Chapter 9, Problem 1P
Summary Introduction
To determine: The weekly total material handling cost of the layout.
Introduction: Process layout refers to the plan or graphical representation about the design of the floor of a plant. It helps the firm to improve the efficiency of the design and it would help to improve the location of the departments.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Gordon Miller's job shop has four work areas, A, B, C, and D. Distances in feet between centers of the work areas are:
A
B
C
D
A
−
4
10
8
B
−
−
5
9
C
−
−
−
9
D
−
−
−
−
Workpieces moved per week between work areas are:
A
B
C
D
A
−
900
700
600
B
−
−
400
300
C
−
−
−
600
D
−
−
−
−
It costs Gordon
$3
to move 1 work piece 1 foot.
The weekly total material handling cost of the layout =.......
$nothing
(enter your response as a whole number).
The weekly total material handling cost of the layout =.......
nothing
dollars (enter your response as a whole number).
Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existing facility layout are shown in the figures below.
A
B
C
D
−
480
500
50
350
−
175
0
0
0
−
750
0
0
0
−
Figure 2. Existing Layout
A
B
C
D
|——30'——|——30'——|——30'——|
Part 2
a) For the existing layout, the cumulative
"load×distance"
or "movement
cost"=enter your response here
feet (enter your response as a whole number).
Answers should have a minimum of 300 words per item.
Explain the importance of Process Selection in Facility Layout
Briefly describe at least three (3) Facility Layouts, and indicate the kinds of situations in which each would be used.
Chapter 9 Solutions
Principles Of Operations Management
Ch. 9 - Prob. 1EDCh. 9 - Prob. 1DQCh. 9 - Prob. 2DQCh. 9 - Prob. 3DQCh. 9 - Prob. 4DQCh. 9 - Prob. 5DQCh. 9 - Prob. 6DQCh. 9 - Prob. 7DQCh. 9 - Prob. 8DQCh. 9 - Prob. 9DQ
Ch. 9 - Prob. 10DQCh. 9 - Prob. 11DQCh. 9 - Prob. 12DQCh. 9 - Prob. 13DQCh. 9 - Prob. 14DQCh. 9 - Prob. 15DQCh. 9 - Prob. 16DQCh. 9 - Prob. 17DQCh. 9 - Prob. 18DQCh. 9 - Prob. 1PCh. 9 - Prob. 2PCh. 9 - Prob. 3PCh. 9 - Roy Creasey Enterprises, a machine shop, is...Ch. 9 - Adam Munson Manufacturing, in Gainesville,...Ch. 9 - Prob. 6PCh. 9 - Prob. 7PCh. 9 - Prob. 8PCh. 9 - Prob. 9PCh. 9 - Six processes are to be laid out in six areas...Ch. 9 - Stanford Rosenberg Computing wants to establish an...Ch. 9 - Illinois Furniture, Inc., produces all types of...Ch. 9 - Prob. 14PCh. 9 - The Action Toy Company has decided to manufacture...Ch. 9 - Prob. 16PCh. 9 - Prob. 17PCh. 9 - Prob. 18PCh. 9 - Prob. 19PCh. 9 - Prob. 20PCh. 9 - Prob. 21PCh. 9 - Prob. 22PCh. 9 - Prob. 23PCh. 9 - Prob. 25PCh. 9 - Prob. 26PCh. 9 - Prob. 27PCh. 9 - Prob. 1CSCh. 9 - Prob. 2CSCh. 9 - Henry Coupe, the manager of a metropolitan branch...Ch. 9 - Prob. 4CSCh. 9 - Prob. 1.1VCCh. 9 - Prob. 1.2VCCh. 9 - Prob. 1.3VCCh. 9 - Prob. 1.4VCCh. 9 - Prob. 1.5VCCh. 9 - Prob. 1.6VCCh. 9 - Prob. 2.1VCCh. 9 - Prob. 2.2VCCh. 9 - Prob. 2.3VC
Knowledge Booster
Similar questions
- Consider the following tasks, times, and predecessors for an assembly of set-top cable converter boxes: TASK ELEMENT TIME (MINUTES) PRECEDING TASK A 1 — B 1 A C 2 B D 1 B E 3 C, D F 1 A G 1 F H 2 G I 1 E, H Given a cycle time of four minutes, develop two alternative layouts. Use the longest task time rule and the largest number of following tasks as a secondary criterion. What is the highest efficiency of your layout, assuming the 4-minute cycle time? Note: Enter your answer as a percentage rounded to 2 decimal places.arrow_forwardUsing the precedence diagram on page 2 of this document, we have created four layouts below. Which of these four layouts is NOT valid? The Answer is D but I don't understand why :( Can someone explain the precedence rule and how it works here? tysmmarrow_forwardAdam Munson Manufacturing, in Gainesville, Florida, wants to arrange its four work centers so as to minimize interdepartmental parts handling costs. The flows and existingfaci lity layout are shown in Figure 9.1 9. For example, to move a part from Work Center A to Work Center C is a 60-foot movement distance. It is 90 feet from A to D. a) What is the " load X distance," or "movement cost," of the layout shown?b) Provide an improved layout and compute its movement cost.arrow_forward
- A large-scale company is planning to install a factory to produce __________. As the operations manager, you are responsible for layout planning. Which type of layout is most preferable for your business? Please explain why. Please answer the question for the following: A) Airplanes B) Carsarrow_forwardIdentify the type of layout that might be most important in the following settings and illustrate such 1. Bankarrow_forwardTen labs will be assigned to the circular layout shown. Recalling a similar layout’s congestion in the halls, the new lab manager has requested an assignment that will minimize traffic between offices. Department 1 must be at location A. Develop a suitable layout using the following information?arrow_forward
- Explain product layouts and their primary benefits and drawbacks.arrow_forwardIf a factory is presently running based on Process Layout, which technique would you implement to Improve productivity, supervision and reduce Work in Process? Explain in detail the methodology of transforming the layout.?arrow_forwardA small assembly line for the assembly of power steering pumps needs to be balanced. Precedence diagram is shown below. The cycle time is determined to be 2.1 minutes. How would the line be balanced by choosing the assignable task having the longest task time first? Fill in the table below. If your answer is zero, enter "0". Round your answers to one decimal place. Station Tasks Total Time Idle Time 1 B,A,C,D 2 E,F 3 G,H,I Total What is the assembly-line efficiency? Round your answer to one decimal place. %arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.