Chapter 9, Problem 4P
a)
Summary Introduction
To determine: The UCL and LCL for a
b)
Summary Introduction
To determine: The UCL and LCLs for a sample size of 10,000.
c)
Summary Introduction
To determine: The sample size that should be recommended.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
10. To monitor the quality of pepperoni pizzas, a quality control manager collects random samples of pizzas and evaluates them. The process mean and standard deviation for the weight and diameter of pizzas are not known. Which of the following(s) is a correct matching between the type of data collected and the choice of control chart used? Select all correct matchings.
Select one:
a.
The manager weighed the sampled pizzas and constructed a c-chart.
b.
The manager rated the appearance of sampled pizzas as acceptable or unacceptable and then constructed a c-chart.
c.
The manager counted the number of pepperonis per each inspected pizza and constructed a mean chart.
d.
The manager measured the diameter of the sampled pizzas and constructed a range chart.
What trade-offs are involved in each of these decisions?a. Deciding whether to use two-sigma or three-sigma control limits.b. Choosing between a large sample size and a smaller sample size.c. Trying to increase the capability of a process that is barely capable.
You work for Raider Data Systems where thousands of insurance records are entered by clerks each day for a variety of client firms. You are in charge of setting control limits to include 99.73% of the random variation in the data entry process when it is in control. Samples that you collected from 20 employees are shown below. You carefully examine 100 records entered by each employee and count the number of errors entered by each clerk. You also compute the proportion defective in each sample. Using a p-chart, what are the upper and lower control limits?
Sample
Errors Made
Proportion Defective
1
4
0.04
2
5
0.05
3
6
0.06
4
3
0.03
5
8
0.08
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- Your supervisor, Lisa Lehmann, has asked that you report on the output of a machine on the factory floor. This machine is supposed to be producing optical lenses with a meanweight of 50 grams and a range of 3.5 grams. The following table contains the data for a sample size of n = 6 taken during the past 3 hours: a) What are the :X-chart control limits when the machine is working properly?b) What are the R-charL control limits when the machine is working properly?c) What seems to be happening? (Hint: Graph the data points. Run charts may be helpful.)arrow_forwardA can filling process at a beverage manufacturing factory is assumed to be in control with limits of 89 plus/minus 4 had sample averages for the x-bar chart of the following : 87.1, 87, 87.2, 89, 90, 88.5, 89.5 and 88. Which of the following statement below are correct? a. None is correct b. Not enough information to determine c. Process mean is out -of-control d . Process mean is NOT out-of-controlarrow_forwardA process that is in control has a mean of 13 and a standard deviation of .7. a. Construct an x control chart if samples of size 3 are to be used (to 1 decimal). Repeat part (a) for samples of size 8 and 13 (to 2 decimals).arrow_forward
- At Webster Chemical Company, lumps in the caulking compound could cause difficulties in dispensing a smooth bead from the tube. Even when the process is in control, an average of four lumps per tube of caulk will remain. Testing for the presence of lumps destroys the product, so an analyst takes random samples. The following results are obtained: Tube No. Lumps Tube No. Lumps Tube No. Lumps 1 6 5 6 9 5 2 5 6 4 10 0 3 0 7 1 11 9 4 4 8 6 12 2 Determine the c-chart two-sigma upper and lower control limits for this process. Is the process in statistical control?arrow_forwardThe Watson Electric Company produces incandescent light bulbs. The following data on the number oflumens for 40-watt light bulbs were collected when the process was in control. a. Calculate control limits for an R-chart and an x-chart.b. Since these data were collected, some new employees were hired. A new sample obtained the following readings: 625, 592, 612, and 635. Is the process still in control?arrow_forwardThe specification limits for a product are 9.9 cm and 12.35 cm. A process that produces the product has a mean of 11.18 cm and a standard deviation of 0.52 cm. What is the process capability, Cpk? a. 0.8205 b. 1.571 c. 0.7853 d. 0.75arrow_forward
- Studies on a machine that molds plastic water pipe indicate that when it is injecting1-inch diameter pipe, the process standard deviation is 0.05 inches. The one-inchpipe has a specification of 1-inch plus or minus 0.10 inch. What is the processcapability index (Cp) if the long-run process mean is 1 inch?arrow_forwardA process that is considered to be in control measures an ingredient in ounces. Below are the last 10 samples (each of size 11 = 5) taken. The population process standard deviation, a) What is u;:?b) If::: = 3, what are the control limits for the mean chart?c) What are the control limits for the range chart?d) Is the process in control?arrow_forwardThe inner diameter of piston rings follows a normal distribution with mean 75mm and variance =9. The sample size is 5, X-bar chart is established. If L =2, what is the type I error rate when process is in-control? If we change the control limits to UCL = 78.354, and LCL = 71.646, what is Type I error rate?arrow_forward
- A manager wishes to build a control chart for a process. A total of hve (05) samples are collected with six x(06) observations within each sampleThe sample means (X-bar) are15.36, 14.61, 16.36, 20.28and 15.77 respectively. Also, the corresponding ranges are 8, 37, 4.81, 8.17 and 3.31 respectivelyThe lower and upper control limits of the x-bar chart are respectivelyarrow_forwardPertaining to the OC curve for any control chart, which of the following is INCORRECT? Select one: a. None of those listed b.OC stands for Operating Characteristics c. The error shown in the OC curve is type 2 error d. For a given sample size, the probability of error is inversely proportional to the amount of deviation (away from the target value) e. An OC curve corresponding to a larger sample size is steeperarrow_forwardThe overall average of a process you are attemptingto monitor at Gihan Edirisinghe Motors is 75 units. The processstandard deviation is 1.95, and the sample size is 11 = 10. Whatwould be the upper and lower control limits for a 3-sigma controlchart?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Operations Management
Operations Management
ISBN:9781259667473
Author:William J Stevenson
Publisher:McGraw-Hill Education
Operations and Supply Chain Management (Mcgraw-hi...
Operations Management
ISBN:9781259666100
Author:F. Robert Jacobs, Richard B Chase
Publisher:McGraw-Hill Education
Purchasing and Supply Chain Management
Operations Management
ISBN:9781285869681
Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. Patterson
Publisher:Cengage Learning
Production and Operations Analysis, Seventh Editi...
Operations Management
ISBN:9781478623069
Author:Steven Nahmias, Tava Lennon Olsen
Publisher:Waveland Press, Inc.