Concept explainers
Tax Prep Advisers, Inc. has
The company currently has 10 associates. No more than 10 new hires can be accommodated in any month because of limited training facilities. No backorders are allowed, and overtime cannot exceed 25 percent of regular-time capacity on any month. There is 110 cost for unused overtime capacity. Regular-time wages are $1,500 per month, and overtime wages are 150 percent of regular-time wages. Undertime is paid at the same rate as regular time. The hiring cost is $2,500 per person, and the layoff cost is $2,000 per person.
- Prepare a staffing plait utilizing a level workforce strategy, minimizing undertime. The plan may call for a one-time adjustment of the workforce before month 1.
- Using a chase strategy, prepare a plan that is consistent with the constraint on hiring and minimizes use of overtime.
- Prepare a mixed strategy in which the workforce level is slowly increased by two employees per month through month 5 and is then decreased by two employees per month starting in month 6 and continuing through month 12. Does this plan violate the hiring or overtime constraints set the company?
- Contrast these three plans on the basis of annual costs.
Want to see the full answer?
Check out a sample textbook solutionChapter 10 Solutions
Operations Management: Processes and Supply Chains (12th Edition) (What's New in Operations Management)
Additional Business Textbook Solutions
Principles of Operations Management: Sustainability and Supply Chain Management (10th Edition)
Principles Of Operations Management
Business in Action
Operations Management
Loose-leaf for Operations Management (The Mcgraw-hill Series in Operations and Decision Sciences)
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
- A manager must decide which type of machine to buy, A, B, or C. Machine costs (per individual machine) are as follows: Machine Cost A $ 60,000 B $ 50,000 C $ 60,000 Product forecasts and processing times on the machines are as follows: PROCCESSING TIME PER UNIT (minutes) Product AnnualDemand A B C 1 16,000 3 4 4 2 10,000 6 5 1 3 15,000 1 3 6 4 17,000 5 3 4 a. Assume that only purchasing costs are being considered. Compute the total processing time required for each machine type to meet demand, how many of each machine type would be needed, and the resulting total purchasing cost for each machine type. The machines will operate 10 hours a day, 240 days a year. (Enter total processing times as whole numbers. Round up machine quantities to the next higher whole number. Compute total purchasing costs using these rounded machine quantities. Enter the resulting total purchasing cost as a whole number. Omit the "$" sign.) Total…arrow_forwardSt. Clair's pre-school creates a budget based on 6 classrooms with an average class size of 15 students each. There are no per student variable costs as most costs are spread across all students in a classroom (for example, the teacher). The Head Teacher set the tuition at $590 per month for 8 months. For the first semester (Sep, Oct, Nov, Dec), the school had 14 students per class, but they added 12 new students to the school in for the second semester thanks to a special promotional plan. St. Clair's had budgeted $2000 for marketing, all of which historically was spent prior to the start of the school year, and this year they actually spent $1,300 in June. In November, however, when they decided to run the special promotion of 1 free month of tuition for January enrollment for the 2nd 4 month semester (Jan, Feb, Mar, Apr). In addition, they spent another $1500 for advertising this promotion. What was St. Clair's actual volume in months of student tuition if the free month is…arrow_forwardIn planning its operations for the year based on sales forecast of P 6,000,000, the company prepared the following estimated data:Cost and expensesVariableFixedDirect materialsP 1,600,000Direct labor1,400,000Factory overhead600,000900,000Selling expenses240,000360,000Administrative expenses60,000140,000P 3,900,000P 1,400,000What would be the amount of sales in pesos at the break- even point?a. P2,250,000c. P4,000,000b. P3,500,000d. P5,300,000arrow_forward
- Jack has gathered the following information for Work Center 2, the work center that directly feeds Work Center 3. Complete the input/output analysis of Work Center 2. Input Information(in hours) 4 5 6 7 8 Planned input 60 70 70 80 80 Actual input 15 25 25 30 30 Output Information(in hours) 4 5 6 7 8 Planned output 40 70 70 80 80 Actual output 45 45 45 55 80 Backlog165 hours Jack has asked you to calculate the following for Work Center 2. (a) Calculate the percentage of planned output needed to complete the planned inputs [(planned input + backlog)/ planned output] at Work Center 2.(Round your answers to 1 decimal place, e.g. 17.5.) 4 5 6 7 8 Percentage of planned output · 100% enter percentages % enter percentages Percentages shoul be # 4 through 8arrow_forwardJack has gathered the following information for Work Center 2, the work center that directly feeds Work Center 3. Complete the input/output analysis of Work Center 2. Input Information(in hours) 4 5 6 7 8 Planned input 60 70 70 80 80 Actual input 15 25 25 30 30 Output Information(in hours) 4 5 6 7 8 Planned output 40 70 70 80 80 Actual output 45 45 45 55 80 Backlog165 hours Jack has asked you to calculate the following for Work Center 2. alculate the percentage of planned input that actually happened [(actual input + backlog)/(planned input + backlog)] at Work Center 2.(Round your answers to 1 decimal place, e.g. 17.5.) 4 5 6 7 8 Actual input + Backlog Planned input + Backlog · 100% enter percentages % enter percentages % enter percentages % enter percentages % enter percentages %arrow_forwardA manager must decide which type of equipment to buy, Type A or Type B. Type A equipment cost $15,000 each, and Type B cost $11,000 each. The equipment can be operated 8 hours a day, 250 days a year. Either machine can be used to perfom two types of chemical analysis, C1 and C2. Annual service requirements and processing times are shown in the following table. Which type of equipment should be purchased, and how many of that type wil be need? The goal is to minimize total purchase cost. processing time per analysis (hr) Analysis type Annual volume A B C1 1200 1 2 C2 900 3…arrow_forward
- Management at Work Larry knows that the restaurant business is the right industry for him. Earlier this year, he opened a small restaurant offering seafood, steaks, and unique side dishes not found at other restaurants. He did not have the savings to quit his existing job as a waiter, so the new restaurant is open only Monday through Thursday nights, which is when he is not working at the other restaurant. Although the restaurant is open only 4 days per week, Larry works up to 16 hours on each of those days. He arrives early in the morning to receive deliveries from vendors and complete paperwork, and he is usually the last person to leave at night after the cleanup is finished. After 6 months, Larry was disappointed that the restaurant had not achieved the anticipated level of profits and success. It didn’t seem right that Larry could work so hard, yet still be struggling to run the business. All revenue was immediately used to pay the small staff or the vendors, so Larry was not…arrow_forwardWhat do you understand by capacity planning? Explain the decision tree modeling for capacity expansionarrow_forwardKristin Helmud is the general manager of Highland Inn, a local mid-priced hotel with 100 rooms. Her job objectives include providing resourceful and friendly service to the hotel’s guests, maintaining an 80% occupancy rate, improving the average rate received per room to $88 from the current $85, achieving a savings of 5% on all hotel costs, and reducing energy use by 10% by carefully managing the use of heating and air conditioning in unused rooms and by carefully managing the onsite laundry facility, among other means. The hotel’s owner, a partnership of seven people who own several hotels in the region, wants to structure Kristin’s future compensation to objectively reward her for achieving these goals. In the past, she has been paid an annual salary of $72,000 with no incentive pay. The incentive plan the partners developed has each of the goals weighted as follows: Measure Percent of Total Responsibility Occupancy rate (also reflects guest service quality) 20%…arrow_forward
- The Sun River beverage company is a regional producer of teas, exotic juices, and energy drinks. With an interest in healthier lifestyles, there has been an increase in demand for its sugar-free formulation. The final packing operation requires 13 tasks. Sun River bottles its sugar-free product 5 hours a day, 5 days a week. Each week, there is a demand for 3,000 bottles of this product. TASK TIME (MINUTES) PRECEDING TASK 1 0.1 — 2 0.1 1 3 0.1 2 4 0.2 2 5 0.1 2 6 0.2 3, 4, 5 7 0.1 1 8 0.1 7 9 0.2 8 10 0.1 9 11 0.2 6 12 0.2 10, 11 13 0.1 12 Using the following data, solve the assembly-line balancing problem and calculate the efficiency of your solution. Use the longest task time for your decision criteria. Note: Round your answer to the nearest whole percent.arrow_forwardDifferentiate between design capacity and capacity utilization. Briefly describe three capacity expansion strategies. An airline company must plan its fleet capacity and long-term schedule of aircraft usage. For one flight segment, the average number of customers per day is 70, which represents a 65 percentage utilization rate of the equipment assigned to the flight segment. If demand is expected to increase to 84 customers for this flight segment in three years, and management requires a capacity cushion of 25 percent, calculate the following:- the planned capacity requirement. the maximum number of customers the flight segment can accommodate. the efficiency rate of the flight segment assuming that the current effective capacity of the flight segment is 93 customers.arrow_forwardThe chairperson of the department of management at Tech wants to forecast the number of students who will enroll in operations management next semester in order to determine how many sections to schedule. The chair has accumulated the following enrollment data for the past 15 semesters: Using 2 Semester Weighted moving average compute the forecasted number of student for semester 16 the weight are 4 for the most recent semester and 2 for the older one. Semester Students Enrolled in OM 1 270 2 310 3 250 4 290 5 370 6 410 7 400 8 450 9 440 10 470 11 520 12 515 13 525 14 542 15 503arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,