Chapter 9, Problem 3P
Three departments—milling (M), drilling (D), and sawing (S)—are assigned to three work areas in Victor Berardis’s machine shop in Vent, Ohio. The number of work pieces moved per day and the distances between the centers of the work areas, in feet, follow.
Pieces Moved Between Work Areas Each Day
Distances Between Centers of Work Areas(Departments) in Feet
It costs $2 to move 1 workpiece 1 foot.
What is the cost?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Baking dog treats in her kitchen has been a simple process for Emma to manage. She has two ovens, one sink, a refrigerator, and enough room for two people to work at the same time. However, when Emma moves her business out of her home, she will have a commercial kitchen that can accommodate as many as six people working simultaneously. She had never thought of her business as “production” until the real estate agent who showed her the space asked how many production workers she needs to accommodate. At that point, Emma realized she would be running a production system. Even worse, she realized that she had never even visited a manufacturing facility or set foot on a real production floor. How will she ever manage this process?
Show your step-by-step process using the SPECIAL PURPOSE LINEAR PROGRAMMING: ASSIGNMENT METHOD to solve this problem.
Four Engineers are to work on 4 projects of Dora Company. The problem is to decide which engineer should be assigned to which project. Each engineer charges different fees on each project, due to distances of the projects and the complexity of the work. The cost of assigning particular engineers to particular projects are as stated below. The objective is to find the lease cost of assignment.
Engineer 1 to Projects A, B, C, D = $11k, $8k, $10k, $7k respectively.Engineer 2 to Projects A, B, C, D = $6k, $5k, $3k, $8k respectively.Engineer 3 to Projects A, B, C, D = $4k, $8k, $10k, $9k respectively.Engineer 4 to Projects A, B, C, D = $11k, $10k, $5k, $7k respectively.
A manufacturing system is used to produce a product.Each unit of product must be processed sequentially through workstations.V -----> W -----> X -----> Y
The capacity of each workstation are as follows:Workstation V, 16 units per hour,Workstation W, 22 units per hour, Workstation X, 13 units per hour,Workstation Y, 18 units per hour.
The raw material is always available in the front of workstation V.
The manufacturing system has a cycle time of __________ minutes per unit.
Use at least 4 decimals.You must show your calculation steps and brief explanation on your Excel spreadsheets.
Chapter 9 Solutions
By Jay Heizer Barry Render Operations Management, Sustainability and Supply Chain Management (11th) [Paperback]
Ch. 9 - Prob. 1DQCh. 9 - Prob. 2DQCh. 9 - Prob. 3DQCh. 9 - Prob. 4DQCh. 9 - Prob. 5DQCh. 9 - Prob. 6DQCh. 9 - Prob. 7DQCh. 9 - Prob. 8DQCh. 9 - What are the requirements for a focused work...Ch. 9 - Prob. 10DQ
Ch. 9 - Prob. 11DQCh. 9 - Prob. 12DQCh. 9 - Prob. 13DQCh. 9 - Prob. 14DQCh. 9 - Prob. 15DQCh. 9 - Prob. 16DQCh. 9 - Explain the concept of cross-docking.Ch. 9 - What is a heuristic? Name several that can be used...Ch. 9 - Prob. 1PCh. 9 - Prob. 2PCh. 9 - Three departmentsmilling (M), drilling (D), and...Ch. 9 - Roy Creasey Enterprises, a machine shop, is...Ch. 9 - Prob. 5PCh. 9 - Prob. 6PCh. 9 - Prob. 7PCh. 9 - Prob. 8PCh. 9 - Six processes are to be laid out in six areas...Ch. 9 - After an extensive product analysis using group...Ch. 9 - Stanford Rosenberg Computing wants to establish an...Ch. 9 - Illinois Furniture, Inc., produces all types of...Ch. 9 - Sue Helms Appliances wants to establish an...Ch. 9 - The Action Toy Company has decided to manufacture...Ch. 9 - The following table details the tasks required for...Ch. 9 - Tailwind, Inc., produces high-quality but...Ch. 9 - Prob. 17PCh. 9 - Because of the expected high demand for Mach 10,...Ch. 9 - Prob. 19PCh. 9 - Suppose production requirements in Solved Problem...Ch. 9 - The preinduction physical examination given by the...Ch. 9 - Samuel Smith's company wants to establish an...Ch. 9 - As the Cottrell Bicycle Co. of St. Louis completes...Ch. 9 - Prob. 1CSCh. 9 - Prob. 2CSCh. 9 - Prob. 3CSCh. 9 - Prob. 4CSCh. 9 - Prob. 1.1VCCh. 9 - Prob. 1.2VCCh. 9 - Prob. 1.3VCCh. 9 - Prob. 1.4VCCh. 9 - Prob. 1.5VCCh. 9 - Prob. 2.1VCCh. 9 - Prob. 2.2VCCh. 9 - Prob. 2.3VC
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A manufacturing system is used to produce a product.Each unit of product must be processed sequentially through workstations.V -----> W -----> X -----> Y The capacity of each workstation are as follows:Workstation V, 24 units per hour,Workstation W, 16 units per hour, Workstation X, 32 units per hour,Workstation Y, 26 units per hour. The raw material is always available in the front of workstation V. The utilization rate of workstation X is ________ percent. Use at least 4 decimals.You must show your calculation steps and brief explanation on your Excel spreadsheets.arrow_forwardPosh Nails Katie Posh runs an upscale nail salon. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses): Activity 1: Welcome a guest. (1 minute)Activity 2: Clip and file nails. (3 minutes)Activity 3: Paint. (5 minutes)Activity 4: Dry. (10 minutes)Activity 5: Check out the customer. (4 minutes)Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 does Activity 1. S2 does Activities 2 and 3. S3 does Activities 4 and 5. The drying process does not require server 3’s constant attention; she/he needs to only escort the customer to the salon’s drying chair (equipped with fans for drying). The time to do this is negligible. There exists only one drying chair in the salon. Assume a wage rate of $12 per hour. What are the direct labor costs for one customer (in dollars)?arrow_forwardPosh Nails Katie Posh runs an upscale nail salon. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses): Activity 1: Welcome a guest. (1 minute)Activity 2: Clip and file nails. (3 minutes)Activity 3: Paint. (5 minutes)Activity 4: Dry. (10 minutes)Activity 5: Check out the customer. (4 minutes)Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 does Activity 1. S2 does Activities 2 and 3. S3 does Activities 4 and 5. The drying process does not require server 3’s constant attention; she/he needs to only escort the customer to the salon’s drying chair (equipped with fans for drying). The time to do this is negligible. There exists only one drying chair in the salon. What is the average labor utilization of the servers (in decimal form)? Assume that there is unlimited demand and that the process only admits…arrow_forward
- Katie Posh runs an upscale nail salon. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses): Activity 1: Welcome a guest. (1 minute) Activity 2: Clip and file nails. (3 minutes) Activity 3: Paint. (5 minutes) Activity 4: Dry. (10 minutes) Activity 5: Check out the customer. (4 minutes) Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 does Activity 1. S2 does Activities 2 and 3. S3 does Activities 4 and 5. The drying process does not require server 3’s constant attention; she/he needs to only escort the customer to the salon’s drying chair (equipped with fans for drying). The time to do this is negligible. There exists only one drying chair in the salon. What is the utilization of server 2 (in decimal form)? Assume that there is unlimited demand and that the process only admits customers at the rate…arrow_forward1/ Katie Posh runs an upscale nail salon. The service process includes five activities that are conducted in the sequence described below. (The time required for each activity is shown in parentheses):Activity 1: Welcome a guest. (1 minute)Activity 2: Clip and file nails. (3 minutes)Activity 3: Paint. (5 minutes)Activity 4: Dry. (10 minutes)Activity 5: Check out the customer. (4 minutes)Three servers (S1, S2, and S3) offer the services in a worker-paced line. The assignment of tasks to servers is the following: S1 does Activity 1. S2 does Activities 2 and 3. S3 does Activities 4 and 5. The drying process does not require server 3’s constant attention; she/he needs to only escort the customer to the salon’s drying chair (equipped with fans for drying). The time to do this is negligible. There exists only one drying chair in the salon.a. What is the utilization of server 2 (in decimal form)? Assume that there is unlimited demand and that the process only admits customers at the rate of…arrow_forwardAssign the 4 departments in Table X to locations A, B, C, and D, which are separated by the distances shown in Table y, in such a way that transportation cost is minimized. Use this heuristic: assign departments with the greatest interdepartmental workflow first. (See attached table) Illustrate the configuration of the 4 departments in each of the 4 locations. Show the distances between departments and total interdepartmental workflows of department pairs.arrow_forward
