Comprehensive standards and variances problem (Learning Objectives 1, 2, 3, 4, 5, & 6)
Dolson Manufacturing produces ceramic teapots. Dolson allocates overhead based on the number of direct labor hours. The company is looking into using a standard cost system and has developed the following standards (one “unit” is a batch of 100 teapots).
Standards: |
Direct material 70 pounds per batch at $4.00 per pound |
Direct labor 3.0 hours per batch at $19.00 per hour |
Variable MOH standard rate $3.00 per direct labor hour |
Predetermined fixed MOH standard rate $6.00 per direct labor hour |
Total budgeted fixed MOH cost $1,560 |
Actual cost and operating data from the most recent month follows:
Purchased 5,670 pounds at a cost of $3.90 per pound |
Used 5,000 pounds in producing 70 batches |
Actual direct labor cost of $4,554 at an average direct labor cost per hour of $19.80 |
Actual variable MOH cost $736 |
Actual fixed MOH cost $1,660 |
All manufacturing overhead is allocated on the basis of direct labor hours.
Requirements
- 1. Calculate the standard cost of one batch.
- 2. Calculate the following variances:
- a. The direct material variances.
- b. The direct labor variances.
- c. The variable manufacturing overhead variances.
- d. The fixed manufacturing overhead variances.
- 3. Have the company’s managers done a good job or a poor job controlling materials, labor, and overhead costs? Why or why not?
- 4. Describe how the company’s managers can benefit from the
standard costing system. Do you think the company should continue with the standard cost system?
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Average labor cost for the first 700 units of a product is RO 50 and the average labor cost of first 1400 units is RO 45. Average time per unit is 100 minutes. The learning ratio and the average labour cost for first 2800 units will be:
a.
80% and RO 36.000
b.
90% and RO 40.500
c.
85% and RO 38.250
d.
95% and RO 42.750
Your company has received an order for 20 units of aproduct. Th e labor cost to produce the item is $9.50 per hour. Th esetup cost for the item is $60 and material costs are $25 per unit. Th e item is sold for $92. Th e learning rate is 80 percent. Overheadis assessed at a rate of 55 percent of unit labor cost.(a) Determine the average unit cost for the 20 units if the fi rstunit takes four hours.(b) Determine the minimum number of units that need to bemade before the selling price meets or exceeds the averageunit cost.
LearnCo
LearnCo manufactures and sells one product, an abacus for classroom use, with two models, the Basic model and the Deluxe model. The company began operations on January 1, 20Y1, and is planning for 20Y2, its second year of operations, by preparing budgets from its master budget.
The company is trying to decide how many units to manufacture, how much it might spend on direct materials and direct labor, and what their factory overhead expenses might be. In addition, the company is interested in budgeting for selling and administrative costs, and in creating a budgeted income statement showing a prediction of net income for 20Y2.
You have been asked to assist the controller of LearnCo in preparing the 20Y2 budgets.
Sales Budget
The sales budget often uses the prior year’s sales as a starting point, and then sales quantities are revised for various factors such as planned advertising and promotion, projected pricing changes, and expected industry and general economic conditions.…
Chapter 11 Solutions
Managerial Accounting (5th Edition)
Ch. 11 - (Learning Objective 1) Which of the following is...Ch. 11 - (Learning Objective 2) The direct material price...Ch. 11 - Prob. 3QCCh. 11 - Prob. 4QCCh. 11 - Prob. 5QCCh. 11 - (Learning Objective 4) Which of the following is...Ch. 11 - Prob. 7QCCh. 11 - (Learning Objective 6) Which of the following is...Ch. 11 - Prob. 9QCCh. 11 - (Learning Objective 7Appendix) Which of the...
Ch. 11 - Compute the standard cost of direct materials...Ch. 11 - Compute the standard cost of direct labor...Ch. 11 - Explain a direct material variance (Learning...Ch. 11 - Prob. 11.4SECh. 11 - Calculate direct material variances when the...Ch. 11 - Calculate direct labor variances (Learning...Ch. 11 - Prob. 11.7SECh. 11 - Prob. 11.8SECh. 11 - Calculate fixed overhead variances (Learning...Ch. 11 - Calculate and interpret fixed overhead variances...Ch. 11 - Prob. 11.11SECh. 11 - Calculate and interpret overhead variances...Ch. 11 - Record costing transactions (Learning Objective 7)...Ch. 11 - Record standard costing transactions (Learning...Ch. 11 - Identify ethical standards violated (Learning...Ch. 11 - Vocabulary (Learning Objectives 1, 2, 3, 4, 5, 6)...Ch. 11 - Calculate standard cost and gross profit per unit...Ch. 11 - Calculate standard cost per unit (Learning...Ch. 11 - Calculate and explain direct material variances...Ch. 11 - Calculate missing direct material variables...Ch. 11 - Calculate and explain direct labor variances...Ch. 11 - Calculate and interpret direct material and direct...Ch. 11 - Calculate the material and labor variances...Ch. 11 - Record materials and labor transactions (Learning...Ch. 11 - Calculate the standard cost of a product before...Ch. 11 - Recognize advantages and disadvantages of standard...Ch. 11 - Compute and interpret overhead variances (Learning...Ch. 11 - Data Set for E11-28A through E11-32A Country...Ch. 11 - Data Set for E11-28A through E11-32A Country...Ch. 11 - Data Set for E11-28A through E11-32A Country...Ch. 11 - Make journal entries in a standard costing system...Ch. 11 - Prepare a standard cost income statement (Learning...Ch. 11 - Calculate standard cost and gross profit per unit...Ch. 11 - Calculate the standard cost per unit (Learning...Ch. 11 - Calculate and explain direct material variances...Ch. 11 - Calculate missing direct material variables...Ch. 11 - Calculate and explain direct labor variances...Ch. 11 - Prob. 11.38BECh. 11 - Prob. 11.39BECh. 11 - Prob. 11.40BECh. 11 - Prob. 11.41BECh. 11 - Recognize advantages and disadvantages of standard...Ch. 11 - Calculate and interpret overhead variances...Ch. 11 - Prob. 11.44BECh. 11 - Prob. 11.45BECh. 11 - Prob. 11.46BECh. 11 - Prob. 11.47BECh. 11 - Prob. 11.48BECh. 11 - Prob. 11.49APCh. 11 - Comprehensive standards and variances problem...Ch. 11 - Comprehensive standards and variances problem...Ch. 11 - Prob. 11.52APCh. 11 - Prob. 11.53APCh. 11 - Prob. 11.54BPCh. 11 - Comprehensive standards and variances problem...Ch. 11 - Comprehensive standards and variances problem...Ch. 11 - Work backward through labor variances (Learning...Ch. 11 - Determine all variances and make journal entries...Ch. 11 - Calculate labor variances in a hotel (Learning...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, accounting and related others by exploring similar questions and additional content below.Similar questions
- Esteban Products produces instructional aids, including white boards, which use colored markers instead of chalk. These are particularly popular for conference rooms in educational institutions and executive offices of large corporations. The standard cost of materials for this product is 10 pounds at $8.50 per pound. During the first month of the year, 3,600 boards were produced. Information concerning actual costs and usage of materials follows: Materials purchased 35,600 lbs. @ $8.60 Materials used 35,100 lbs. Required: 1. Compute the materials price and usage variances. 2. Prepare journal entries on Jan. 31 for all activity relating to materials.arrow_forwardLearnCo manufactures and sells one product, an abacus for classroom use, with two models, the Basic model and the Deluxe model. The company began operations on January 1, 20Y1, and is planning for 20Y2, its second year of operations, by preparing budgets from its master budget. The company is trying to decide how many units to manufacture, how much it might spend on direct materials and direct labor, and what their factory overhead expenses might be. In addition, the company is interested in budgeting for selling and administrative costs, and in creating a budgeted income statement showing a prediction of net income for 20Y2. You have been asked to assist the controller of LearnCo in preparing the 20Y2 budgets. The sales budget often uses the prior year’s sales as a starting point, and then sales quantities are revised for various factors such as planned advertising and promotion, projected pricing changes, and expected industry and general economic conditions. LearnCo has…arrow_forwardEsteban Products produces instructional aids, including white boards, which use colored markers instead of chalk. These are particularly popular for conference rooms in educational institutions and executive offices of large corporations. The standard cost of materials for this product is 12 pounds at $8.75 per pound. During the first month of the year, 3,700 boards were produced. Information concerning actual costs and usage of materials follows: Materials purchased 44,000 lbs. @ $8.85 Materials used 43,500 lbs. Required: 1. Compute the materials price and usage variances. 2. Prepare journal entries on Jan. 31 for all activity relating to materials. CHART OF ACCOUNTS General Ledger ASSETS 110 Cash 120 Accounts Receivable 131 Supplies 132 Prepaid Insurance 141 Materials 142 Work in Process 143 Overhead Control 144 Finished Goods 170 Land 180 Equipment 181 Accumulated Depreciation LIABILITIES 210…arrow_forward
- Sharon Glessing, controller for Janson Company, has noticed that the company faces a 80 percent learning rate for its specialty design line. In planning the cost of the latest design, Sharon assumed that the first set of units would take 1,100 direct labor hours. She decided to use this information in budgeting for the cost of the total project, which would involve the manufacture of 16 sets. Direct labor is paid $40 per hour. 1. Complete the table below showing results by row for total production of: one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) (Round Cumulative Total Time answers to the nearest whole number.) 2. What is the total labor cost if Janson Company makes eight sets? Sixteen sets? (Use the rounded answers in the subsequent computations). 3. Using the logarithmic function, complete the table below showing results by row for each of unit sets one through eight. (Round hour answers to two significant digits.)…arrow_forwardAssume the same information for Northern Defense as in Exercise 10-33, except that Northern Defense uses an 85% incremental unit-time learning model as a basis for predicting direct manufacturing labor-hours. (An 85% learning curve means b = -0.234465.) Q. Calculate the total variable costs of producing 2, 3, and 4 units.arrow_forwardLearnCo PARAGRAPH IS FOR ASSISTANCE TO HELP WITH THE QUESTIONS IN THE IMAGES ONLY WANT THE IMAGES ANWSERED LearnCo manufactures and sells one product, an abacus for classroom use, with two models, the Basic model and the Deluxe model. The company began operations on January 1, 20Y1, and is planning for 20Y2, its second year of operations, by preparing budgets from its master budget. The company is trying to decide how many units to manufacture, how much it might spend on direct materials and direct labor, and what their factory overhead expenses might be. In addition, the company is interested in budgeting for selling and administrative costs, and in creating a budgeted income statement showing a prediction of net income for 20Y2. You have been asked to assist the controller of LearnCo in preparing the 20Y2 budgets. Sales Budget The sales budget often uses the prior year’s sales as a starting point, and then sales quantities are revised for various factors such as planned advertising…arrow_forward
- profile-image Student question Time to preview question: 00 : 08 : 51 The Epsilon Co. have a building, which houses three production department, Alpha, Beta and Gamma, and one service department Delta. The service department, Delta is wholly involved in working for the three production departments and it is estimated that department Alpa uses 50%, department Beta uses 30% and department Gamma uses 20% of the services of department Delta. The budgeted overhead for the four departments for a period were: REQUIRED: a. Apportion the costs to the departments on the most equitable bases and calculate the overhead absorption rate, based on labour hours, for all the production department.arrow_forwardPlease answer parts 5-8 according to the images attached below. Highland Company produces a lightweight backpack that is popular with college students. Standard variable costs relating to a single backpack are given below: Standard Quantity or Hours Standard Price or Rate Standard Cost Direct materials ? $ 5.00 per yard $ ? Direct labor ? ? ? Variable manufacturing overhead ? $ 2 per direct labor-hour ? Total standard cost per unit $ ? Overhead is applied to production on the basis of direct labor-hours. During March, 780 backpacks were manufactured and sold. Selected information relating to the month’s production is given below: Materials Used Direct Labor Variable Manufacturing Overhead Total standard cost allowed* $ 15,600 $ 13,104 $ 2,496 Actual costs incurred $ 13,112 ? $ 5,491 Materials price variance ? Materials quantity variance $ 790 U Labor rate variance ? Labor efficiency variance ? Variable…arrow_forwardQuality Fender uses a standard cost system and provide the following information: 1(Click the icon to view the information.) Quality Fender allocates manufacturing overhead to production based on standard direct labor hours. Quality Fender reported the following actual results for 2024: actual number of fenders produced, 20,000; actual variable overhead, $4,610; actual fixed overhead, $24,000; actual direct labor hours, 360. Read the requirements2. Requirement 1. Compute the overhead variances for the year: variable overhead cost variance, variable overhead efficiency variance, fixed overhead cost variance, and fixed overhead volume variance. Begin with the variable overhead cost and efficiency variances. Select the required formulas, compute the variable overhead cost and efficiency variances, and identify whether each variance is favorable (F) or unfavorable (U).(You may need to simply the formula based on the data provided. Abbreviations used:…arrow_forward
- Question Content Area I AM NEEDING THE PICTURES ANWSERED THE PASSAGE IS JUST FOR ASSISTANCE TO ANSWER THE QUESTIONS Question Content Area LearnCo LearnCo manufactures and sells one product, an abacus for classroom use, with two models, the Basic model and the Deluxe model. The company began operations on January 1, 20Y1, and is planning for 20Y2, its second year of operations, by preparing budgets from its master budget. The company is trying to decide how many units to manufacture, how much it might spend on direct materials and direct labor, and what their factory overhead expenses might be. In addition, the company is interested in budgeting for selling and administrative costs, and in creating a budgeted income statement showing a prediction of net income for 20Y2. You have been asked to assist the controller of LearnCo in preparing the 20Y2 budgets. Sales Budget The sales budget often uses the prior year’s sales as a starting point, and then sales quantities are revised…arrow_forwardBordner Company manufactures HVAC (heating, ventilation, and air conditioning) systems for commercial buildings. For each new design, Bordner faces a 90 percent learning rate. On average, the first unit of a new design takes 600 hours. Direct labor is paid 25 per hour. Required: 1. Set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, and cumulative total time in hours. Show results by row for total production of one unit, two units, four units, eight units, and sixteen units. (Round hour answers to two significant digits.) 2. What is the total labor cost if Bordner makes the following number of units: one, four, sixteen? What is the average cost per system for the following number of systems: one, four, or sixteen? (Round your answers to the nearest dollar.) 3. Using the logarithmic function, set up a table with columns showing: the cumulative number of units, cumulative average time per unit in hours, cumulative total time in hours, and the time for the last unit. Show results by row for each of units one through eight. (Round answers to two significant digits.)arrow_forwardShorts Manufacturing, Inc., has implemented lean manufacturing in its Kansas City plant as a pilot program. One of its value streams produces a family of small electric tools. The value-stream team managers were quite excited about the results, as some of their efforts to eliminate waste were proving to be effective. During the most recent three weeks, the following data pertaining to the electric tool value stream were collected: Week 1: Demand = 90 units @ 40 Beginning inventory = 10 units @ 20 (5 materials and 15 conversion) Production = 90 units using 450 of material and 1,350 of conversion cost Week 2: Demand = 100 units @ 40 Beginning inventory = 10 units @ 20 (5 materials and 15 conversion) Production = 90 units using 450 of material and 1,350 of conversion cost Week 3: Demand = 90 units @ 40 Beginning inventory = 0 Production = 100 units using 500 of material and 1,500 of conversion cost Required: 1. Prepare a traditional income statement for each week. 2. Calculate the average value-stream product cost for each week. What does this cost signal, if anything? 3. Prepare a value-stream income statement for each week. Assume that any increase in inventory is valued at average cost. Comment on the financial performance of the value stream and its relationship to traditional income measurement.arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Cornerstones of Cost Management (Cornerstones Ser...AccountingISBN:9781305970663Author:Don R. Hansen, Maryanne M. MowenPublisher:Cengage Learning
Cornerstones of Cost Management (Cornerstones Ser...
Accounting
ISBN:9781305970663
Author:Don R. Hansen, Maryanne M. Mowen
Publisher:Cengage Learning
How to Estimate Project Costs: A Method for Cost Estimation; Author: Online PM Courses - Mike Clayton;https://www.youtube.com/watch?v=YQ2Wi3Jh3X0;License: Standard Youtube License