output rate from this​ line? ​(Hint​: The line can only go as fast as its slowest​ workstation.)   The maximum hourly output rate is nothing calculators per hour. ​(Enter your response as an​ integer.) B. What cycle time corresponds to this maximum output rate? C. If a worker is at each station and the line operates at this maximum output rate, how much idle time is lost during each? 10-hour shift? D. What is the line's efficiency?
A paced assembly line has been devised to manufacture calculators, as the following data show: Station Work ElementAssigned Work ElementTime (min) S1 S2 S3 S4 S5 S6 A D,E C B,F,G H,I,J K 2.7 0.6, 0.9 3.0 0.7, 0.7, 0.9 0.7, 0.3, 1.2 2.4 a. What is the maximum hourly output rate from this line? (Hint: The line can go only as fast as its slowest workstation.)b. What cycle time corresponds to this maximum output rate?c. If a worker is at each station and the line operates at this maximum output rate, how much idle time is lost during each 10-hour shift?d. What is the line’s efficiency?
An assembly line must be designed to produce 40 containers per hour. The following data give the necessary information Table 1 TASK IMMEDIATE PREDECESSOR TASK TIME  (sec) A None 60 B A 12 C B 35 D A 55 E D 10 F E 50 G F, C 5        Draw the precedence diagram. Compute the cycle time (in seconds) to achieve the desired output rate. What is the theoretical minimum number of stations? Assign the tasks to the workstation? What is the efficiency of the line? Calculate the idle time
Knowledge Booster
Background pattern image
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Text book image
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Text book image
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Text book image
Business in Action
Operations Management
ISBN:9780135198100
Author:BOVEE
Publisher:PEARSON CO
Text book image
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Text book image
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.