- Green Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/25 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold. The optimum solution is: Number of trucks to be produced per day = ? (round your response to two decimal places).arrow_forwardGreen Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/25 of a day and 1/60 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $300 and $220, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. Part 2 The optimum solution is: Number of trucks to be produced per day = ? enter your response herearrow_forwardPart A is processed on a MILLING machine; Part B is processed on a LATHE machine. Two parts (A and B) are then assembled on an ASSEMBLY machine. Standard times, scrap rates, efficiency, and availability of each machine and the assembly are given in the table below. Determine the number of milling (M), the lathe (L) and the assembly (A) machines needed to produce 100 good parts from this production system during and 8-hour (480 minutes) shift. (Note: Round up the number of parts processed on each station and then round up the number of machines needed).arrow_forward
- Jeff Sowing Shop Jeff Sowing Shop was established in 2002 in downtown Kingston. The company currently employs one thousand five hundred (1,500) employees. In order to meet the Christmas demand, the company is considering employing an additional five hundred and fifty (550) workers and establishing a shift system. The first shift will work from 8 a.m. to 3 p.m. and the second shift from 3. p.m. to 11 p.m. Management took a decision not to pay a shift premium but told the workers in a meeting that they will be given a bonus at the end of the year providing the set targets are achieved. The workers were unhappy with the outcome of the meeting and decided to discuss the matter with their trade union. A delegation from the union met with management and the meeting ended in a stalemate. A second meeting was set to resolve the conflict. Prior to that meeting, management met and agreed that their position is right and they are not going to change. At the second meeting, both teams held their…arrow_forwardGreen Vehicle Inc., manufactures electric cars and small delivery trucks. It has just opened a new factory where the C1 car and the T1 truck can both be manufactured. To make either vehicle, processing in the assembly shop and in the paint shop are required. It takes 1/40 of a day and 1/75 of a day to paint a truck of type T1 and a car of type C1 in the paint shop, respectively. It takes 1/45 of a day to assemble either type of vehicle in the assembly shop. A T1 truck and a C1 car yield profits of $275 and $225, respectively, per vehicle sold. The aim of the objective function for Green Vehicle Inc. should be to Maximize the objective value. The optimum solution is: Number of trucks to be produced per day = nothing (round your response to two decimal places).arrow_forwardThe Gardner Theater, a community playhouse, needs to determine the lowest-cost production budget for an upcoming show. Specifically, they have to determine which set pieces to construct and which, if any, set pieces to rent from another local theater at a predetermined fee. However, the organization has only two weeks to fully construct the set before the play goes into technical rehearsals. The theater has two part-time carpenters who work up to 12 hours a week, each at $10 an hour. Additionally, the theater has a part-time scenic artist who can work 15 hours per week to paint the set and props as needed at a rate of $15 per hour. The set design requires 20 flats (walls), two hanging drops with painted scenery, and three large wooden tables (props). The number of hours required for each piece for carpentry and painting is shown below: Gardner Theater Hours Required/Piece Carpentry Painting Flats 0.5 2.0 Hanging Drops 2.0 12.0 Props 3.0 4.0 Hours Available 48.0…arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Inventory Management | Concepts, Examples and Solved Problems; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=2n9NLZTIlz8;License: Standard YouTube License, CC-BY