Three departments—milling (M), drilling (D), and sawing (S)—are assigned to three work areas in Victor Berardis’s machine shop in Vent, Ohio. The number of work pieces moved per day and the distances between the centers of the work areas, in feet, follow.

Pieces Moved Between Work Areas Each Day

Chapter 9, Problem 3P, Three departmentsmilling (M), drilling (D), and sawing (S)are assigned to three work areas in Victor , example  1

Distances Between Centers of Work Areas(Departments) in Feet

Chapter 9, Problem 3P, Three departmentsmilling (M), drilling (D), and sawing (S)are assigned to three work areas in Victor , example  2

It costs $2 to move 1 workpiece 1 foot.

What is the cost?

Blurred answer
Students have asked these similar questions
Baking dog treats in her kitchen has been a simple process for Emma to manage. She has two ovens, one sink, a refrigerator, and enough room for two people to work at the same time. However, when Emma moves her business out of her home, she will have a commercial kitchen that can accommodate as many as six people working simultaneously. She had never thought of her business as “production” until the real estate agent who showed her the space asked how many production workers she needs to accommodate. At that point, Emma realized she would be running a production system. Even worse, she realized that she had never even visited a manufacturing facility or set foot on a real production floor. How will she ever manage this process?
Show your step-by-step process using the SPECIAL PURPOSE LINEAR PROGRAMMING: ASSIGNMENT METHOD to solve this problem. Four Engineers are to work on 4 projects of Dora Company. The problem is to decide which engineer should be assigned to which project. Each engineer charges different fees on each project, due to distances of the projects and the complexity of the work. The cost of assigning particular engineers to particular projects are as stated below. The objective is to find the lease cost of assignment. Engineer 1 to Projects A, B, C, D = $11k, $8k, $10k, $7k respectively.Engineer 2 to Projects A, B, C, D = $6k, $5k, $3k, $8k respectively.Engineer 3 to Projects A, B, C, D = $4k, $8k, $10k, $9k respectively.Engineer 4 to Projects A, B, C, D = $11k, $10k, $5k, $7k respectively.
A manufacturing system is used to produce a product.Each unit of product must be processed sequentially through workstations.V  ----->  W  ----->  X  ----->  Y The capacity of each workstation are as follows:Workstation V, 16 units per hour,Workstation W, 22 units per hour, Workstation X, 13 units per hour,Workstation Y, 18 units per hour. The raw material is always available in the front of workstation V. The manufacturing system has a cycle time of __________ minutes per unit. Use at least 4 decimals.You must show your calculation steps and brief explanation on your Excel spreadsheets.

Chapter 9 Solutions

By Jay Heizer Barry Render Operations Management, Sustainability and Supply Chain Management (11th) [Paperback]

Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY