Concept explainers
a
Interpretation:
Number of days required to produce Product A, B and C.
Concept Introduction: Lean operation is a process in which a business should focus on continuous improvement with minimum resources and elimination of wastage. It is a process which is adopted by businesses to work efficiently and wastage must be reduced to the maximum level. Its main focus is to create customer satisfaction and eliminate implicit cost. Its principal is to smoothen the manufacturing process so that the operation of the business can be efficiently done. Moreover, the delegation of work is important rather than having a workload at the same team so that perfection can be attained.
a
Explanation of Solution
If the company is adopting traditional
Number of days required to produce product A is calculated by dividing the total number of boxes to be produced in a year for Product A and the number of boxes that can be produced in a day.
=
Hence, number of days required to produce Product A will be 93.75 days.
If the company is adopting traditional schedule, number of days required to produce Product B is as follows:
Number of days required to produce Product B is calculated by dividing the total number of boxes to be produced in a year for Product B and the number of boxes that can be produced in a day.
Hence, number of days required to produce Product B will be 125 days.
If the company is adopting traditional schedule, number of days required to produce product C are:
b
Interpretation:
Number of each product produced when mixed-model is adopted.
Concept Introduction: Lean operation is a process in which a business should focus on continuous improvement with minimum resources and elimination of wastage. It is a process which is adopted by businesses to work efficiently and wastage must be reduced to the maximum level. Its main focus is to create customer satisfaction and eliminate implicit cost. Its principal is to smoothen the manufacturing process so that the operation of the business can be efficiently done. Moreover, the delegation of work is important rather than having a workload at the same team so that perfection can be attained.
b
Explanation of Solution
Daily production of Product A when mixed-schedule model is adopted.
Number of product A that should be produced in a day can be computed by multiplying the daily number of production with the ratio between total numbers of Product A required to be produced in a year with total production in a year. Total production for a year will include Product A, Product B and Product C to be produced in a year. Hence, the total production in a year will be 4000 boxes).
Hence, the daily production of Product A will be 6 boxes.
Daily production of Product B when mixed-schedule model is adopted.
Number of product B that should be produced in a day can be computed by multiplying the daily number of production with the ratio between total numbers of Product B required to be produced in a year with total production in a year. Total production for a year will include Product A, Product B and Product C to be produced in a year. Hence, the total production in a year will be 4000 boxes).
Hence, the daily production of Product A will be 8 boxes.
Daily production of Product C when mixed-schedule model is adopted.
Number of product C that should be produced in a day can be computed by multiplying the daily number of production with the ratio between total numbers of Product C required to be produced in a year with total production in a year. Total production for a year will include Product A, Product B and Product C to be produced in a year. Hence, the total production in a year will be 4000 boxes).
Hence, the daily production of Product C will be 2 boxes.
c
Interpretation:
Sequence of production of products during a day.
Concept Introduction: Lean operation is a process in which a business should focus on continuous improvement with minimum resources and elimination of wastage. It is a process which is adopted by businesses to work efficiently and wastage must be reduced to the maximum level. Its main focus is to create customer satisfaction and eliminate implicit cost. Its principal is to smoothen the manufacturing process so that the operation of the business can be efficiently done. Moreover, the delegation of work is important rather than having a workload at the same team so that perfection can be attained.
c
Explanation of Solution
Company B can adopt the following order for daily mix to complete the production:
Company B has to produce 6 Boxes of Product A, 8 boxes of product B and 2 boxes of product C in a day. Hence, company B can produce the product in a following manner.
Product B, Product A, Product B, Product A, Product B, Product A, Product B, Product C, Product B, Product A, Product B, Product A, Product B, Product A, Product B, Product C.
Want to see more full solutions like this?
Chapter 12 Solutions
Practical Operations Management
- A company wants to produce 10,00 units of an item over the next three months at a uniform rate. Because of an annual shutdown in the third month, the first month has 15 working days; the second, 18 working days; and the third, 10 working days. On the average, how much should the company produce each day to level production?arrow_forwardThe Toyota Production System identified which of the following types of waste to be eliminated?A. Excess quality B. Motion C. Excess capacity D. Underproduction E. Excess demandarrow_forwardIf customers want to have 1000 units over 10 days, one should aim at producing100 units per day instead of doing 111 units per day in the beginning and then having alittle safety buffer at the end. True or false?a. Trueb. Falsearrow_forward
- Workers have an ability to pull the Andon cord during the production process to prevent overproduction in an unbalanced process. True or False?arrow_forwardAnguilla Manufacturing is interested in using the data col-lected during Value Stream Mapping to evaluate the currentstate performance of the capacity of its manual assembly lineprocess under different batch size assumptions. The avail-ability of processing per shift, after accounting for breaks anda mid-shift employee meeting, is 436 minutes. The currentoperating characteristics of each processing step are foundin the table below. Note that each step can only processone part at a time and all steps must process the same sizedbatches. a. Calculate the average processing time per unit and thecapacity at each step assuming batch sizes of:i. 10 unitsii. 20 unitsiii. 30 unitsiv. 40 unitsb. Identify the bottleneck operation and the line’s processingcapacity for each batch size listed in part a.c. Explain why batch sizes beyond 40 units will not increasethe line’s processing capacity further.arrow_forwardIf the cost of goods manufactured is higher than the cost of goods sold, which of the following is correct? A. Finished Goods Inventory has decreased. B. Work in Process Inventory has decreased C. Finished Goods Inventory has increased. D. Work in Process Inventory has increased.arrow_forward
- The demand for screens for a computer manufacturer is 10,000 per week. The lead time is 5 days, and this manufacturer wants to hold 2 days of safety stock. If the container size of computers is 200, what is the Kanban number? If the lead time improves to 4 days, what is the Kanban number? If the lead time moves out to 6 days and the manufacturer wants 3 days of safety stock, what is the Kanban number?arrow_forwardA machine makes two components; call them types A and B. It takes 250 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute. Assume there is ample demand. Suppose the machine rotates between one batch of 1,000 unties of A and 1,000 units of B. What is the utilization of the machine? answer: _____percentarrow_forwardA machine makes two components; call them types A and B. It takes 250 seconds to switch production between the component types. During that time, no production occurs. When in production, each unit of A or B requires 0.5 second to be completed. The two components, A and B, are combined in an assembly process to make a final product; call it C. The assembly step can combine the two components into 1 unit every 2 seconds, or 30 units per minute. Assume there is ample demand. Suppose the machine rotates between one batch of 1,000 untis of A and 1,000 units of B. In that case, what is the capacity of the machine in component pairs per minute, where a component pair is one unit of A and one unit of B? answer: __________ component pair per minutearrow_forward
- Bhojraj Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 30 parts. A part requires 7 minutes in milling and 9 minutes in finishing. The move time between the two operations for a complete batch is 4 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 2 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Line Item Description Traditional Philosophy Lean Manufacturing Philosophy Value-added time Non-value-added time Total lead time Value-added ratio (as a percent)arrow_forwardWhich of the following regarding the impact of batch size is WRONG? a. A large batch size increases the total time in a cycle. b. A large batch size introduces more output variation to the process. c. A large batch size generates a high level of inventory. d. A large batch size improves the capacity. But the marginal capacity improvement has a decreasing trend. e. None of the above.arrow_forward. Which of the following items would be considered an input in the operations of a softdrink manufacturer?a. Brand imageb. Bottling machinesc. Empty bottlesd. Workersarrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,Operations ManagementOperations ManagementISBN:9781259667473Author:William J StevensonPublisher:McGraw-Hill EducationOperations and Supply Chain Management (Mcgraw-hi...Operations ManagementISBN:9781259666100Author:F. Robert Jacobs, Richard B ChasePublisher:McGraw-Hill Education
- Purchasing and Supply Chain ManagementOperations ManagementISBN:9781285869681Author:Robert M. Monczka, Robert B. Handfield, Larry C. Giunipero, James L. PattersonPublisher:Cengage LearningProduction and Operations Analysis, Seventh Editi...Operations ManagementISBN:9781478623069Author:Steven Nahmias, Tava Lennon OlsenPublisher:Waveland Press, Inc.